MAINTENANCE TASK ANALYSIS
AC Type
Effective
Description
PN
: EC155 B1
: Component
: Starter Generator
: 524-031
ATA
: 80
600
1200
1500
1800
3000
2400
Hours
TSN
TSO
System Inspection
System Inspection
System Inspection
System Inspection
System Inspection
Check Brushes
Check Brushes
Check Brushes
Check Brushes
Check Brushes
Replace Bearing
Overhauled
Means (Method & Time) of Compliance
8010 CRANKING
Task Number
80/10/00/211/000/000
80/10/00/221/000/000
80/10/01/221/002/000
80/10/00/000/000/000
Starter generator
Starter generator
Starter generator
Starter generator
Description
System inspection
Check the brushes with removal of the starter generator.
Replace the bearings
Overhauled
Limit Type
TBO
Interval
600 FH
600 FH
1500 FH
3000 FH
Reference
MSM 05-20-00 ATA 80
MSM 05-10-00 ATA 80