SCCL COAL BASED THERMAL POWER PLANT (2X600 MW)
THE SINGARENI COLLIERIES COMPANY LTD.
NTPC LIMITED
(A GOVERNMENT OF INDIA ENTERPRISE)
CONSULTANCY WING
CONTRACTOR:
CONSORTIUM PARTNER
THIS DOCUMENT IS PROPERTY OF MBE AND MUST NOT BE
USED EXCEPT IN CONNECTION WITH WORK OF MBE.
REPRODUCTION, USE OR DISCLOSURE OF THE
CONTENTS OF THIS DOCUMENT TO THIRD PARTY/IES
WITHOUT EXPRESS / WRITTEN PERMISSION OF MBE IS
STRICTLY PROHIBITTED.
SIGN.
McNally Bharat Engineering Company Limited
ION EXCHANGE INDIA LIMITED
R-14, TTC MIDC INDL AREA,
RABALE, NAVI MUMBAI, 400701
MBE JOB NO.:
DOCUMENT TITLE:
BP05
PROCESS CALCULATION FOR STP (TOWNSHIP AND PLANT)
NTPC DOC. NO.:
9661-520-PVM-U-001
MBE DOC. NO.:
2-BP05-VDLET-1-013
A4-A40197-12-160
IEIL DOC. NO.:
ECOSPACE
BUSINESS PARK,
CAMPUS-2B, NEW TOWN, RAJARHAT, KOLKATA-700156
NO. OF SHEETS
REV.
NO.
1
15
1
1
Design Basis reference for process calculation
SN Design Paramaters
Unit
1 Average flow
mld
2 Average daily flow
m3/d
3 Average hourly flow
m3/h
4 Average flow
m3/s
5 Peak factor
ratio
6 Peak flow
mld
7 Peak flow
m3/d
8 Peak flow
m3/h
9 Peak flow
m3/s
10 Biochemical Oxygen Demand (BOD5 )
mg/l
11 Chemical Oxygen Demand (COD)
mg/l
12 Total Suspended Solids (TSS)
mg/l
13 TKN as N
mg/l
14 Phosphorus
mg/l
15 Total Ammonical Nitrogen
mg/l
16 Design temperature
oC
17 Min. temparature of sewage
oC
18 Max. temparature of sewage
oC
19 Sulphate
mg/l
20 Fecal Coliform
21 DO in aeration tank
22 Elevation
23 Oxygen transfer efficiency
24 Operating Hr/day
MPN/100ml
ppm
m
%
Hr
gn Basis reference for process calculation
Raw sewage
0.60
600.00
27.27
0.01
2.25
1.35
1350.00
61.36
0.017
400.00
600.00
450.00
10.00
6.00
17.00
25.00
25.00
35.00
0.00
2 x 107
2.00
15.00
35.00%
22.00
Treated Sewage
0.60
600.00
27.27
0.01
2.25
1.35
1350.00
61.36
0.02
30.00
250.00
100.00
0.50
2.00
5.00
25.00
25.00
30.00
0.00
10000.00
2.00
WATER BALANCE
Note
All flowes are in m3/hr unless specified
Air Blower
Centrifuge/sludge bed
Capacity = 680.65 m/hr @
0.45 kg/cm2
Capacity = 0.32 m/hr
Recirculation Flow
Inlet Bar screen
Inlet Sewage
Avg. Flow
27
Peak Flow
61
COD 600.00
BOD 400.00
TSS 450.00
Operating
22.00
Hr
No of unit - 1
Peak Flow 61
COD 600.00
BOD 400.00
TSS 450.00
L= 13.33 , W= 13.33 , H= 3.49
waste sludge
0.32
Flow
Secondary settling tank (Lamellar
Clarifier)
No of unit - 1
Extended aeration based aeration Tank
No of unit- 1
L= 1.5 , W=0.7 , H=0.79
17.23
Avg. Flow 44.83
COD 250.00
BOD 30.00
TSS 4000.00
L = 3 ,W = 2.5 , SWD= 4
Avg. Flow
COD
BOD
27
250.00
30.00
TSS
100.00
Clarified cum Chlorination Tank
No of unit - 1
Avg. Flow
COD
BOD
TSS
27
L= 4 , W= 3 , H= 2.5
250.00
30.00
100.00
Hypo-Chloride Dosing
Capacity = 20 LPH @ 20 m head
Bar Screen
Total Flow
No of screens
Flow per screen
Velocity at peak flow, V
Clear area of opening
Assume LD
Angle of Inclination of screen with horizontal
Projected depth of the screen
m3/sec
no
m3/sec
m/s
m2
m
deegree
Clear width of openings through racks
Clear spacing between the bars
m
mm
m
mm
m
0.148
10.000
0.010
3.000
0.003
no
13.76
14.000
15.000
16.000
Flat thickness
0.017
1.00
0.017
1.000
0.017
0.10
60.00
0.12
No of bars
say
No of Openings
say
Width of the screen
no
m
say
Velocity through screen chamber, v
0.017
1.00
0.017
1.000
Flow per screen / Velocity at peak flow, V
0.10
60.00
Assume LD / SIN (Angle of Inclination of screen with horizontal)
Clear area of opening / Projected depth of the screen
10.000
0.010
3.000
0.003
(Clear width of openings through racks / Clear spacing between the bars)-1
14.000
No of bars+1
16.000
(No of bars*Flat thickness)+(No of Openings*Clear spacing between the
bars)
0.202
0.700
0.700
Free Board
m/s
m
0.244
0.40
Length of channel required on downstream
0.937
Length of channel required on upstream
Total Length
Total Flow / ( Width of the screen*Assume LD) / No of screens
0.40
Assume LD+(Free Board/TAN(Angle of Inclination of screen with
horizontal))+(3*Width of the screen)
0.500
0.500
Length of channel required on downstream +Length of channel required on
1.437
upstream
Head loss through bar screen
For clean condition
HL= 1 /C [ V2 - v2 ] / 2g
Where
Emperical discharge coefficient for clear condition, C
V
v
therefore ,
HL
For 50% clogged condition
Emperical discharge coefficient for clear condition, C
V
v
Therefore ,
HL
Provided Length
Provided Width
Provided Height
m/s
m/s
0.600
1.000
0.244
0.080
m/s
0.700
2.000
0.700
Velocity at peak flow, V / 0.5
m/s
0.244
Total Flow / ( Width of the screen*Assume LD) / No of screens
0.287
m
m
m
1.50
0.70
0.79
0.600
1.000
Total Flow / ( Width of the screen*Assume LD) / No of screens
1.50
0.70
0.79
Extened Aeration p
0.00%
Reduction due to primary treatment
Biodegradable COD
ppm
Non Biodegradable COD
ppm
Soluble BOD
ppm
Soluble COD
ppm
effluent soluble COD
ppm
40.00
Non Biodegradable VSS
ppm
127.50
Total volatile particle, VSS
MLSS
ppm
ppm
382.50
4000.00
Growth kinetics constant only for Hetrophylic bacteria at 20oC
K
Y
Kd
Ks
Fd
Um
SRT
value
Um.
Kd.
Ks.
Um at working temperature
Kd at working temperature
Growth kinetics constant only for nitrification bacteria at 20oC
Umn
Kn
g bCOD/m3
g VSS/gbCOD
g vss/g vss.d
g bCOD/m3
unitless
g VSS/gVSS .d
Day
640.00
40.00
200.00
360.00
20.00
0.40
0.10
30.00
0.15
5.00
60.00
g/g.d
unitless
unitless
g/g.d
g/g.d
1.07
1.04
1.00
7.01
0.12
g vss/gvss.d
g NM4-N/m3
0.75
0.74
Yn
kdn
Ko
g vss/g NH4-N
g vss/gvss.d
g/m3
0.12
0.08
0.50
value
Um
Kn
kdn
Unitless
Unitless
Unitless
1.07
1.05
1.04
1.05
0.10
0.96
Um at working temperature
kdn at working temperature
Kn at working temperature
Specific growth rate Un
g/g.d
0.19
SRT
Design SRT (peak TNK/Avg TNK)
Design SRT
Day
5.23
1.00
5.23
g bCOD/m3
Solid production rate in term of Suspended particle
Heterotropic Biomass , A
kg/d
Cell debris, B
kg/d
Nitrifying bactetia biomass, C
1.09
77.71
11.34
0.40
Non bio degradable VSS in influent, D
Kg/d
kg/d
76.50
Px,tss
kg/d
222.24
Px,vss
kg/d
165.95
No of aeration tank
Volume of the Aeration tank
Liquid depth
(C/s Area of the tank)
(Length / width ratio)
no
m3
m
m2
m
1.00
444.48
2.50
177.79
1.00
width
Length
Free board
m
m
m
Retainsion time
Hr
MLVSS in aeration tank
ppm
F/M Ratio
kg/kg.d
13.33
13.33
0.50
16.30
2986.94
0.18
Oxygen requirment
Kg/day
282.30
Air requirment for mixing
Total air requirment for mixing
Kg/hr
Kg/hr
M3/hr
M3/hr/m3 of tank volume
m3/hr
12.83
36.66
30.30
1.20
680.65
Provide the Air blower of capacity
m3/hr
680.65
Air requirment
Air requirement
Relative pressure at elevation
1.00
Pb/Pa
Oxygen Saturation value at operating temperature
ppm
Oxygen Concentration at operating temperature and altutude
ppm
Sp. Wt at working temperature
KN/m3
Atm press. At working elevation and temperature
% conc of oxygen in air leaving aeration tank
m of water
%
Oxygen Concentration at operating temperature and altutude in
aeration tank
ppm
Fouling factor
8.24
8.22
9.77
10.35
19.00
8.21
0.65
0.95
0.90
SOTR
Kg/h
Air flow rate
m3/hr
Provide the air blower of capacity
m3/hr @ .5kg/cm2
Retainsion time during peak flow
Hr
Ht required to accoumodate the peak flow
Free board
m
m
Volume of the tank
m3
Waste sludge production
m3/day
Diffusers requirment
Area covered by diffusers
Total area to be coverd
No of diffusers required
m2/diffuser
m2
No
Air flow through each diffusers
m3/hr/diffusers
26.91
270.68
680.65
2.00
0.69
0.30
567.21
7.11
2
177.79
88.90
7.66
Extened Aeration process
0.00%
1.6* Biochemical Oxygen Demand (BOD5 )*(1-Reduction due
to primary treatment)
Chemical Oxygen Demand (COD)*(1-Reduction due to
primary treatment)-Biodegradable COD
Biochemical Oxygen Demand (BOD5 )*0.5* (1-Reduction due
to primary treatment)
Chemical Oxygen Demand (COD)*0.6*(1-Biodegradable COD)
Soluble COD-1.6*Soluble BOD
(1-1.6*(Biochemical Oxygen Demand (BOD5 )-Soluble BOD)/
(Chemical Oxygen Demand (COD)-Soluble COD))*Total
volatile particle, VSS
0.85*Total Suspended Solids (TSS)
4000.00
20.00
0.40
0.10
30.00
0.15
5.00
60.00
range
range
range
range
range
range
1.07
1.04
1.00
Um*Um.^(Design temperature-20)
Kd*Kd.^(Design temperature-20)
range 1.03 - 1.08
range 1.03 - 1.08
range 1-1
0.75
0.74
Range .2 - .9
range .5 - 1
5 - 40
0.3-0.5
0.06-0.20
5 - 40
0.08 - 0.2
3.0 - 13.2
Table
Table
Table
Table
Table
no
no
no
no
no
8.10
8.10
8.10
8.10
8.10
metcaff
metcaff
metcaff
metcaff
metcaff
Eddy
Eddy
Eddy
Eddy
Eddy
0.12
0.08
0.50
range 0.1- .15
range 0.05 - .15
range 0.4 - 0.6
1.07
1.05
1.04
range 1.06 - 1.123
range 1.03 - 1.123
range 1.03- 1.08
Umn*Um^(Design temperature-20)
kdn*kdn^(Design temperature-20)
Kn*Kn^(Design temperature-20)
(Um at working temperature*TKN as N/ (TKN as N+Kn at
working temperature))*(DO in aeration tank/(DO in aeration
tank+Ko))-kdn at working temperature
1/Specific growth rate Un
1.00
SRT*Design SRT (peak TNK/Avg TNK)
Say
(Ks*(1+Kd at working temperature*Design SRT ))/(Design SRT
*(Um at working temperature-Kd at working temperature)-1)
(Y*(Biodegradable COD-S)*Average daily flow/(1+Kd at
working temperature*Design SRT )/1000
(Heterotropic Biomass , A*Fd*Kd at working
temperature*Design SRT
(Average daily flow*Yn*TKN as N/(1+kdn at working
temperature*Design SRT )/1000
(Average daily flow*Non Biodegradable VSS/1000
Heterotropic Biomass , A/0.85+Cell debris, B/0.85+Non bio
degradable VSS in influent, D+Average daily flow*(Total
Suspended Solids (TSS)-Total volatile particle,
VSS)/1000+Nitrifying bactetia biomass, C/0.85
Heterotropic Biomass , A+Cell debris, B+Non bio degradable
VSS in influent, D+Nitrifying bactetia biomass, C
1.00
Px,tss*Design SRT /MLSS*1000/No of aeration tank
2.50
Volume of the Aeration tank/Liquid depth
1.00
Squire root of ((C/s Area of the tank)/(Length / width ratio))
width*(Length / width ratio)
0.50
Volume of the Aeration tank/Average daily flow*Operating
Hr/day*No of aeration tank
Px,vss / Px,tss*MLSS
Average daily flow*Biochemical Oxygen Demand (BOD5 ) / MLVSS in
aeration tank / Volume of the Aeration tank / No of aeration tank
Average daily flow*(Biodegradable COD-S)/10001.42*(Heterotropic Biomass , A+Cell debris, B+Nitrifying
bactetia biomass, C)+4.33*Average daily flow*TKN as N/1000
Oxygen requirment / Operating Hr/day
Oxygen requirment /Oxygen transfer efficiency
Air requirment/1.21
1.20
Volume of the tank*Air requirment for mixing
EXP(-9.81*28.97*(Elevation-0)/(8314*(273+Min. temparature
of sewage)))
-9*10^(-5)*Min. temparature of sewage^3+0.0083*Min.
temparature of sewage^2-0.4055*Min. temparature of
sewage+14.594
Pb/Pa*Oxygen Saturation value at operating temperature
-4*10^(-5)*Min. temparature of sewage^2-0.0007*Min.
temparature of sewage+9.8126
Pb/Pa*101.325/Sp. Wt at working temperature
19.00
Oxygen Concentration at operating temperature and
altutude/2*((Atm press. At working elevation and
temperature+Kn at working temperature)/Atm press. At
working elevation and temperature+% conc of oxygen in air
leaving aeration tank/21)
0.65
0.95
0.90
Cell debris, B*9.08*1.024^(20-Min. temparature of sewage)/
(*Fouling factor*(*Oxygen Concentration at operating
temperature and altutude-DO in aeration tank))
SOTR/ Oxygen transfer efficiency/0.27*100/Um at working
temperature
maximum between Air flow rate and Total air requirment for mixing
2.00
Peak flow / (C/s Area of the tank)*Retainsion time during peak
flow
0.30
(Liquid depth + Ht required to accoumodate the peak flow )
*(C/s Area of the tank)
Volume of the Aeration tank/SRT
2
(C/s Area of the tank)*No of aeration tank
Total area to be coverd/Area covered by diffusers
Provide the air blower of capacity / No of diffusers required
1mtr long tubular diffisers
Secondry Setling tank (Lamella Clarifier)
No of tanks
In flow(avg.)
Total Inlet flowrate (Flow + return sludge)
Plate length
Plate width
Plate thickness
Plate inclination from horz.( 55 deg)
Surface Over flow rate
no.
m3/d
m3/hr
m
m
m
Radian
m/m/day
1.00
600.00
44.83
2.40
1.20
0.01
0.96
24.00
Area required/unit
m2
41.09
Area of each plate
m2
2.88
Projected area (at inclination of 55O from horz.)
m2
1.65
Assuming plate efficiency ( Actual Emersed area in water for functional requirement)
0.85
Available Projected area of each plate
m2
1.40
([Link] plate reqd./unit)
nos.
29.27
say
Assuming no. of rows
nos.
nos.
30.00
1.00
Plates provided on each row
nos.
30.00
Distance between Lamella Plates
mm
50.00
Total distance between lamella plates
1.45
Total thk. of plates in a row
0.15
Space left because of inclination
1.38
Length of Lamella
2.98
say
3.00
SIDE CHANNEL (Q)
m3/hr
26.90
Considering velocity through channel
m3/s
m/s
0.01
0.60
C/S area required
m2
0.01
Channel width Provided
0.50
Liquid depth in Channel calculated
0.02
Provided Liquid Depth
Free board considered in Channel
m
m
0.10
0.20
Total Depth of Channel
0.30
mXm
0.5 & 0.3
Width of Lamella unit calculated excluding Wall Thickness
2.30
Total Width of Lamella unit
2.50
Length
Width Selected
Side water Depth considered
m
m
m
3.00
2.50
4.00
m3/d
m3/s
m3/s
ppm
%
ppm
7.11
0.00
0.01
100.00
1.00%
10000.00
Width & Depth of channel Considered
Return sludge calculation
Waste sludge produced
Outlet from the Secondary Clarrifier
TSS concentration in it
Return sludge Consitancy
Return sludge TSS conc.
Return sludge Flow rate
Recirculation Ratio
m3/s
0.00
m3/d
379.14
0.63
y Setling tank (Lamella Clarifier)
Refernce
1.00
600.00
44.83
2.40
1.20
0.01
0.96
24.00
Total Inlet flowrate (Flow + return
sludge)/Surface Over flow rate*Operating
Hr/day
Plate length*Plate width
Area of each plate*COS(Plate inclination from
horz.( 55 deg))
0.85
Projected area (at inclination of 55O from
horz.)*Assuming plate efficiency ( Actual
Emersed area in water for functional
requirement)
Area required/unit/Available Projected area of
each plate
30.00
1.00
([Link] plate reqd./unit)/Assuming no. of rows
50.00
(Plates provided on each row-1)*Distance
between Lamella Plates/1000
Plates provided on each row*Plate thickness
30
15-30
CPHEEO manual table no 12.1 Secondary
settling tank overflow rate for Activated sludge
process
Plate length*COS(Plate inclination from horz.
( 55 deg))
Total distance between lamella plates+Total thk.
of plates in a row +Space left because of
inclination
3.00
Total Inlet flowrate (Flow + return
sludge)/2)*1.2
0.60
SIDE CHANNEL (Q)/Considering velocity
through channel
0.50
C/S area required/Channel width Provided
0.10
0.20
Provided Liquid Depth+Free board considered
in Channel
0.5 & 0.3
(Plate width+0.1)*Assuming no. of rows)+
(Channel width Provided*2)
Width of Lamella unit calculated excluding Wall
Thickness+0.2
3.00
2.50
4.00
100.00
1.00%
10000.00
(Waste sludge produced *Return sludge TSS
conc.+Outlet from the Secondary Clarrifier*TSS
concentration in it-MLSS*Outlet from the
Secondary Clarrifier)/(MLSS-Return sludge TSS
conc.)
Return sludge Flow rate*3600*Operating Hr/day
Return sludge Flow rate / Outlet from the
Secondary Clarrifier
No. of tanks
Incoming flow (avg)
Retainsion time
Volume required
Assume the L.D.
C/S area
W:L ratio
Width
length
Volume of the Tank
Free board
Provide Length
Width
Height
Clarifier cum Chlorine contact Tank
no.
1.00
m3/day
600.00
hr.
1.00
m
25.00
m
m
m
m
m
m
m
m
m
2.00
12.50
1.00
3.54
3.54
25.00
0.50
4.0
3.0
2.5
Clarifier cum Chlorine contact Tank
1.00
600.00
1.00
Incoming flow (avg)/ 24 * Retainsion time / No. of
tanks
2.00
Volume required / Assume the L.D.
1.00
Squar Root of ( C/S area / W:L ratio)
Width * W:L ratio
Assume the L.D.*Width * length
0.50
4.0
( C/S area ) / Provide Length
Assume the L.D. + Free board
Sl no
1
Description
2
3
4
5
6
Flow rate
Number of Working dosing system
Chemicals to be dosed
Conc of Chem solution to be prepared
Dosing rate (100%)
Purity of Chemical considered
Dosing rate
Dosing rate required
8
9
10
Pump Capacity provided
Pump Head required / provided
Number of Dosing Pumps
11
Unit
m3/h
Hypo chlorite
dosing system
mg/l
% w/v
kg/h
% w/w
kg/h
27.3
1.0
4.0
5.00%
0.11
18
0.11
lph
12.1
lph
mwc
Nos
20
20
1W+1S
Storage Capacity
12
12
Volume of the tank required
m3
0.145
13
Design margin
20
14
Volume of the tank calculated
m3
0.175
15
Tank Type
Vertical Cylindrical
27.3
1.0
4.0
5.00%
Flow rate*Chemicals to be dosed / 1000
18
Flow rate * Chemicals to be dosed /1000
(Dosing rate* 1000 ) / (Conc of Chem solution to be prepared* 10) /
Number of Working dosing system/100 /( Purity of Chemical
considered/100)
20
20
1W+1S
12
Dosing rate required*Storage Capacity*Number of Working dosing
system/1000
20
Volume of the tank required* (1+(Design margin/100))
Vertical Cylindrical
Sludge druing bed
Sludge consitancy
Total waste sludge genrated from STP
Sludge quantity
Drying time
quantume of sludge genrated during this period
depth of sludge on SDB
%
kg/hr
m3/day
day
m3
m
Surface area required
Length of bed
Width of bed
m2
m
m
No of bed required
No
sludge consitancy after dying
Quantume of dried sludge
m3/hr
Filtrate from the SDB
m3/hr
M3/day
Sludge druing bed
1.00
3.23
7.11
7.00
49.76
0.30
165.85
4.50
4.50
8.19
40.00%
1.00
3.23
7.11
7.00
Sludge quantity*Drying time
0.30
quantume of sludge genrated during this
period /depth of sludge on SDB
4.50
4.50
(Surface area required/(Length of bed*Width
of bed)
40.00%
0.01
Total waste sludge genrated from STP/
(sludge consitancy after dying*10*100)
0.32
Sludge quantity-Quantume of dried sludge
7.00
Filtrate from the SDB*Operating Hr/day
Line Size Criteria
Sr.
FROM
TO
No.
1
2
3
4
5
6
Bar Screen
Collection cum FMR tank
Collection cum FMR tank
Secondary settling tank
Secondary settling tank
Secondary settling tank
Collection cum FMR tank
Secondary settling tank
Secondary settling tank
Clorine contact tank
Collection cum FMR tank
Sludge drying bed
FLOW
Velocity of flow (M/Sec)
M3/Hr
Gavity
65
45
45
27
18
18
0.6
Suction
Discharge
1.8
2
0.6
0.6
0.6
DIA Required
DIA Selected
Actual Vel.
MM
MM
M/Sec
196
94
89
126
103
103
200
100
100
200
100
100
0.58
1.59
1.59
0.24
0.64
0.64
Air line
Air blower
Collection cum aeration tank (main
header)
700
15
128
150
11.01
Collection cum aeration tank
(main header)
Collection cum aeration tank (Latterals
branches - 7 branches)
100
15
49
50
14.15
Formula used for dia required = square root of (Flow*4/(velocity of flow*Pi))