Co-Generation Coal Fired Thermal Power Plant 510 Days Tue 6/10/14 Tue 1/26/16

This document outlines the tasks, durations, dependencies, and schedule for the Yayo Co-Generation Thermal Power Plant project. The project involves designing, constructing, and commissioning a 510-day coal-fired co-generation thermal power plant. Key tasks include process design, equipment design, civil and architecture design, equipment manufacturing and supply, erection and installation, training, and testing and commissioning. The project is scheduled to be completed by January 26, 2016.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
167 views2 pages

Co-Generation Coal Fired Thermal Power Plant 510 Days Tue 6/10/14 Tue 1/26/16

This document outlines the tasks, durations, dependencies, and schedule for the Yayo Co-Generation Thermal Power Plant project. The project involves designing, constructing, and commissioning a 510-day coal-fired co-generation thermal power plant. Key tasks include process design, equipment design, civil and architecture design, equipment manufacturing and supply, erection and installation, training, and testing and commissioning. The project is scheduled to be completed by January 26, 2016.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

YAYO CO-GENERATION THERMAL POWER PLANT

ID

Task Name

Duration

Start

Finish

Predecessors

May

0
1
2

Co-Generation Coal Fired


Thermal Power Plant
1 Design
1.1 Process design

510 days

Tue 6/10/14 Tue


1/26/16

215 days
103 days

Tue 6/10/14
Tue 6/10/14
Tue 6/10/14

Mon 2/16/15
Wed 10/8/14
Thu 8/7/14

Thu 7/10/14
Thu 7/10/14
Mon 7/21/14
Mon 8/11/14
Tue 6/10/14
Tue 6/10/14
Tue 6/10/14
Tue 7/1/14
Mon 7/21/14
Fri 8/15/14
Thu 10/9/14
Thu 10/9/14
Thu 10/9/14
Mon 10/27/14
Tue 12/9/14
Sat 11/15/14
Wed 11/26/14
Fri 12/19/14

Thu 9/18/14 3FS-24 days


Tue 9/23/14 3FS-24 days
Fri 9/26/14 3FS-15 days
Wed 10/8/143FS+3 days
Wed 10/1/142FS-103 days
Thu 9/11/14
Tue 9/2/14 9FS-80 days
Sat 9/13/14 9FS-62 days
Wed 9/17/149FS-45 days
Wed 10/1/149FS-23 days
Thu 2/5/15 8FS+7 days
Sat 1/17/15
Sat 12/6/14 15FS-86 days
Fri 12/12/14 15FS-71 days
Thu 2/5/15 15FS-34 days
Sat 1/3/15 15FS-54 days
Fri 1/9/15 15FS-45 days
Mon
14FS-41
2/16/15
days
Mon 2/16/15
Wed 1/14/1522FS-50 days
Sat 1/24/15 22FS-42 days
Thu 2/5/15 22FS-30 days
Mon 1/18/161FS-145 days
Thu 10/30/14
Wed 12/31/1427FS-25 days
Mon 10/12/1527FS-14 days
Mon 1/18/1627FS+31 days
Sat 8/8/15 27FS+86 days
Sat 9/19/15 8FS-55
days
Thu 9/10/15
Sat 9/19/15 33FS-270 days

1.1.1 General process flow


diagram

50 days

1.1.2 material balance

60 days

1.1.3 energy balance

64 days

1.1.4 steam balance

58 days

1.1.5 water balance

50 days

1.2 equipment design

97 days

1.2.1 weight calculation

80 days

10

1.2.2 volume

72 days

11

1.2.3 thicknes determination

64 days

12

1.2.4 machine arangment

50 days

13

1.2.5 pipe and instrumentation 40 days

14

1.3 civil and archtecture design

102 days

15

1.3.1 sub and supper structure 86 days

16

1.3.2 general lay out

50 days

17

1.3.3 soil cutting and filling

40 days

18

1.3.4 under ground net work

50 days

19

1.3.5 retaining wall

42 days

20

1.3.6 out side pipe net work

38 days

21

1.4 Eectrical and automation


Design

50 days

22

1.4.1 control system

50 days

23

1.4.2 earthing

22 days

24

1.4.3 ellumunation

23 days

25

1.4.4 light

21 days

26

433 days

2 Civil works

27

2.1 soil cutt and fill

52 days

28

2.2 Retaining wall

78 days

29

2.3 Sub structure construction

311 days

30

2.4 Super structure construction

350 days

31

2.5 Access Road

156 days

358 days

32

3 Equipment manufacturing and


supply

33

3.1 Equipment manufacturing

350 days

34

3.2 Equipment supply

278 days

Project: Co-Generation Coal Fir


Date: Mon 6/16/14

Jun

Fri 12/19/14
Fri 12/19/14
Mon 12/29/14
Mon 1/12/15
Sat 8/30/14
Sat 8/30/14
Wed 10/1/14
Tue 10/14/14
Fri 12/5/14
Sat 2/7/15
Tue 7/29/14
Tue 7/29/14
Thu 10/30/14

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Task

Inactive Task

Manual Summary Rollup

External Milestone

Split

Inactive Milestone

Manual Summary

Deadline

Milestone

Inactive Summary

Start-only

Critical

Summary

Manual Task

Finish-only

Critical Split

Project Summary

Duration-only

External Tasks

Progress

Page 1

Apr

May

Jun

Jul

Aug

Manual Progress

Sep

Oct

Nov

Dec

2016
Jan

Feb

YAYO CO-GENERATION THERMAL POWER PLANT


ID

Task Name

Duration

Start

Finish

Predecessors

May

300 days

35

4 Erection and installaion

36

4.1 Main Equipment

210 days

37

4.2 Pipes network

165 days

38

4.3 Controling devices

120 days

39

366 days

5 Training

40

5.1 On Job Training

300 days

41

5.2 Operational Training

120 days

42

6 Testing and Commisioning

107 days

43

6.1 Testing

104 days

44

6.2 Commisioning

73 days

Project: Co-Generation Coal Fir


Date: Mon 6/16/14

Mon 11/17/14
Mon 11/17/14
Mon 2/16/15
Mon 6/15/15
Mon 11/17/14
Mon 11/17/14
Mon 8/31/15
Wed 9/23/15
Wed 9/23/15
Mon 11/2/15

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Mon 11/2/1532FS-263 days


Mon 7/20/15
Thu 8/27/15 36FS-132 days
Mon 11/2/1536FS-30 days
Mon 1/18/1635FS-300 days
Mon 11/2/15
Mon 1/18/1640FS-54 days
Tue 1/26/16 35FS-34 days
Fri 1/22/16
Tue 1/26/16 43FS-70 days

Task

Inactive Task

Manual Summary Rollup

External Milestone

Split

Inactive Milestone

Manual Summary

Deadline

Milestone

Inactive Summary

Start-only

Critical

Summary

Manual Task

Finish-only

Critical Split

Project Summary

Duration-only

External Tasks

Progress

Page 2

Manual Progress

Sep

Oct

Nov

Dec

2016
Jan

Feb