100% found this document useful (1 vote)
186 views2 pages

Overview of Temporary Facilities in Construction

The document is from the Technological Institute of the Philippines College of Engineering about temporary facilities for construction projects. It states that temporary facilities are erected before construction begins to house staff, workers, and deliver materials. They must provide water, electricity, and sanitation according to local codes and not be built in road rights-of-way. The contractor is responsible for maintenance and security of the temporary facilities, and for their removal upon project completion.

Uploaded by

KEN KEN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
186 views2 pages

Overview of Temporary Facilities in Construction

The document is from the Technological Institute of the Philippines College of Engineering about temporary facilities for construction projects. It states that temporary facilities are erected before construction begins to house staff, workers, and deliver materials. They must provide water, electricity, and sanitation according to local codes and not be built in road rights-of-way. The contractor is responsible for maintenance and security of the temporary facilities, and for their removal upon project completion.

Uploaded by

KEN KEN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES

1338 Arlegui St. Quiapo, Manila

COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT
CE505 CE51FA2
CONSTRUCTION METHODS AND PROJECT MANAGEMENT

TEMPORARY FACILITIES
Submitted by:

1412273
Submitted to:

Dr. ---------------Date submitted:


December 10, 2016
Rating

Temporary Facilities
These facilities are made to accommodate the staff, workers
and other personnel in the site.
It is erected before the mobilization/operation of the
construction to make a place for the materials to be delivered
and personnels necessities.
Within these facilities includes: water services, electrical
services and sanitary services which shall be in accordance
with the applicable provisions of the local governing
codes.
Temfacil must not be built within the road right-of-way.
All temporary facilities erected must be remove upon the
completion of the project it include clean-up of debris before
leaving any temporary construction site.
The contractor provides the utility man who will maintain all
the said facilities and security guards.
The cost for this facility depends on how many personnel will
be using or how big the project is.