PIPING ENGINEERING MAN-HOUR ESTIMATE
Project Name:
Client Name:
Project Number:
Project location:
REVISION
PPL
CTE Design
CTE Engineering
Date
Page 1 of 15
[Link]
DESIGN MAN-HOURS PER EQUIPMENT ITEM PCOA CODE
P.D.S. PLANT DESIGN /
P.D.S. DETAIL DESIGN
EXECUTION VALUES
Type
CLERICAL / RECORD KEEPING
Execution Plan
Budget / Estimate
Electronic File Set-up
ISO Tracking
Print / File
Close Out Report
Archive / Microfilm
Const. / Fab Questions
Const. / Fab Issues
Spool Tracking
Tie-in Summary
Fab. Coordinator (in shop)
Electronic Deliverables
PDS Support/Maint.
ERW Preparation
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
Day
Day
Day
Month
Week
Day
Day
Day
Day
Week
Day
Week
Day
Week
Item
Count
This
Item?
Item in
Structure
Number
of items
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
***
***
***
***
***
***
***
***
***
***
***
***
***
***
***
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
M/H WBS
Value Area
8.0
8.0
8.0
175.0
40.0
8.0
8.0
8.0
8.0
40.0
8.0
40.0
8.0
10.0
20.0
N
N
N
N
N
N
N
N
N
N
N
***
***
***
***
***
***
***
***
***
***
***
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.0
1.5
2.0
10.0
0.3
4.0
0.2
3.0
0.5
0.7
1.0
SUBTOTAL - UNDERGROUND
N
N
N
N
N
N
N
N
N
N
***
***
***
***
***
***
***
***
***
***
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
20.0
30.0
10.0
20.0
10.0
1.7
16.0
7.0
8.0
0.8
SUBTOTAL - FIELD
MISCELLANEOUS
Tech Review
Analog
Jacketed Lines
Dikes
AG Closed Drain System
Offsite Sleeper
Pneumatic Conveying
Sub-Contract Packages
Production Check Estimate
First Check Estimate
Late Vendor Dwg. Review
Remove Holds - Late Info.
Development Studies
Excessive Client Interface
Const. Issue P&ID Check
Steam Tracing
Audit Safety Checklist
Early Vessel Dressout
Value Improvement Practice (VIP)
Orthogen Piping Plans
Select & Place Pipe Supports LARGE BORE
Select & Place Pipe Supports SMALL BORE
SUBTOTAL - MISCELLANEOUS
U/G
Model
PI5
2.8
PI5M
U/G
U/G
Plan dwg Iso dwg
PI5
PI3
0.6
0.6
PI5D
PI3D
ERW
PT2
1.0
PT20
****
Matl.
Req'n.
PIM
0.5
PIMT
****
Build
Equip
PI2
1.0
PI2M
****
PDS
Layout
PI2
2.8
PI2M
with
Struct.
PI2
0.4
PI2M
****
PDS Pip
Design
PI3
4.9
PI3M
with
Struct.
PI3
0.7
PI3M
PDS
Annot.
PI4D
1.0
PI4D
****
PDS Pip
Check
PI3
0.7
PI3D
****
Q.A.
Review
PIG
0.2
PIG50
Heat
Trace
PI6
4.0
PI6T
****
Design
Review
PI3
0.3
PI2M
Misc
Track.
PIG
1.0
PIG
Field
Close
PIG
1.0
PIG
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
U
U
U
U
U
U
U
U
U
U
U
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
TOTAL
ELC
HOURS
13.5
TOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
8.0
3.0
2.0
1.0
1.0
7.0
1.0
40.0
80.0
15.0
8.0
8.0
100.0
40.0
12.0
2.0
8.0
10.0
8.0
15.0
with
Struct.
PI2
0.2
P12M
0.0
0.0
0.0
0.0
0.0
Dwg
Dwg
Dwg
Dwg
Dwg
Item
Per Day
Dwg
People
Dwg
****
Layout
Studies
PI2
1.5
P12M
0.0
0.0
0.0
0.0
UNDERGROUND
Light Sewer - (1 System)
Item
Medium Sewer - (2 Systems)
Item
Heavy Sewer (3 or more Systems)
Item
Cooling Water
Item
Firewater
Item
Chemical Sewer
Item
Trenches
Item
IFC As Built
Dwg
Double Contained - (1 System)
Item
Double Contained - (2 Systems)
Item
Double Contained - (3 or more SystemsItem
****
Plot
Plan
PI1
0.4
PI1D
0.0
0.0
SUBTOTAL - CLERICAL /
RECORD KEEPING
FIELD
Plans As Built - Start Revamp
Plots As Built - Start Revamp
Plans As Built - IFC
Plots As Built - IFC
Demolition (Plans)
Tie-Ins
Field Trip
Revamp Dwg (No Equip)
Safety Orientation
Demolition (Isos)
****
Supervision
PIG
1.2
PIG01
Per Day
Line
Line
Item
Line
Dwg
Line
Packages
Per Day
P&ID
Per Day
Per Day
Studies
Per Week
Dwg
Line
Per Day
Item
Per Day
Dwg
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
***
***
N
***
N
***
N
***
***
***
***
***
N
***
***
***
***
***
***
***
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Line
***
1.6
Line
***
1.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Page 2 of 15
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
[Link]
DESIGN MANHOURS PER EQUIPMENT ITEM PCOA CODE
P.D.S. PLANT DESIGN /
P.D.S. DESIGN
EXECUTION VALUES
****
Supervision
PIG
USERS NOTE: BLUE FIELDS REQUIRE USER INPUT - RED FIELDS ARE FORMULAS THAT ARE NOT TO BE CHANGED
Count
Item in
Number
ELC
WBS
1.2
KBR
Equipment
Description
This Structure? of Items
Value
Area PIG01
Class
Number
Item?
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Plot
Plan
PI1
0.4
PI1D
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Layout
Studies
PI2
1.5
P12M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
with
Struct.
PI2
0.2
P12M
U/G
Model
PI5
2.8
PI5M
U/G
U/G
Plan dwg Iso dwg
PI5
PI3
0.6
0.6
PI5D
PI3D
Matl
ERW
PT2
1.0
PT20
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Matl.
Req'n.
PIM
0.5
PIMT
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Page 3 of 15
****
Build
Equip
PI2
1.0
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
PDS
Layout
PI2
2.8
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
with
Struct.
PI2
0.4
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
PDS Pip
Design
PI3
4.9
PI3M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
with
Struct.
PI3
0.7
PI3M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
PDS
Annot.
PI4D
1
PI4D
****
PDS Pip
Check
PI3
0.7
PI3D
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Q.A.
Review
PIG
0.2
PIG50
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Heat
Trace
PI6
4.0
PI6T
****
Design
Review
PI3
0.3
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Misc
Track.
PIG
1.0
PIG
Field
Close
PIG
1.0
PIG
****
TOTAL
ELC
HOURS
13.5
TOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
ELC
per
line
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
[Link]
DESIGN MANHOURS PER EQUIPMENT ITEM PCOA CODE
P.D.S. PLANT DESIGN /
P.D.S. DESIGN
EXECUTION VALUES
****
Supervision
PIG
USERS NOTE: BLUE FIELDS REQUIRE USER INPUT - RED FIELDS ARE FORMULAS THAT ARE NOT TO BE CHANGED
Count
Item in
Number
ELC
WBS
1.2
KBR
Equipment
Description
This Structure? of Items
Value
Area PIG01
Class
Number
Item?
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
****
Plot
Plan
PI1
0.4
PI1D
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Layout
Studies
PI2
1.5
P12M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
with
Struct.
PI2
0.2
P12M
U/G
Model
PI5
2.8
PI5M
U/G
U/G
Plan dwg Iso dwg
PI5
PI3
0.6
0.6
PI5D
PI3D
Matl
ERW
PT2
1.0
PT20
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Matl.
Req'n.
PIM
0.5
PIMT
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Page 4 of 15
****
Build
Equip
PI2
1.0
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
PDS
Layout
PI2
2.8
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
with
Struct.
PI2
0.4
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
PDS Pip
Design
PI3
4.9
PI3M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
with
Struct.
PI3
0.7
PI3M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
PDS
Annot.
PI4D
1
PI4D
****
PDS Pip
Check
PI3
0.7
PI3D
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Q.A.
Review
PIG
0.2
PIG50
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Heat
Trace
PI6
4.0
PI6T
****
Design
Review
PI3
0.3
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Misc
Track.
PIG
1.0
PIG
Field
Close
PIG
1.0
PIG
****
TOTAL
ELC
HOURS
13.5
TOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
ELC
per
line
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
[Link]
DESIGN MANHOURS PER EQUIPMENT ITEM PCOA CODE
P.D.S. PLANT DESIGN /
P.D.S. DESIGN
EXECUTION VALUES
****
Supervision
PIG
USERS NOTE: BLUE FIELDS REQUIRE USER INPUT - RED FIELDS ARE FORMULAS THAT ARE NOT TO BE CHANGED
Count
Item in
Number
ELC
WBS
1.2
KBR
Equipment
Description
This Structure? of Items
Value
Area PIG01
Class
Number
Item?
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
****
Plot
Plan
PI1
0.4
PI1D
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Layout
Studies
PI2
1.5
P12M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
with
Struct.
PI2
0.2
P12M
U/G
Model
PI5
2.8
PI5M
U/G
U/G
Plan dwg Iso dwg
PI5
PI3
0.6
0.6
PI5D
PI3D
Matl
ERW
PT2
1.0
PT20
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Matl.
Req'n.
PIM
0.5
PIMT
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Page 5 of 15
****
Build
Equip
PI2
1.0
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
PDS
Layout
PI2
2.8
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
with
Struct.
PI2
0.4
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
PDS Pip
Design
PI3
4.9
PI3M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
with
Struct.
PI3
0.7
PI3M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
PDS
Annot.
PI4D
1
PI4D
****
PDS Pip
Check
PI3
0.7
PI3D
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
Q.A.
Review
PIG
0.2
PIG50
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Heat
Trace
PI6
4.0
PI6T
****
Design
Review
PI3
0.3
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Misc
Track.
PIG
1.0
PIG
Field
Close
PIG
1.0
PIG
****
TOTAL
ELC
HOURS
13.5
TOTAL
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
ELC
per
line
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
[Link]
DESIGN MANHOURS PER EQUIPMENT ITEM PCOA CODE
P.D.S. PLANT DESIGN /
P.D.S. DESIGN
EXECUTION VALUES
****
Supervision
PIG
USERS NOTE: BLUE FIELDS REQUIRE USER INPUT - RED FIELDS ARE FORMULAS THAT ARE NOT TO BE CHANGED
Count
Item in
Number
ELC
WBS
1.2
KBR
Equipment
Description
This Structure? of Items
Value
Area PIG01
Class
Number
Item?
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
N
N
0.0
0.0
0.0
Subtotal
Equipment Items / ELC
Piperack
TOTAL
WORKHOURS PER PCOA
0.0
0.0
1.5
****
Plot
Plan
PI1
0.4
PI1D
****
Layout
Studies
PI2
1.5
P12M
with
Struct.
PI2
0.2
P12M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
U/G
Model
PI5
2.8
PI5M
0.0
U/G
U/G
Plan dwg Iso dwg
PI5
PI3
0.6
0.6
PI5D
PI3D
0.0
0.0
Matl
ERW
PT2
1.0
PT20
0.0
****
Matl.
Req'n.
PIM
0.5
PIMT
****
Build
Equip
PI2
1.0
PI2M
0.0
0.0
0.0
0.0
Page 6 of 15
with
Struct.
PI2
0.4
PI2M
****
PDS Pip
Design
PI3
4.9
PI3M
with
Struct.
PI3
0.7
PI3M
PDS
Annot.
PI4D
1
PI4D
****
PDS Pip
Check
PI3
0.7
PI3D
****
Q.A.
Review
PIG
0.2
PIG50
Heat
Trace
PI6
4.0
PI6T
****
Design
Review
PI3
0.3
PI2M
Misc
Track.
PIG
1.0
PIG
Field
Close
PIG
1.0
PIG
****
TOTAL
ELC
HOURS
13.5
TOTAL
ELC
per
line
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
****
PDS
Layout
PI2
2.8
PI2M
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
[Link]
Piping Mechanical Estimate
Factors.
USERS NOTE: BLUE FIELDS REQUIRE USER INPUT - RED FIELDS ARE FORMULAS THAT ARE NOT TO BE CH
Project Factor %
Foreign Code
PI2E
0
PI3E
0
PT20
**
Foreign Standards
**Material
**Standards
N
N
**
0
0
0
0
0
N
N
****
0
0
0.3
**
0
0
**
0
0
0
0.3
0
0
**
0
Calculations
**Pipe Stress
**All
Equipment Factor
Site Conditions
* Earthquake
Project Factor
CLIENT FACTOR
Pipe Stress / Rotating eqpt. Scope
PI2E
0
PI3E
0
PT20
0
Review and approval of calculations
** Pipe Stress
** ALL
N
N
0
0
0
0
0
0
Client Support Stds & specs
ALL
Client involvement
N
N
0
0
0
0
0
0
1.3
Client factor
Coefficient of Adjustment
Page 7 of 15
[Link]
Piping Mechanical Work Hours by PCOA
USERS NOTE: BLUE FIELDS REQUIRE USER INPUT - RED FIELDS ARE FORMULAS THAT ARE NOT TO BE CHANGED
Number
of Items
Work
Hour
Value
Factor
**
**
**
Around equipment
PipeRacks
0
0
**
**
1.3
1
0
0
Special Studies
Review Client Specifications
Modify KBR or Client Specs
Write New Specifications
Installation of Pipe Supports
0
0
0
0
15
25
40
40
**
**
**
**
0
0
0
0
Special Studies
Acoustic Study
Dynamic Study
Finite Element Analysis
Major Systems
0
0
0
0
160
240
350
200
**
**
**
**
0
0
0
0
PI3E
Model/Isometric review & Support Design
**
0.5
1.7
PI5E
Underground systems
U/G Double Containment
U/G Large OD Lines
U/G Mechanical Joints
0
0
0
150
40
40
**
**
**
Mechanical Design Specialties
Standard Metallic Expansion Joints
Complex Metallic Expansion Joints
Non Metallic Joints (Rubber, Fabric, Teflon)
0
0
0
48
100
40
1
1
1
0
0
0
Single hole Orifice Plates
Series single hole orifice plates
Multi-hole orifice plates
0
0
0
8
10
20
1
1
1
0
0
0
Dike Seals
Welded plate between product & sleeve pipes
Fabric seal between product & sleeve pipes
Dike seals using metallic expansion joints
Link Seal (rubber)
0
0
0
0
6
12
60
12
1
1
1
1
0
0
0
0
Bi-metallic Transition Joints
Incoloy 800 transition piece
Aluminum to SS flange w/INVAR washers
Al. To SS transition flange (Tube-Turns type)
0
0
0
40
24
40
1
1
1
0
0
0
Special flange connections
High pressure connections (Grayloc / Reflange)
Lense Ring connections
0
0
40
40
1
1
0
0
PCOA
PIG01
PI2E
PT20
Activity Description
General Administration and Supervision
PIMT
PIG
PI2E
PI3E
PI5E
PT20
PT40
Stress Analysis & Planning Comments
Page 8 of 15
0
0
0
[Link]
PCOA
Design of Special flanges
Work
Hour
Value
60
Special piping
Vacuum piping
Refractory lined pipe
Large Diameter piping
Jacketed Piping
0
0
0
0
Special valves
Plug Valve (FCCU)
Slide Valve
Activity Description
Number
of Items
Factor
PIMT
PIG
PI2E
PI3E
PI5E
PT20
40
0
40
40
1
1
1
1
0
0
0
0
0
0
0
250
100
1
1
0
0
Miscellaneous piping Components
Transition piece & ducts for vacuum exhaust
Large diameter blank & spacer ( 24NPS +)
Straightening / turning vanes
Non-std. Strainers
Forged Y's and laterals
RV inlet forging
Bell mouth for CWS pump suction
Flexible hose (SP item)
Flexible hoses (non-SP)
Dresser Coupling
Steam probes
Mixing Tees
Injection nozzle (fixed)
Injection nozzle (removable)
Sulfur seal
Sulfur sample box
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
60
10
40
40
20
30
30
8
16
16
8
8
8
16
40
40
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Piping Specialties (SP items)
ERW Preparation for MDS & SP items
20
PT40
Pipe Support Purchasing
20
PIMT
PIMT
First Check Estimate
Production Check Estimate
N
N
**
**
**
1
PT40
PIG50
PIG90
PIG50
PIG50
Early order Pipe Supports
Calculation / Drawing Stamped
Field Check-Out
Safety Audit
Quality Audit
0
N
0
**
**
40
0.03
8
**
**
1
1
1
**
**
0
0
0
0
PIG90
Project close Out
**
**
PT20
TOTAL PCOA HOURS
0
0
0
0
Page 9 of 15
PT40
[Link]
CLASS P WORK HOURS by PCOA
USERS NOTE: BLUE FIELDS REQUIRE USER INPUT - RED FIELDS ARE FORMULAS THAT ARE NOT TO BE CHANGED
PCOA
PT40
PT50
PT60
PT61
PT70
PT71
PT80
PT81
PIG01
ACTIVITY FOR CLASS P SPECIFCATIONS
Number of Items
M/H Value
PT40
10
150
150
10
2.5
25
10
40
Review Client Specifications ( if required)
Input Number of PMC's
10
2.5
25
Develop Piping Material Classes
10
20
200
Support and Maintainance of PMCs
10
10
12
72
15
20
300
**
15
10
10
15
10
**
**
Provide bid evaluation for all bulk piping
components, prepare spec matrix for
ERW and vedor drawing review.
10 PMCs or less----- 150hrs
11-25 PMCs----------- 200hrs
26 -40 PMCs---------- 250hrs
41 -60 PMCs---------- 300hrs
61 -70 PMCs---------- 350hrs
Over 70 PMCs-------- 400hrs
Review ECCN# requirements and input
(only required for foreign project)
Develop and Maintain Index of piping
Material Classes
15 or less = 40 hrs
16 to 40
= 60hrs
41 to 80
= 80hrs
over 80
= 100hrs
Review Client Technical specifications (if
required)
Develop Technical specifications
(typical project = 15 specs)
Issue KBR or Client Standard specifications
(40-60hrs)
Support and maintenance of technical
standards and specifications
Develop PDS CAD specification
Maintain PDS specifications and provide
PDS related project support
Miscellaneous Class P (coordination,
meetings and administartion)
Subtotal - Class P Specifications
PT50
PT60
PT61
PT70
PT71
PT80
PT81
40
100
150
150
80
175
40
225
100
372
150
150
80
CLASS "P" TOTAL :
Page 10 of 15
[Link]
PIG01
1
10
5
4
15
0
8
8
4
3
68
1360
Page 11 of 15
[Link]
Piping Engineering Class V Workhours by PCOA
USERS NOTE: BLUE FIELDS REQUIRE USER INPUT - RED FIELDS ARE FORMULAS THAT ARE NOT TO BE CHANGED
PCOA
ACTIVITY FOR V CLASS SPECIFICATIONS
Is Client involved
in
Number
definition of
of Items
specifications (Y/N)
CLIENT
FACTOR
M/H
Value
PIG01
see item 6
PIG01
Review Project /Client requirements.
**
**
50
100.0
Y
Y
Y
1
1
1
1.9
1.9
1.9
40
10
15
11
3
4
**
1.6
50
12
PV30
Equipment CIF Summary (1.5 hrs/ major
equipment)
10
1.3
1.5
PV40
CIF Data Sheets
1.5
3.5
**
1.5
**
21
**
**
150
23
**
**
150
23
**
**
**
**
**
20
PV10
item 1
item 2
item 3
PV20
PV10
see item 1
see item 2
PV20
PV30
PV40
see item 3
PV50
see item 4
Class V Project Specifications (Coatings, Insulation
and Fireproofing):
Standards and Specifications (20-40hrs / spec)
Coating Data Sheets (5-10 hrs/spec)
General Data Sheets (10 - 15 hrs/GDS)
Class V Summary
76
19
29
80
20
5
PV50
item 4
item 5
PV60
Project Technical Support and Specification
Maintenance ( based on 40% of PV10, PV20, PV30
& PV40)
Technical support to Project & Estimating during
FCE & PCE estimates.
Provide Insulation, FP, & Coatings Subcontract bid
review and technical support during subcontract
execution.
137
PIG01
item 6
PIG90
Miscellaneous Class V (Coordination, Meetings,
PPL) 15% of total hrs
Perform Close Out
SUBTOTAL - CLASS V SPECIFICATIONS
200
76
19
29
80
20
137
CLASS "V" TOTAL
Page 12 of 15
[Link]
Engineering Class V Workhours by PCOA
PV50
PV60
PIG90
see item 5
150
150
20
150
150
CLASS "V" TOTAL :
Page 13 of 15
20
885
[Link]
PIPING ENGINEERING WORK HOUR ESTIMATE
Summary by Cost Codes
PCOA
Work Description
Estimated
Hours
PIG
General, Administration, Supervision, Tracking
288
PI1D
PI2M
PI2E
Plot Plan
Plant Layout & PDS Model (Design)
Plant Layout & PDS Model (Stress & Comments)
0
0
0
PI3M
PI3D
PI3E
Detail Design Model (Design)
A/G & U/G Isometrics
Detail Design Model (Mechanical)
0
0
0
PI4D
PI5D
PI5M
PI5E
A/G Piping Plans (Key Plans if required)
U/G Plan Drawings
U/G Model (Design)
U/G Model ( Mechanical)
0
0
0
0
PI6T
PIMT
Protective Heat Tracing
Material Take Off (Includes FCE, PCE)
0
0
PT20
PT40
ERWs for Bulk material and Specials
Pipe and Pipe support fabrication ERWs
0
175
PT50
PT60
PT61
Piping Material Specifications Index
Piping Material Specifications Line Classes
Piping Material Specifications Maintenance
40
225
100
PT70
PT71
Piping Technical Specifications
Piping Technical Specifications Maint.
372
150
PT80
PT81
CAD Piping Material Specifications
CAD Piping Material Specifications Maint.
150
80
PV10
PV20
PV30
PV40
PV50
PV60
PIG99
V Class standards & Specifications
V Class Summary
Equipment CIF Summary
CIFDs (Data Sheets)
Class V Specifications Support / Maint.
Class V Subcontracts
Piping Engineer at job site
124
80
20
5
287
150
2300
Piping Engineering Estimate Total
4545
Totals By Technology
Piping Design
Piping Mechanical
P Class
V Class
0
0
1360
885
Page 14 of 15
[Link]
Piping Mechanical Man Hour Estimate Assumptions and Qualifications:
It is assumed that all work will be done in HOC
Pipe stress analysis is to KBR stds no special client requirements
KBR pipe support stds are used
Hours to perform a First Check Estimate (FCE) and a production check estimate (PCE) are included
Hours to RFQ pipe supports are included
Hours for a field check of pipe supports are included
Hours for safety and quality audits are included
Class P Man Hour Estimate Assumptions and Qualifications:
This estimate is based upon maximum usage of KBR standards and specs.
Assumed all piping specs will be prepared and maintained in KBR home office.
Assumed KBR piping material control system - IPMS/Merlin/Cad spec/PDS system will be used.
Assumed PDS specs are required.
Assumed total *** piping material specs needs to be developed and loaded into PDS.
Assumed total *** project technical specs needs to be developed.
Assumed no specification interface work will be performed with other subcontractors.
Assumed no join ventures are involved.
Assumed client involvement is minimal.
Assumed no local codes and/or standards need to be followed.
Vendor bid evaluations and approval for material substitutions are included in this estimate.
If electronic vendor drawing review is required. Work-hours in PT 90 may be 20% higher.
The accuracy of this estimate is high by 10% low by 20%.
Class V Man Hour Estimate Assumptions and Qualifications:
Assume maximum use of KBR standards incorporating Client/Project requirements.
Assume minimum client involvement.
Assume no interface work with joint venture partners.
Subcontract support is limited to bid reviews and technical support during subcontract execution. Certain p
Class V involvement during construction phase for any activities other than subcontract definition and subc
We assume no out-of-phase Engineering, to ensure ERW's and supporting documentation (data sheets, spe
Except for equipment insulation surface area calculations during FCE/PCE phases, we assume no other MTO
We assume PDS piping paint and insulation MTO will be available.
It is our opinion this estimate may be high or low by 20%. Most probably it is low by 10%.
Page 15 of 15