Design of Double Lane Road Bridge
Design of Double Lane Road Bridge
[Link] Ltd
HYDERABAD
3
BRIDGE DATA
1 Formation level (RCL) = + 7.775 m
2 Clear span = 8.000 m
3 Overall span = 9.000 m
4 No. of spans = 5 No.
5 Clear width of road = 7.5 m
6 Overall Width of road = 8.45 m
7 No. of Piers = 4 No.s
8 No, of Abutments = 2 No.s
9 Type of Bridge = Double lane Road Bridge with 6.37 m
effective span Right Angle Deck Slab
without foot paths
Providing
Thickness of Wearing Coat = 0.075 m
Thickness of Deck Slab = 0.7 m
Thickness of Pier/Abutment Cap = 0.3 m
Minimum Vertical Clearance = 0.6 m
(i) Formation level = M.F.L + Minimum Vertical Clearance + Thickness of Deck slab + thickness
of wearing coat
= 6.400 + 0.6 + 0.7 + 0.075
= 7.775
(ii) Formation level = Existing Road level
= 7.000
Formation level shall be Maximum of (i) & (ii), i.e., 7.775 m
Hence provide formation level = 7.775 m
Level at bottom of slab = 7.775 - 0.075 - 0.7
= 7 m
W.C 0.075
RCL + 7.775
+ 7.000 0.7
5.850 5.850
+ 4.100 m
Afflux:
= 1.154 mts.
As the Effective Span for the present bridge is = 6.35 m, Hence RCC Soilid deck slab with 700mm
thick is proposedwith6.37m effective span
Hence the thickness of Deck slab = 0.7 m
Approach Slab:
150mm thick Approach Slab for length of 3.5m on either side of bridge in RCC M30 Grade over 300 thick
gravel base.
3
DESIGN OF PIER
Longitudinal section of pier Cross section of pier
8.450 m
7.500 m
+ 5.810 m
0.600 8.500 0.300 0.600 0.300 1.00 5.510 m
0.000 5.510 m
0.300 5.210 m
0.50 8.50 m 0.50 + 4.910 MFL
7.50 m 1.00
4.700 FSD
8.50 0.210 DBL
0.25 0.25 1.150 -0.940
0.850 -1.790
-1.790
9.00 m
1.000
a. Dead load:
1 Dead load from super structure (MOST for 9.37m spans without footpaths for normal direction) 154.78 t
2 Dead load from pier bed block(rectangular portion at top)
8.50 x 1.000 x 0.30 x 2.500 = 6.375 t
3 Weight of pier ( with semi circular cut and ease waters)
I Above pier base 8.286 x 6.450 x 2.5 = 133.607 t
ii Below FSL 8.286 x 5.850 x 2.5 = 121.179 t
4 Weight of pier with 15% buoyancy
133.61 -( 121.18 / 2.5 )x 0.15 = 126.34 t
Case : 2 17 17 17 17 12 12 8
7.630 1.370 3.050 1.370 2.130 1.520 0.430 0.000
8.500 m 0.500 8.500 m
Ra Rb
Case : 3 17 17 17 17 12 12 8
4.580 1.370 3.050 1.370 2.130 1.520 3.480 0.000
8.500 0.500 8.500 m
Ra Rb
5
Case : 4
17 17 17 17 12 12 8
3.210 1.370 3.050 1.370 2.130 1.520 3.960 0.890
8.500 0.500 8.500
Ra Rb
Case : 5 17 17 17 17 12 12 8
1.080 1.370 3.050 1.370 2.130 1.520 3.960 3.020
8.500 0.500 8.500
Ra Rb
HORIZONTAL FORCES :
b) Transverse eccentricity :-
Moment due to Live load eccentricity
[Link] load = = 64.518 t
ecccentricity = 0.500 / 2 = 0.250 m
Moment = 67.260 x 0.250 = 16.815 t.m
Taking maximum length of vehicle permitted in one span, joint to joint = 20.300 m for class A loading
The max. force will be acting on 9.000 m length of truck. with 300 kg/ m run
acting at a height of 1.50m above the road level.I.e acting at 8.105 m
wind force = 9.000 x 300/1000 = 2.7 t
moment at the base of pier = 2.7 x 9.045 = 24.422 t.m
8.105--0.94=9.045
Case(a)+Case(b) : total moment due to wind force on super structure and live load.
For Canal full condition: For Canal empty condition:
Case -A Case - B Total Case -A Case - B Total
moment at the base pier = 4.564 24.422 28.985 t 6.985 24.422 31.407 t
case -(ii) :- but as per para 212.6 of [Link] code the wind force should not be , less than 450 Kg/m ie,
With Live Load For Canal full condition: For Canal empty condition:
Max moment due to wind force at base of pier 28.99 t.m 31.41 t.m
7
moment at the base pier = 0.83 x 8.155 + 2.20 x 7.035 = 22.281 t.m
With out Live Load For Canal full condition: For Canal empty condition:
Max moment due to wind force at base of pier 28.99 t.m 31.41 t.m
Case (ii) :- The moment obtained in case (I) should not be less than the moments due to
net hydrostatic pressure with a diffference of 250 mm in water levels on oppposite faces
of the pier ( para 213.6 of I.R.C Bridge code ) Case (I) is considered even through
Case(ii) produces [Link] as the flow is regulated in the canal.
Abstract of loads
Stresses at the base of pier in t/m2 A= 8.286 m2 Zxx(road way dir)= 1.381 m3
Zyy(canal flow dir.)= 11.442 m3
Load Load Moment in Moment in Direct Bending Max Min Direct/Allow. stress
case. Load combination Road way Canal flow Stress Stress Stress Stress +
P ML MT P/A S M/Z P/A+M/Z P/A-M/Z Bending/[Link]
Service Condition
1 DL+LL 363.97 125.08 72.58 43.93 96.92 140.84 -52.99 0.187 <1
2 DL+LL+Buoy. 356.70 132.44 73.63 43.05 102.34 145.39 -59.29 0.192 <1
3 DL+LL+Wind 363.97 125.08 103.99 43.93 99.66 143.59 -55.73 0.190 <1
4 DL+LL+Buoy.+Wind 356.70 132.44 102.61 43.05 104.87 147.92 -61.82 0.195 <1
One span condition
5 DL+Buoy. 206.91 26.71 1.05 24.97 19.43 44.41 5.54 0.063 < 1
6 DL+Wind 214.18 19.35 22.28 25.85 15.96 41.81 9.89 0.061 < 1
7 DL+Buoy.+Wind 206.91 26.71 23.33 24.97 21.38 46.35 3.59 0.066 < 1
Max. stress (compression) = 147.92 '< allowable comp. Stress of concrete for M20 grade: 500 t/m2'
Min. stress (tension) = -61.82 '< allowable tensile. Stress of concrete for M20 grade: 70.5 t/m2'
Section is uncracked section as per provisions of IRC 21-2000 (WITH WIND LOAD)
Reinforcement
The main steel is provided as minimum steel as given below
As per IS-456, the min percentage of steel shall not be less than 0.8% of actual area
Case i) to resist the vertical loads including pier.
Total load = 363.97 t
Allowable direct stress for M20 = 500 t/m
Area to resist the direct load = 363.97 / 500 x 10000 = 7279 cm
Minimum steel = 0.8 x 7279 / 100 = 58.24 cm
Case ii) As per IRC - 21, 2000 the minimum steel shall not be in any case less than
0.3% of gross area
Minimum steel = 0.3 x 8.286 x 10000 / 100 = 248.57 cm
Transverse reinforcement :
As per clause 306.3.2 of IRC-21 the diameter of lateral ties works out to 8 mm minimum
As per clause 306.3.2 of IRC-21 the spacing of lateral ties works out to240 mm
However provide 10 f lateral ties at 240 mm c/c
DESIGN OF ABUTMENT
VR
+ 6.605
+ 6.530 W7
+ 6.380
+ 5.810 W2
+ 5.510 W8 W1
MFL 6.400
W5
Density of soil : 2.10 t/m3 W9 2960
Density of concrete : 2.50 t/m3
Density of Rcc : 2.50 t/m3 W6 W4 W3
(As per IRC:6-2000) 0
750 500 500
Live load surcharge : 1.20 m 2.850 0.40 A
1) REACTION ON ABUTMENT;
Dead load : Length of abutment = = 9.61 m
As per MOST drawings dead load for 9.37m span = 50.91 t
Load on abutment as per MOST= 50.91 / 2 = 25.455 t
Load coming on to abutment per m length = 50.91 / 9.61 = 8.680 t/ m
Live load :
Live load maximum as considered for pier= 67.260 /2 = 33.6
Live on abutment as per MOST for 9.37m effective span = 62.6
consider Max. of the above two cases = 62.6
Impact factor = 4.5 = 4.5 = 0.310
6+L 6+ 8.50
As the impact factor reduces to zero at 3.00 m below bed block and 0.5 times the
factor at bottom of bed block, the above factor comes down to
= 0.310 x 0.34 = 0.018 on top of concrete
2 3.00
Live load including impact per m length = 62.590 x 1.018 = 6.628 t/m
9.61
Total load coming on abutment = 8.680 + 6.628 = 15.308 t/m
FOR SKEW ANGLE OF 30 DEG.= = 1.63 X 15.308 = 24.951 t/m
2) Force due to braking effect ;
Max. stress (compre = 100.69 '< allowable comp. Stress of concrete for M20 grade: 500 t/m2'
Min. stress (tension) = -53.15 '< allowable tensile. Stress of concrete for M20 grade: 53 t/m2'
Section is cracked sectio as per provisions of IRC 21-2000 (WITH WIND LOAD)
Data
Grade of concrete : M 20
Stress in concrete := 70 kg/cm k = 0.259
Stress in steel = 2000 kg/cm j = 0.914
modular ratio = 10 R = 8.290
Effective depth :
Eff. Depth required = 39.261 x 105 = 68.82 cm
8.290 x 100
using 20 f bars and clear cover of 75 mm
effective depth = 1.665 m
Reinforcement requirement:
Area of steel req 39.261 x 105 = 12.91 Cm
2000 x 0.914 x 166.50
Provide 20 f bars at 100 mm c/c Ast = 31.43 Cm
Min steel = 0.12 / 100 x 100 x 175 = 21.00 Cm
Minimum on each face = 21.00 / 2 = 10.50 Cm
Provide dist steel 16 f bars at 190 mm Ast = 10.59 Cm
Hence O.K.
Check for shear
One way shear: = 11.661 t
Percent of steel Pt = 100 x 31.43 /( 100 x 166.50 ) = 0.189 %
for Pt 0.189 % allowable shear stress in concrete = 1.86 Kg/cm
Shear strength = 1.86 x 100 x 166.50 /1000 = 30.886 t
Which is more than 11.661 t , design shear and hence safe
DESIGN OF CRACKED SECTION FOR ABUTMENT:
D= 1750 mm
Eccentricity, e= 0.944 m.
Eccentricity, e= 943.894 mm.
Ast Provided = 20 f bars at 100 mm c/c = 3139 mm2
Asc Provided= 16 f bars at 190 mm c/c = 1058 mm2
Eff. Cover, dt= 50 mm.
1.5m e= 0.000
modular ratio, mc= 13 N
m= 13 A
1m.
bottom width=depth 1750 mm.
Effective depth= 1700
B
width,b= 1000 mm. A x
Equatting the sum of internal moments about the centre of tensile steel to the Moment of pull,
8.675
900
7.775 W1
Max. stress (compressio = 105.59 '< allowable comp. Stress of concrete for M20 grade: 500 t/m2'
Min. stress (tension) = -77.08 '>allowable tensile. Stress of concrete for M20 grade: 53 t/m2'"
Section is cracked section as per provisions of IRC 21-2000 (WITHOUT WIND LOAD)
Data
Grade of concrete : M 20
Stress in concrete := 66.7 kg/cm k = 0.318
Stress in steel = 2000 kg/cm j = 0.894
modular ratio = 13.993 R = 9.486
Effective depth :
Eff. Depth required = 20.131 x 105 = 46.068 cm
9.486 x 100
using 16 f bars and clear cover of 75 mm
effective depth = 1.067 m
Reinforcement requirement:
Area of steel req 20.131 x 105 = 10.55 Cm
2000 0.894 106.70
Provide 20 f bars 240 mm c/c Ast = 13.10 Cm
Min steel = 0.12 / 100 x 100 x 106.70 = 12.80 Cm
Provide dist steel 12 f bars at 180 mm c/c Ast = 6.29 Cm
Effective depth :
Eff. Depth required = 6.243 x 105 = 25.654 cm
9.486 x 100
Reinforcement requirement:
Area of steel req 6.243 x 105 = 6.75 Cm
2000 0.894 51.70
Provide 16 f bars at 220 mm c/c Ast = 9.14 Cm
Min steel = 0.12 / 100 x 100 x 51.70 = 6.20 Cm
Provide dist steel 12 f bars at 240 mm c/c Ast = 4.71 Cm
1.5m e= 0.00
modular ratio, mc= 13 N
m= 13 A
1m.
bottom width=depth 1400 mm.
Effective depth= 1350
B
width,b= 1000 mm. A x
37.550
x = 2297.75492 = 5.14 m
446.78
35.843
t/m
t/m
t/m
t/m
t/m
t/m
t/m2
t/m2
t/m2
t/m2
t/m2
t/m2
Design of Raft:
Using 32 bars:
Effective depth available = 75 - 7.5 - 1.6 = 65.9
58.79568 < 65.9 cm
O.K.
Ast Required = 25.65 x 10^5 = 23.01244 cm2
(at bottom of abutment) 1900 x 0.8901961 x 65.9
Providing 25 @ 150 = 32.70833
+ 0 @ 190 = 0
32.70833 > 23.01244
Hence OK
Ast Required = 35.48 x 10^5 = 31.831633 cm2
(at bottom of pier) 1900 x 0.8901961 x 65.9
Providing 25 @ 150 = 32.70833
32.70833 > 31.831633
Hence OK
Ast Required at centre = 16.3 x 10^5 = 14.62389 cm2
(at top) 1900 x 0.8901961 x 65.9
Providing 0 @ 400 = 0 cm2
+ 16 @ 120 = 16.74667 cm2 = 16.746667 cm2
16.74667 > 14.62389
Hence OK
Min. Reinforcement:
0.12 x 75 x 100 = 9.00 cm2
100
Providing 16 @ 180 = 11.16444 cm2
11.16444 > 9.00
Hence OK
23.81 t
15.005
0.60
Dirt 5.930
Wall
Bed block
5.810 0.500
5.430
5.510 Flywing
Abutment
height width
6.530 3.50 m 0.36 t/m
0.10 m
1.10 m
6.430 3.50 m
1.00
5.430 3.50 m 1.02 t/m
Design constants:
Grade of concrete = M 20
Stress in concrete := 70 kg/cm k = 0.259
Stress in steel = 2000 kg/cm j = 0.914
modular ratio = 10 R = 8.290
DESIGN OF ABUTMENT
VR
+ 6.605
+ 6.530 W9 W6
+ 6.455
+ 5.810 W7
+ 5.510 W1
FSL 6.400
W8 W4
Density of soil : 2.10 t/m3 -222790
Density of concrete : 2.20 t/m3
Density of Rcc : 2.40 t/m3 W10 W5 W3 W2
Live load surcharge : 1.20 m 1000
400 1200 500 600 400
228.600 A
1) REACTION ON ABUTMENT;
Dead load : Length of abutment = = 8.50 m
As calculated in pier design = 154.78 t
Load on abutment = 154.780 / 2 = 77.39 t
Load coming on to abutment per m length = 77.39 / 8.5 = 9.105 t/ m
Live load :
Live load maximum = 67.260 t
Impact factor = 4.5 = 4.5 = 0.310
6+L 6+ 8.50
As the impact factor reduces to zero at 3.00 m below bed block and 0.5 times the
factor at bottom of bed block, the above factor comes down to
= 0.310 x 226.09 = 11.694 on top of concrete
2 3.00
Live load including impact per m length = 67.260 x 12.694 = 100.449 t/m
8.50
Total load coming on abutment = 9.105 + 100.449 = 109.554 t/m
7.505
900
6.605 W1
MAX. STRESS =
3260.81 x {1 + 6 x 471.051 } = ### t/m
1.70 1.700 ( Compression )
MIN STRESS = 3260.81 x {1 - 6 x 471.051 } = ### t/m
1.70 1.700 ( Tension )
STRESS ON SOIL: ( Taking moments about 'B' )
STRSS TABLE