ACTIVITY ID DESCRIPTION PLAN
START
GENERAL MILESTONES
Letter of Intent
Contract Signature
Start of Installation
End of Installation
Testing & Commissioning
END OF PROJECT
ENGINEERING
Preparation & Submittal Structural & Concept Drawings
Approval Of Structural Drawings
Preparation & Submittal of Shop Drawings
Revision & Comments on Shop Drawings
Revision of Shop Drawings
Approval on Shop Drawings
Preparation of Material List
Site Measurements / Dimensions confirmation
Preparation of Glass Cutting List
Preparation of Fabrication Drawings
MATERIAL SUBMITTALS
Preparation & Submittal of Aluminum Material Sample
Approval on Aluminum
Preparation & Submittal of Glass Sample
Approval on Glass
Preparation & Submittal of Miscellaneous Items
Approval on Misc. Items
PROCUREMENT
Order, Process & Delivery of Aluminum Material
Order, Process & Delivery of Glass
Order, Process & Delivery of Steel
Order, Process & Delivery of Misc. Items
FABRICATION
Fabrication of Brackets
Fabrication of Panels
INSTALLATION
Site Readiness
Installation of First Fix
Installation of Aluminum Panels
Installation of Glass
Finishing & Snagging
TESTING & COMMISIONING
Testing & Commisioning
Handing Over
End of Project
PLAN PLAN ACTUAL ACTUAL PERCENT
End DURATION START DURATION COMPLETE