Company No: 149171-H
PEMBINAAN JEMERLANG SDN BHD
`
PJ/P04-14/TMSB-IISB
CONSTRUCTION AND COMPLETION OF FLYOVER LINKING PERSIARAN TEKNOLOGI SUBANG TO FEDERAL
HIGHWAY FOR “DEVELOPMENT BY TROPICANA METROPARK SDN BHD (FORMERLY KNOWN AS TROPICANA
SUBANG DEVELOPMENT SDN BHD) ON LOT PT 19 TO PT 28, PEKAN COUNTRY HEIGHT, DAERAH PETALING,
SELANGOR DARUL EHSAN” AND “DEVELOPMENT BY IMPIANA IMPRESIF SDN BHD ON LOT 20922, PEKAN
COUNTRY HEIGHT, DAERAH PETALING, SELANGOR DARUL EHSAN
METHOD STATEMENT
FOR
UNDERPASS CONSTRUCTION
Project : The Construction and Completion of Flyover Linking Persiaran Teknologi Subang and Federal Highway for
Development by Metropark Sdn Bhd and Impiana Impresif Sdn Bhd
Reference No: PJ/P04-14/TMSB-IISB/018.0 Revision: 0 Revised Date: 25/01/2017
COMPANY ACTIVITY DESIGNATION NAME SIGNATURE DATE
Pembinaan Prepared By Site Engineer Haslina
Jemerlang Amiruddin
Sdn. Bhd.
Checked By QAQC/ Planning Norzamni
Engineer Hazamudin
Reviewed By Project Director Tan Tuan Yang
J.K. Bersatu Approved By
Sdn. Bhd.
METHOD STATEMENT
Title :Underpass Construction Works
Ref : PJ/P04-14/TMSB-IISB/18.0
Revision No : 0 Revision Date : 25/01/2017 Page : 2 of 9
WORK METHOD STATEMENT PROPOSAL REVIEW SUMMARY
(To be reviewed and approved by the person(s) responsible for the work)
Type of work: Refer to title above
Contract Document No : Specification Section 11 and 13 Doc Ref.: PJ/P04-14/TMSB-IISB
Contract / Project Name: Date : 23/11/2015
NSC Contractor (if any):
Does Not Remarks
List Of Compliance Requirements Comply
Comply (reference docs – e.g. specs, drgs, etc)
Drawing No. PJ/04/14/R8/1-11 Ramp 8 √ Specification 13.0,Bridge Bearing
Proposed inspection / hold & witness pts : Acceptable / Not Acceptable (please circle and / or delete one)
Proposed inspection checklist(s) : Acceptable / Not Acceptable (please circle and / or delete one)
For non-complying items, state justifications for acceptance, if applicable (including cost implication):
Submitted By Reviewed and Approved By
Main Contractor Consultant
Signature
(Name & Date)
Company
Status
Denote:
A = Proceed in accordance with the submission
B = Subject to consultant’s comments
C = Re-submission
METHOD STATEMENT
Title :Underpass Construction Works
Ref : PJ/P04-14/TMSB-IISB/18.0
Revision No : 0 Revision Date : 25/01/2017 Page : 3 of 9
TABLE OF CONTENTS
ITEM DESCRIPTION QTY
1 page
1 ENDORSEMENT (with signatures)
(cover page)
1 page
2 PROPOSAL REVIEW SUMMARY
(previous page)
1 page
3 TABLE OF CONTENTS
(this page)
1 page
4 AMENDMENT RECORD & DISTRIBUTION LIST
(next page)
5 METHOD STATEMENT 6 pages
METHOD STATEMENT
Title :Underpass Construction Works
Ref : PJ/P04-14/TMSB-IISB/18.0
Revision No : 0 Revision Date : 25/01/2017 Page : 4 of 9
AMENDMENT RECORD
Revision Section Revision Details Rev. Date
0 All First Issue 6/11//2015
DISTRIBUTION LIST – Controlled Copies
No Company Department Designation Name
Master Main Contractor
1 Client
2 Consultant
3 Nominated Subcontractor
Note:
a) Any copy of this Method Statement is valid for reference for construction works only after it has been:
i. completely signed off by both parties,
ii. stamped “CONTROLLED COPY” in RED
iii. assigned a controlled copy number (in RED)
b) Upon receipt of the latest controlled-copy, please ensure that the previous controlled copy is stamped / marked “SUPERSEDED”
or “OBSOLETE” immediately on all pages (including its attachments).
c) Photocopies of a Controlled Copy (apart from forms and checklists) should not be made. Only recipients of Controlled Copies
listed above will be notified of any revisions. If additional controlled-copies are required, please request to Main Contractor’s’ QA
Dept.
d) In order to facilitate the task of Quality Control at the project site, the forms and checklists attached with the latest revision of this
Method Statement can be freely copied and used. Outdated / superseded forms and checklists must not be used.
e) If there are any errors, outdated or incorrect information, missing or illegible pages, and/or any other concerns about this Method
Statement and/or its attachments; or if a complete replacement set is required, please inform to Main Contractor’s QA Dept.
METHOD STATEMENT
Title :Underpass Construction Works
Ref : PJ/P04-14/TMSB-IISB/18.0
Revision No : 0 Revision Date : 25/01/2017 Page : 5 of 9
1.0 GENERAL
The underpass excavation and construction will be execute and prepare for the installation sheet pile. The sheet pile will
be installed to support the earth while the excavation for underpass in progress. This method statement will cover the
process of the work, health and safety consideration when carrying out the work and quality control needed to prevent
the recurrence and making good.
2.0 SCOPE OF WORKS
The scope of work will be:
a) Underpass excavation in claystone using excavator, which is 150.0 meters length include 87.718 meters length for
closed underpass, 42.282 meters length for open underpass and 20.0 meters length for U shaped. For width is 9.0
meters and 7.0 meters height.
b) Construction of Reinforced concrete and Head walls, including the slope stabilization works which consist of
Retaining Wall construction at existing embankment and concrete ditch.
c) Installation of necessary ground support to the tunnel excavation, which consists of reinforced steel bars, shotcrete
and concrete floor lining.
d) Associated ventilation and lighting work.
3.0 REFERENCES
a) Construction Drawings / Approved Shop Drawings.
b) Contract Document
4.0 KEY MILESTONES
No Description Commencement Date Completion Date
1 Underpass ( Program) 19/12/16 27/11/17
5.0 RESOURCES PLANNING
5.1 Material
Item Description Material Submission (Status)
1 Box Tunnel Approved and fabricated
2 Retaining Wall Approved and fabricated
5.2 Machinery / Tools / Equipment
Item Description
1 Excavator
2 Compactor
METHOD STATEMENT
Title :Underpass Construction Works
Ref : PJ/P04-14/TMSB-IISB/18.0
Revision No : 0 Revision Date : 25/01/2017 Page : 6 of 9
3 Lorry
4 Generator
5 Sheet pile
5.3 Manpower
Item Description Quantity (person)
1 Site Agent 1
2 Site Supervisor 1
3 Operator 1
4 General works 4
6.0 HANDLING AND STORAGE
All material should be handle with care and the workers are equipped with personal protective equipment (PPE).
The pre-packed material shall be stored on a dry area, off the ground to prevent contact with ground and dampness,
Any torn of pre-packed bag and/or hardened/expired of material upon arrival at the site shall be rejected and
immediately remove from site.
Consignments of material should be arranged in a way that it is used in the order of delivery (First In First Out – FIFO).
7.0 SUBMISSION AND APPROVAL
The relevant samples, certificates and records pertaining to the material used if any shall be submit to Resident Engineer
for approval.
METHOD STATEMENT
Title :Underpass Construction Works
Ref : PJ/P04-14/TMSB-IISB/18.0
Revision No : 0 Revision Date : 25/01/2017 Page : 7 of 9
8.0 WORK METHODOLOGY
8.1 INTRODUCTION
The underpass work is schedule to be on 19th December 2016 and have to carry out at day and monitoring with supervisor.
The underpass construction cover from CH 250 to CH 400 at Ramp 8, include 87.718m is vehicular box culvert, 42.282m
is open box culvert and 20.0m is U shaped Retaining Wall. Underpass are crossing over Ramp 2 and joint with Federal
Highway. Layout plan for underpass construction, Ramp 8 as shown in the Fig 8.1.0.
Fig 8.1.0 Location of Underpass Works at Ramp 8.
METHOD STATEMENT
Title :Underpass Construction Works
Ref : PJ/P04-14/TMSB-IISB/18.0
Revision No : 0 Revision Date : 25/01/2017 Page : 8 of 9
Install Sheet Pile
Fig 8.1.1 Close up view of Underpass Works at Ramp 8.
8.2 SITE PREPARATION
Prior to construction, contractors will prepare work sites to accept workers, equipment and materials. This will include
clearing, grubbing, and grading, followed by mobilization of initial equipment and materials.
Starting the excavation and construction works, the necessary plants, equipment, materials and supplies needed to start
the works will be at the site. The necessary temporary facilities will be on site, as close to the work area as possible.
8.3 SURVEY AND SETTING OUT
The Underpass location, centreline and alignment, gradient, and elevation will be establish by survey, starting from the base
slab, in accordance with the design as indicated in the layout plan and typical cross sections of the reference drawings.
8.4 PROCEDURE FOR CONSTRUCTION
1) The affected area shall be dry, clean and free from all grease. Crack area will be hack using mechanical hackers.
2) All loose material along the crack should be remove with suitable hand tools such as wire brush.
3) Drill holes 10 x 50mm c/c 150mm distant at 30-degree angle on left and right along the entire crack line. Install the
mechanical packer into the holes and tighten securely.
4) Sealing up surface of crack by applying a coat of epoxy putty, Sikadur 31. The sealing compound shall be dry before
carried out the epoxy injection.
5) Mix the epoxy injection accordance to manufacturer’s specification. Inject into mechanical packers from one direction
toward another.
6) Ensure all air released from the gap and seal all packers tightly upon completion for injection process.
7) Allow 24 hours for curing before dismantling.
8) Remove all packers and clean all debris at sites. Touch up uneven surface and make good to original surface.
METHOD STATEMENT
Title :Underpass Construction Works
Ref : PJ/P04-14/TMSB-IISB/18.0
Revision No : 0 Revision Date : 25/01/2017 Page : 9 of 9
Note: The process of works refer to Method Statements with reference number PJ/P04-14/TMSB-IISB/MS/001
9.0 HANDOVER, PROTECTION & PRESERVATION OF WORK-IN-PROGRESS (WIP)
The Contractor shall be responsible to manage and take measures to protect and preserve their work in progress as well
as work handover as per requirements.
10.0 INSPECTION AND TEST PLAN
The Client Representative shall be inform via RIN before proceeding with the work. The work shall not proceed without
approval from Client Representative. Contractor shall first inspect the work completed by worker to its satisfactory prior
request joint inspection from Client Representative.
Checklists shall be implemented during inspection activities as per Appendix A – Check list.
11.0 HEALTH, SAFETY, SECURITY AND ENVIRONMENT
All Risk assessment shall be carried out to identify hazards associated with the excavation and construction process,
assess such hazards and take reasonably practicable steps to eliminate or control the risks arising from those hazards.
Basic personal protective equipment (PPE) be provided to the workers involved.
Proper housekeeping shall be maintained throughout the whole operation.
12.0 RECORDS
12.1 Request For Inspection (RIN)
13.0 LIST OF ATTACHMENT
Appendix A – Organization chart
Appendix B – 1. Check List
2. Safety Certificates
Appendix C – Layout Plan
Appendix D – HIRARC