Project Gantt Chart Overview

The document outlines a process and plant design project with 13 main tasks and 47 subtasks. The project schedule runs from January 18th, 2018 to April 27th, 2018. Key milestones include preliminary process synthesis and heuristics from February 9th to March 9th, and simulation and manual calculation from March 5th to April 2nd. The project involves gathering data, meetings, drafting reports, designing plant components, and Aspen HYSYS simulation. Progress will be tracked through submissions on January 27th, March 2nd, April 13th, and other dates.

Uploaded by

Alvin Ting
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views4 pages

Project Gantt Chart Overview

The document outlines a process and plant design project with 13 main tasks and 47 subtasks. The project schedule runs from January 18th, 2018 to April 27th, 2018. Key milestones include preliminary process synthesis and heuristics from February 9th to March 9th, and simulation and manual calculation from March 5th to April 2nd. The project involves gathering data, meetings, drafting reports, designing plant components, and Aspen HYSYS simulation. Progress will be tracked through submissions on January 27th, March 2nd, April 13th, and other dates.

Uploaded by

Alvin Ting
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ID Task Name Start Finish Duration Resource Names ID % Work 21 Jan '18 28 Jan '18 4 Feb '18 11 Feb

Resource Names ID % Work 21 Jan '18 28 Jan '18 4 Feb '18 11 Feb '18 18 Feb '18
Complete 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Process & Plant Design I 18/1/2018 27/4/2018 74 days 1 2%
2 Project Schedule and Milestones 18/1/2018 13/4/2018 64 days 2 5%
3 Gather Data & Assignments Familiarization 18/1/2018 21/1/2018 3 days All 3 100% All
4 First Meeting 22/1/2018 22/1/2018 1 day All 4 100% All
5 Construction of Preliminary Chart 23/1/2018 23/1/2018 1 day Teck Ming 5 100% Teck Ming
6 Draft Amendments 24/1/2018 26/1/2018 3 days All 6 100% All
7 First Submission 27/1/2018 27/1/2018 1 day All 7 0% 27/1
8 Adjustment of Preliminary Chart 28/1/2018 28/2/2018 25 days Teck Ming 8 0%
9 Construction of Progress Report 1 28/1/2018 28/2/2018 25 days Ming Shern,Jia Shinn 9 0%
10 Submission of Gantt Chart & Progress Report 1 2/3/2018 2/3/2018 1 day All 10 0%
11 Adjustment of Gantt Chart 3/3/2018 12/4/2018 30 days Teck Ming 11 0%
12 Construction of Progress Report 2 3/3/2018 12/4/2018 30 days Christopher,Alvin 12 0%
13 Submission of Gantt Chart & Progress Report 2 13/4/2018 13/4/2018 1 day All 13 0%
14 Feasibility Study/Location 27/1/2018 9/2/2018 12 days 14 0%
15 Gather Data & Assignments Familiarization 27/1/2018 28/1/2018 2 days All 15 0% All
16 First Meeting 29/1/2018 29/1/2018 1 day All 16 0% All
17 Draft Construction 29/1/2018 3/2/2018 6 days 17 0%
18 Process Analysis & Background Research 29/1/2018 2/2/2018 5 days Teck Ming 18 0% Teck Ming
19 Identify Process Pathway 29/1/2018 2/2/2018 5 days Alvin 19 0% Alvin
20 Selection of Plant Capacity & Location 29/1/2018 2/2/2018 5 days Christopher,Jia Shinn 20 0% Christopher,Jia Shinn
21 Process Safety Analysis 29/1/2018 2/2/2018 5 days Ming Shern 21 0% Ming Shern
22 Compilation of First Draft 3/2/2018 3/2/2018 1 day Teck Ming 22 0% Teck Ming
23 Adjustment of the Draft 4/2/2018 8/2/2018 5 days All 23 0% All
24 Final Submission 9/2/2018 9/2/2018 1 day All 24 0% 9/2
25 Preliminary Process Synthesis & Heuristics 9/2/2018 9/3/2018 21 days 25 0%
26 First Meeting (BFD Discussion) 9/2/2018 9/2/2018 1 day All 26 0% All
27 Construction of BFD Draft 10/2/2018 12/2/2018 2 days Teck Ming,Ming Shern 27 0% Teck Ming,Ming Shern
28 Second Meeting (Task Allocation) 13/2/2018 13/2/2018 1 day All 28 0% All
29 Plant Designation 14/2/2018 22/2/2018 7 days 29 0%
30 Reactor Design 14/2/2018 22/2/2018 7 days Alvin,Christopher,Jia Shinn 30 0%
31 Separator Design 14/2/2018 22/2/2018 7 days Ming Shern,Teck Ming 31 0%
32 Third Meeting 23/2/2018 23/2/2018 1 day All 32 0%
33 Addition of Pumps and Other Equipments 24/2/2018 1/3/2018 5 days All 33 0%
34 Draft Submission 2/3/2018 2/3/2018 1 day All 34 0%
35 Amendments of Draft 5/3/2018 6/3/2018 2 days Jia Shinn,Christopher 35 0%
36 Compilation of Plant Diagrams 6/3/2018 7/3/2018 2 days Ming Shern 36 0%
37 Amendments of Final Draft 8/3/2018 8/3/2018 1 day Alvin,Teck Ming 37 0%
38 Final Submission 9/3/2018 9/3/2018 1 day All 38 0%
39 Simulation and Manual Calculation on Material & Energy Balances 5/3/2018 2/4/2018 21 days 39 0%
40 First Meeting 5/3/2018 5/3/2018 1 day All 40 0%
41 Aspen HYSYS Simulation 6/3/2018 16/3/2018 9 days All 41 0%
42 Identification of Problems and Data Analysis 17/3/2018 18/3/2018 2 days All 42 0%
43 Second Meeting (Task Allocation) 19/3/2018 19/3/2018 1 day All 43 0%
44 Manual Calculation on Material & Energy Balances 20/3/2018 26/3/2018 5 days 44 0%
45 Reactor Calculation 20/3/2018 26/3/2018 5 days Alvin 45 0%
46 Flash Drum Calculation 20/3/2018 26/3/2018 5 days Christopher 46 0%
47 Separator Calculation 20/3/2018 26/3/2018 5 days Teck Ming 47 0%
48 Heat Exchanger Calculation 20/3/2018 26/3/2018 5 days Jia Shinn 48 0%
49 Absorber Calculation 20/3/2018 26/3/2018 5 days Ming Shern 49 0%
50 Third Meeting (Problem Identification) 27/3/2018 27/3/2018 1 day All 50 0%
51 Amendments on Calculations Draft 28/3/2018 29/3/2018 2 days Ming Shern,Teck Ming,Alvin 51 0%
52 Compilation of Project Data 30/3/2018 30/3/2018 1 day Teck Ming 52 0%
53 Final Checking 1/4/2018 1/4/2018 1 day Jia Shinn,Christopher 53 0%
54 Final Submission 2/4/2018 2/4/2018 1 day All 54 0%
55 Process Flow Diagram (PFD) 3/4/2018 13/4/2018 9 days 55 0%
56 First Meeting (Task Allocation) 3/4/2018 4/4/2018 2 days All 56 0%
57 Adjustment of Previous Work 5/4/2018 5/4/2018 1 day All 57 0%
58 Construction of Process Flow Diagram 6/4/2018 6/4/2018 1 day Ming Shern,Teck Ming 58 0%
59 Preparation of Stream Table 6/4/2018 6/4/2018 1 day Jia Shinn,Christopher,Alvin 59 0%
60 Third Meeting (Problem Identification) 8/4/2018 8/4/2018 1 day All 60 0%

Task Summary Duration-only Start-only External Milestone Manual Progress Sub-Task


Project: Gantt
Split Project Summary Manual Summary Rollup Finish-only Deadline Project Milestone
Date: 24/1/2018
Milestone Manual Task Manual Summary External Tasks Progress Main Task

Page 1
ID Task Name Start Finish Duration Resource Names ID % Work 21 Jan '18 28 Jan '18 4 Feb '18 11 Feb '18 18 Feb '18
Complete 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
61 Compilation of Project Data 9/4/2018 10/4/2018 2 days Teck Ming 61 0%
62 Final Checking 11/4/2018 12/4/2018 2 days All 62 0%
63 Final Submission 13/4/2018 13/4/2018 1 day All 63 0%
64 Completion of Project I 14/4/2018 27/4/2018 11 days 64 0%
65 Compilation of Assignments 14/4/2018 20/4/2018 6 days Teck Ming 65 0%
66 Final Checking 21/4/2018 26/4/2018 5 days All 66 0%
67 Final Submission 27/4/2018 27/4/2018 1 day All 67 0%

Task Summary Duration-only Start-only External Milestone Manual Progress Sub-Task


Project: Gantt
Split Project Summary Manual Summary Rollup Finish-only Deadline Project Milestone
Date: 24/1/2018
Milestone Manual Task Manual Summary External Tasks Progress Main Task

Page 2
18 Feb '18 25 Feb '18 4 Mar '18 11 Mar '18 18 Mar '18 25 Mar '18 1 Apr '18 8 Apr '18 15 Apr '18 22 Apr '18 29 Apr '18
18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

Teck Ming
Ming Shern,Jia Shinn
2/3
Teck Ming
Christopher,Alvin
13/4

k Ming,Ming Shern

Alvin,Christopher,Jia Shinn
Ming Shern,Teck Ming
All
All
All
Jia Shinn,Christopher
Ming Shern
Alvin,Teck Ming
9/3

All
All
All
All

Alvin
Christopher
Teck Ming
Jia Shinn
Ming Shern
All
Ming Shern,Teck Ming,Alvin
Teck Ming
Jia Shinn,Christopher
2/4

All
All
Ming Shern,Teck Ming
Jia Shinn,Christopher,Alvin
All

Task Summary Duration-only Start-only External Milestone Manual Progress Sub-Task


Project: Gantt
Split Project Summary Manual Summary Rollup Finish-only Deadline Project Milestone
Date: 24/1/2018
Milestone Manual Task Manual Summary External Tasks Progress Main Task

Page 3
18 Feb '18 25 Feb '18 4 Mar '18 11 Mar '18 18 Mar '18 25 Mar '18 1 Apr '18 8 Apr '18 15 Apr '18 22 Apr '18 29 Apr '18
18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
Teck Ming
All
13/4

Teck Ming
All
27/4

Task Summary Duration-only Start-only External Milestone Manual Progress Sub-Task


Project: Gantt
Split Project Summary Manual Summary Rollup Finish-only Deadline Project Milestone
Date: 24/1/2018
Milestone Manual Task Manual Summary External Tasks Progress Main Task

Page 4