ETAP
Project: Page: 1
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal
Bus Loading Summary Report
Directly Connected Load Total Bus Load
Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading
Bus load 1 20.000 0 0 9.088 0 0 0 0 0 9.088 100.0 275.2
Bus load 2 20.000 0 0 4.801 0 0 0 0 0 4.801 100.0 141.4
Bus1 13.800 0 0 0 0 0 0 0 0 4.510 99.9 188.7
Bus2 13.800 0 0 0 0 0 0 0 0 4.510 99.9 188.7
Bus3 150.000 0 0 0 0 0 0 0 0 5.412 99.8 20.8
Bus5 20.000 0 0 0 0 0 0 0 0 14.408 100.0 416.6
Coupler 20.000 0 0 0 0 0 0 0 0 9.006 100.0 260.4
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 2
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal
Branch Loading Summary Report
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
ID Type (Amp) Amp % (MVA) MVA % MVA %
Cable1 Cable 309.12 275.19 89.02
Cable2 Cable 309.12 141.44 45.76
Trafo Incoming Transformer 30.000 5.412 18.0 5.403 18.0
Trafo XYZ 1 Transformer 20.000 4.510 22.6 4.503 22.5
Trafo XYZ 2 Transformer 20.000 4.510 22.6 4.503 22.5
* Indicates a branch with operating load exceeding the branch capability.
ETAP
Project: Page: 3
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal
Branch Losses Summary Report
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable1 -9.088 0.000 9.512 0.289 424.7 289.0 95.3 99.8 4.50
Cable2 -4.801 0.000 4.891 0.061 89.8 61.1 98.0 99.8 1.84
Trafo XYZ 1 4.507 0.164 -4.502 -0.063 5.1 101.6 100.0 99.8 0.17
Trafo XYZ 2 4.507 0.164 -4.502 -0.063 5.1 101.6 100.0 99.8 0.17
Trafo Incoming 5.401 0.347 -5.399 -0.225 2.7 122.0 100.0 99.8 0.17
527.3 675.3
ETAP
Project: Page: 4
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal
Alert Summary Report
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Marginal Report
Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type
Bus load 1 Bus Under Voltage 20.000 kV 19.066 95.3 3-Phase
Bus load 2 Bus Under Voltage 20.000 kV 19.598 98.0 3-Phase
ETAP
Project: Page: 5
12.6.0H
Location: Date: 11-28-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: unit6 Config.: Normal
SUMMARY OF TOTAL GENERATION , LOADING & DEMAND
MW Mvar MVA % PF
Source (Swing Buses): 14.416 0.675 14.432 99.89 Lagging
Source (Non-Swing Buses): 0.000 0.000 0.000
Total Demand: 14.416 0.675 14.432 99.89 Lagging
Total Motor Load: 0.000 0.000 0.000
Total Static Load: 13.889 0.000 13.889 100.00 Lagging
Total Constant I Load: 0.000 0.000 0.000
Total Generic Load: 0.000 0.000 0.000
Apparent Losses: 0.527 0.675
System Mismatch: 0.000 0.000
Number of Iterations: 2