Cost Parameter by RC

This document provides a canvass sheet with cost parameters for various project activities including labor rates and unit costs. It lists 51 separate items describing activities like excavation, backfilling, plastering, tile setting, painting, formworks, door installation, window installation and more. For each item it specifies the labor type, manpower capability in units per day, labor rate in PHP, and the resulting unit cost description. The document serves as an estimate of costs for the different project components.

Uploaded by

Roland Cepeda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views44 pages

Cost Parameter by RC

This document provides a canvass sheet with cost parameters for various project activities including labor rates and unit costs. It lists 51 separate items describing activities like excavation, backfilling, plastering, tile setting, painting, formworks, door installation, window installation and more. For each item it specifies the labor type, manpower capability in units per day, labor rate in PHP, and the resulting unit cost description. The document serves as an estimate of costs for the different project components.

Uploaded by

Roland Cepeda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

CANVASS SHEET

Name of Project:
Package B:
Location :

COST PARAMETERS

Item No. Activity LABOR


Manpower Capabilty Unit Cap. Labor Rate ( Php ) Unit Cost Description
1 Excavation Laborer 2.66 cu.m./day 500.00 187.81 Backhoe
(Soft Clay)
(Hard Medium) Laborer 1.19 cu.m./day 500.00 418.75
(Hard Rock) Laborer 0.59 cu.m./day 500.00 843.75
1.48 337.17

2 Backfilling/ Laborer 2.89 cu.m./day 500.00 173.13


Loader & Tamped
Compaction by Vibrator
( by hand) Operator & oil

3 Soil Poisoning Laborer 100.00 sq.m./day 500.00 5.00 Mixture

4 Casting of Mason 8.00 cu.m./day 4,250.00 531.25


Concrete Laborer

5 Plastering Mason 8.00 sq.m/day 550.00 68.75


Laborer 1.00 SQ.M/HR

6 CHB Laying Mason 6.50 sq.m./ day 1,090.00 161.54 CHB


Laborer Cement
Sand

7 Tile Setting Mason 4.00 sq.m./day 550.00 137.50 Tile Adhsv.


Laborer Sand
6" x 6" 1.60 sq.m./day 550.00 Tiles
Grout

8 Rebar Steelman 88.88 kgs/day 550.00 6.19 Rebar


Install Laborer

9 Painting Painter 40.00 sq.m./day 550.00 13.75 Paint set

10 Waterproofing Skilled 10.00 sq.m/day 550.00 55.00 Water proo


Laborer matls
11 Formworks Carpenter 3.27 sq.m./day 550.00 168.20 Plywood
Laborer C lumber
Nails
Shoring
Form Oil

12 Riprapping Mason 2.00 sq.m./day 550.00 275.00 Boulders


Laborer Concrete
Shut

13 Base Prep Mason 20.00 sq.m./day 550.00 27.50 2500 conc


3" thk conc. Laborer Rebars
Forms

14 RCP Inst. Mason 2.00 l.m./day 550.00 275.00 RCP 12"


Including Laborer Cement
Excavation Sand
15 Groove works Mason 5.00 l.m/day 500.00 100.00 Cement

16 Doorjamb Finishing 2.00 sets/day 550.00 275.00 Good


Works Carpenter Lumber
Fabrication # 8"
Nails etc
Doorjamb Finishing 3.00 sets/day 1,050.00 350.00 Accessories
Works Carpenter
Installation Mason
625.00
17 Door Panels Finishing 1.00 set/day 550.00 550.00 Good Lum
Fabrication Carpenter 2x35x7/12
Accessorie

18 Painting Neutralizer
Neutralize Laborer 60.00 sq.m./day 280.00 4.67 Putty
Primer Painter 45.00 sq.m./day 380.00 8.44 Primer
Putty Laborer 45.00 sq.m./day 280.00 6.22 Ist Coat
Sanding Laborer 45.00 sq.m./day 280.00 6.22 2nd Coat
Ist Coat Painter 45.00 sq.m./day 380.00 8.44 Sanding
F coat Painter 45.00 sq.m./day 380.00 8.44
42.44
19 Grooving Mason 6.00 l.m./day 380.00 63.33 Cement
Works Sanding

20 Pebbles Mason 10.00 sq.m./day 550.00 55.00 Pebbles


Stone Laborer Cement
Install

21 Varnishing Painter 4.00 sq.m./day 550.00 137.50 Paper San


Works Laborer Varnish
w/ sanding Wood Puttt

22 Wall Chipping Laborer 7.00 l.m./day 500.00 71.43


Works
23 Restoration Mason 10.00 l.m./day 550.00 55.00 Cement
of chipped Laborer 25.00 l.m./day 500.00 20.00 Sand
walls 75.00
24 Spreading, Laborer 16.72 cu.m./day 500.00 29.90
Tamping,
Grading
25 Erecting Forms Carpenter 14.88 sq.m./day 500.00 33.60
Removing Laborer 14.88 sq.m./day 500.00 33.60
Forms 67.20
26 Staking & Surveyor sq.m./day 39.65
Lay-out

27 Gravel Bedding Loader & Tamped


Hand Placed & Labor,
Tamped by Operator,
Vibratory Roller Oil 4.52 cu.m./day 550.00 121.69 by Vibrator

28 Rough Floor Mason 72.00 sq.m./day 550.00 7.64


Finish Labor

29 Plain Cement Mason 6.02 sq.m./day 500.00 83.13


Finish Labor

30 Vinyl Tiles Labor 4.79 sq.m./day 550.00 114.81


31 Marble Tile Labor 2.80 sq.m./day 500.00 178.75
Mason
Double Wall
32 Partition Labor 3.60 sq.m./day 550.00 570.13
Carpenter 1.20 sq.m./day 500.00

33 Gypsum Board Labor 50.00 sq.m./day 550.00 31.00


Carpenter 25.00 sq.m./day 500.00
34 Installation of Door Labor 2.00 pcs/day 550.00 275.00
Carpenter
Fixed Glass on
35 Steel Frame Carpenter 2.60 sq.m./day 550.00 211.54
Labor

36 Plywood Partitions Carpenter 24.40 sq.m./day 550.00 22.54


Labor
37 1/4" thk plywood Labor 46.78 sq.m./day 550.00 11.76
Carpenter
38 Plywood Ceiling Carpenter 1.12 sq.m./day 550.00 640.31
Labor 3.36 sq.m./day 500.00
Wooden Flush
39 Door Carpenter 0.69 sq.m./day 550.00 1,041.44
Labor 2.07 sq.m./day 500.00
Steel Awning
40 Window Carpenter 1.01 sq.m./day 550.00 711.50
Labor 3.02 sq.m./day 500.00
Steel Casement
41 Window Carpenter 1.26 sq.m./day 550.00 569.06
Labor 3.77 sq.m./day 500.00
Aluminum Sliding
42 Window Carpenter 1.94 sq.m./day 550.00 369.50
Labor 5.80 sq.m./day 500.00
Jalousie Windows
on Aluminum
43 Frame Carpenter 4.62 sq.m./day 550.00 154.56
Labor 14.04 sq.m./day 500.00
Hollow Metal Door
44 Single Swing Carpenter 0.63 sq.m./day 380.00 766.63
Labor 1.67 sq.m./day 280.00
Fixed Glass on
45 Wood Frame Carpenter 4.62 sq.m./day 380.00 102.13
Labor 14.04 sq.m./day 280.00
Hollow Metal Door
46 Double Swing Carpenter 0.63 sq.m./day 380.00 766.63
Labor 1.67 sq.m./day 280.00

47 Steel Sliding Doors Carpenter 0.85 sq.m./day 380.00 559.13


Labor 2.54 sq.m./day 280.00
Aluminum Door
48 Single Swing Carpenter 1.27 sq.m./day 380.00 372.75
Labor 3.81 sq.m./day 280.00
Wooden Panel
49 Door Carpenter 0.69 sq.m./day 380.00 687.88
Labor 2.07 sq.m./day 280.00
Wooden Sliding
50 Door Carpenter 0.92 sq.m./day 380.00 516.05
Labor 2.75 sq.m./day 280.00
Acoustic Tile Out
51 Runner Carpenter 1.42 sq.m./day 380.00 332.88
Labor 4.28 sq.m./day 280.00
Acoustic Tile on
52 Plywood Ceiling Carpenter 0.00 sq.m./day - 47.95
Labor 5.84 sq.m./day 280.00
Wire Mesh
53 Partition Carpenter 1.90 sq.m./day 380.00 248.98
Labor 5.71 sq.m./day 280.00

54 Colored Cement Mason 5.71 sq.m./day 380.00 115.50


Labor sq.m./day 280.00
55 Pebble Washout Mason 2.80 sq.m./day 380.00 235.95
Labor sq.m./day 280.00

56 Granulithic Mason 2.80 sq.m./day 380.00 235.95


Labor sq.m./day 280.00

57 Asphalt Labor 4.79 sq.m./day 560.00 116.90 Asphalt Dis


Trailer Truc
(Mob & Demob)

58 Wall Papers Labor 61.54 sq.m./day 280.00 4.55

Asbestos Cement
59 board Carpenter 13.33 sq.m./day 380.00 34.10
Labor 50.00 sq.m./day 280.00

60 Plywood Panelling Carpenter 13.33 sq.m./day 380.00 34.10


Labor 50.00 sq.m./day 280.00

61 Fiberboard Carpenter 20.00 sq.m./day 380.00 24.60


Labor 50.00 sq.m./day 280.00

Demolition (Adobe
62 Wall) Labor 0.50 cu.m./day 280.00 560.00

63 Cabinets & Doors Carpenter 5.58 sq.m./day 380.00 118.28


Labor 280.00

ARCHITECTURAL SPECIALTIES

Door excluding finishing hardwares :


HC Plywood Flush
1 Type Carpenter 2.57 sq.m./day 550.00 408.88
Labor 500.00

SC Plywood Flush
2 Type Carpenter 2.60 sq.m./day 550.00 403.85
Labor 500.00

3 Steel Sliding Carpenter 0.86 sq.m./day 550.00 1,215.28


Labor 500.00

4 Steel Hinge Carpenter 1.04 sq.m./day 550.00 1,009.62


Labor 500.00
Aluminum Roll-Up
(Manually
5 Operated) Carpenter 1.04 sq.m./day 550.00 1,009.62
Labor 500.00

Cyclone wire
6 Sliding door Carpenter 1.04 sq.m./day 550.00 1,009.62
Labor 500.00

Windows :
Fixed glass on
1 steel frame Carpenter 2.60 sq.m./day 550.00 403.85
Labor 500.00

2 Fixed G.I. louver Carpenter 1.74 sq.m./day 550.00 604.84


Labor 500.00

Fixed asbestos
3 louver Carpenter 1.74 sq.m./day 550.00 604.84
Labor 500.00

4 Metal louver Carpenter 2.60 sq.m./day 550.00 403.85


Labor 500.00

Partition (including framework) :

1/2" thk Single Wall


1 Plywood Carpenter 3.23 sq.m./day 550.00 324.88
Labor 500.00

1/4" thk Double


2 Wall Plywood Carpenter 2.37 sq.m./day 550.00 443.41
Labor 500.00

3 Wooden Louver Carpenter 2.37 sq.m./day 550.00 443.41


Labor 500.00

Cyclone Wire 6a #
4 10 Partition Carpenter 31.51 sq.m./day 550.00 33.32
Labor 500.00

Concrete foundation and elevated concrete unit man hours

grade member :

1 Formwork Carpenter 3.15 sq.m./day 380.00 209.55


Labor 280.00
2 Concreting Labor 0.94 sq.m./day 280.00 298.90

3 Rebars Work Steelman 112.68 kg/day 380.00 5.86


Labor 280.00

4 Finishing Labor 20.00 sq.m./day 280.00 14.00

suspended member :

1 Formwork Carpenter 2.44 sq.m./day 380.00 270.60


Labor 280.00

2 Concreting Labor 0.48 sq.m./day 280.00 584.50

3 Rebars Work Steelman 100.00 kg/day 380.00 6.60


Labor 280.00

4 Finishing Labor 10.00 sq.m./day 280.00 28.00

roofing and siding :

1 Metal Roofing Carpenter 8.26 sq.m./day 380.00 45.98


Labor 280.00

Non-Metal
2 Roofings Carpenter 7.44 sq.m./day 380.00 51.08
Labor 280.00

3 Metal Sidings Carpenter 6.35 sq.m./day 380.00 59.82


Labor 280.00

4 Non-Metal Sidings Carpenter 5.59 sq.m./day 380.00 67.95


Labor 280.00

FORMWORKS

Continous Wall
1 Type (CHB) Carpenter 11.43 sq.m./day 380.00 47.25
Labor 20.00 sq.m./day 280.00

Foundation on Pile
2 Caps Carpenter 5.33 sq.m./day 380.00 94.00
Labor 12.31 sq.m./day 280.00

Grade beam or
3 FTB Carpenter 10.67 sq.m./day 380.00 49.63
Labor 20.00 sq.m./day 280.00
Walls Ground to 8'
4 high Carpenter 7.27 sq.m./day 380.00 77.45
Labor 11.11 sq.m./day 280.00

5 Walls 8' to 16' high Carpenter 6.61 sq.m./day 380.00 84.78


Labor 10.26 sq.m./day 280.00 82.76

Walls 16' to 20'


6 high Carpenter 5.93 sq.m./day 380.00 95.63
Labor 8.89 sq.m./day 280.00

7 Columns Carpenter 6.56 sq.m./day 380.00 85.95


Labor 10.00 sq.m./day 280.00

8 Beams & Girders Carpenter 4.21 sq.m./day 380.00 132.95


Labor 6.56 sq.m./day 280.00

Elevated Slabs
9 (Word Shores) Carpenter 6.96 sq.m./day 380.00 95.23
Labor 6.90 sq.m./day 280.00

Elevated Slabs
10 (Adjusted Shores) Carpenter 11.43 sq.m./day 380.00 64.75
Labor 8.89 sq.m./day 280.00

DEMOLITION

With
Pneumati
1 By hand w/ sledge Laborer 2.47 sq.m./day 280.00 113.40 c Breaker

ELEVATED SLABS

With
Pneumati
1 By hand w/ sledge Laborer 0.49 cu.m./day 280.00 568.40 c Breaker

CONCRETE WALLS

With
Pneumati
1 By hand w/ sledge Laborer 0.56 cu.m./day 280.00 504.35 c Breaker

REMOVE CONCRETE CURBS


With
Pneumati
1 By hand w/ sledge Laborer 5.41 lm/day 280.00 51.80 c Breaker

CUT CONCRETE OPENINGS

With
Pneumati
1 By hand w/ sledge Laborer 0.44 cu.m./day 280.00 641.90 c Breaker

UNIT MAN HOURS ITEM OF WORK

Common
Excavation
1 (Manual) Laborer 1.33 cu.m./day 280.00 210.00

Common
Excavation
2 (Machine) Spotter 16.00 cu.m./day 280.00 17.50

Hook Excavation
(Manual &
3 Machine) Labor 1.00 cu.m./day 280.00 280.00

Structural Backfill
4 (Manual) Labor 1.60 cu.m./day 280.00 175.00

Structural Backfill
5 (Backfill) Labor 4.00 cu.m./day 280.00 70.00

6 Hauling Spoils Labor 8.00 cu.m./day 280.00 35.00

7 Trenching by Hand Labor 1.33 cu.m./day 280.00 210.00

Trenching by
8 Machine Labor 40.00 cu.m./day 280.00 7.00

RC PIPES INSTALLATION

1 100mmø = 4" Mason 7.95 lm/day 660.00 82.99


d=1m Labor

2 150mmø = 6" Mason 7.93 lm/day 660.00 83.19


d=1m Labor

3 200mmø = 8" Mason 7.91 lm/day 660.00 83.39


d=1m Labor
4 250mmø = 10" Mason 7.90 lm/day 660.00 83.59
d=1m Labor

5 300mmø = 12" Mason 7.85 lm/day 660.00 84.12


d=1.25m Labor

6 375mmø = 15" Mason 7.81 lm/day 660.00 84.50


d=1.25m Labor

7 450mmø = 18" Mason 7.78 lm/day 660.00 84.88


d=1.25m Labor

8 525mmø = 21" Mason 7.59 lm/day 660.00 86.91


d=2m Labor

9 600mmø = 24" Mason 7.54 lm/day 660.00 87.52


d=2m Labor

10 675mmø = 27" Mason 7.43 lm/day 660.00 88.83


d=2.25m Labor

11 750mmø = 30" Mason 7.37 lm/day 660.00 89.52


Labor

12 825mmø = 33" Mason 7.32 lm/day 660.00 90.20


Labor
MATERIAL/ EQUIPMENT Total Unit Unit Remarks
Capacity Unit Cap. Rental/day( Php) Unit Cost Cost ( Php )
200.00 cu.m./day 9,285.68 46.43 234.24 Php/cu.m. Ex-vat

571.41 Php/cu.m.
Ex-ohp
oader & Tamped "
192.00 cu.m./day 12,857.60 66.97 260.04 Php/cu.m.
19.05 cu.m./day 380.00 19.95

1.00 bag/drum 180.00 1.80 6.80 Php/sq.m. "

9.00 bags 200.00 1,800.00 3,360.25 Php/cu.m. "


0.49 cu.m. 600.00 291.60
0.97 cu.m. 450.00 437.40
1.00 truck/wet 300.00 300.00
2,829.00
0.30 bags/sq.m. 200.00 60.00 182.75 Php/sq.m. "
0.12 cu.m. 450.00 54.00
114.00
13.00 pcs 25.00 156.00 442.54 Php/sq.m. "
0.40 bag 200.00 80.00
0.10 cu.m. 450.00 45.00
281.00
0.30 bags 302.00 90.60 590.43 Php/sq.m. "
0.12 cu.m. 450.00 54.00
25.00 pcs 12.00 300.00
6.00 l.m. 50.00 8.33
452.93
1.00 kg 32.00 38.19 Php/sq.m. "

25.00 sq.m./gal 2,200.00 88.00 101.75 Php/sq.m. "

15.00 sq.m/set 6,500.00 433.33 488.33 Php/sq.m. "


1.00 sq.m. 225.69 225.69 597.09 Php/sq.m. "
6.50 bd ft 12.00 78.00
0.10 kg 32.00 3.20
10.00 bd ft 12.00 120.00
0.20 liter 10.00 2.00
428.89
1.00 cu.m. 300.00 300.00 895.00 Php/sq.m. "

0.10 cu.m. 3,200.00 320.00


620
0.08 cu.m. 2,900.00 217.50 475.00 Php/sq.m. "
2.50 kgs 32.00 80.00
0.50 sq.m. 300.00 150.00
447.50
1.00 pcs 380.00 380.00 765.00 Php/l.m. "
0.05 cu.m. 2,200.00 110.00
490.00
0.02 cu.m. 2,500.00 50.00 150.00 Php/ l.m. "

27.00 bd ft/day 33.00 891.00 1,766.00 Php/Set "

250
Accessories

1,141.00
41.00 bd ft/day 33.00 1,353.00 2,253.00 Php/Set "
2x35x7/12
1.00 set 350.00 350.00
1,703.00
50.00 sq.m./gal 180.00 3.60 106.48 Php/sq.m. "
45.00 sq.m./gal 110.00 2.44
40.00 sq.m./gal 650.00 16.25
35.00 sq.m./gal 650.00 18.57
30.00 sq.m./gal 650.00 21.67
30.00 sq.m./sq ft 45.00 1.50

64.03
0.10 bags 200.00 20.00 105.83 Php/l.m. "
0.05 cu.m. 450.00 22.50
42.50
4.00 sq.m./can 120.00 30.00 185.00 Php/sq.m. "
0.50 bags 200.00 100.00
130.00

3.00 sq. ft 35.00 105.00 355.00 Php/sq.m. "


1.00 liter 85.00 85.00
0.50 kgs 55.00 27.50
217.50
71.43 Php/l.m.. "

0.20 bags 200 40.00 137.50 Php/l.m.. "


0.05 cu.m. 450.00 22.50
62.50
- - Php/cu.m. "
-
-
- 67.20 Php/cu.m. "
-
-
- - Php/cu.m. "
-
-
Loader & Tamped - Php/cu.m. "

192.00 cu.m./day 12,857.60 66.97 188.65 Php/cu.m.

- - Php/cu.m. "
-
-
- - Php/cu.m. "
-
-
0 0 Php/cu.m. "
0 0 Php/cu.m. "
0

0 0 Php/cu.m. "
0 0 Php/cu.m. "

0 0 Php/cu.m. "

0 0 Php/cu.m. "
0 0 Php/cu.m. "
2,400.00 sq.m./day 314,875.90 258.10
2.00 trips 12,000.00 141.20
(Mob & Demob)
67.39 sq.m./day

5.38 cu.m./day

11.65 cu.m./day
22.22 lm/day

1.01 cu.m./day
CANVASS SHEET
Name of Project:
Package B:
Location :

COST PARAMETERS

Item No. Activity LABOR


Manpower Capabilty Unit Cap. Labor Rate ( Php ) Unit Cost Description
1 Excavation Laborer 2.66 cu.m./day 500.00 187.81 Backhoe
(Soft Clay)
(Hard Medium) Laborer 1.19 cu.m./day 500.00 418.75
(Hard Rock) Laborer 0.59 cu.m./day 500.00 843.75
1.48 337.17

2 Backfilling/ Laborer 2.89 cu.m./day 500.00 173.13


Loader & Tamped
Compaction by Vibrator
( by hand) Operator & oil

3 Soil Poisoning Laborer 100.00 sq.m./day 500.00 5.00 Mixture

4 Casting of Mason 8.00 cu.m./day 4,250.00 531.25


Concrete Laborer

5 Plastering Mason 8.00 sq.m/day 20.00 68.75


Laborer 1.00 SQ.M/HR

6 CHB Laying Mason 6.50 sq.m./ day 1,090.00 161.54 CHB


Laborer Cement
Sand

7 Tile Setting Mason 4.00 sq.m./day 550.00 137.50 Tile Adhsv.


Laborer Sand
6" x 6" 1.60 sq.m./day 550.00 Tiles
Grout

8 Rebar Steelman 88.88 kgs/day 550.00 6.19 Rebar


Install Laborer

9 Painting Painter 40.00 sq.m./day 550.00 13.75 Paint set

10 Waterproofing Skilled 10.00 sq.m/day 550.00 55.00 Water proo


Laborer matls

11 Formworks Carpenter 3.27 sq.m./day 550.00 168.20 Plywood


Laborer C lumber
Nails
Shoring
Form Oil

12 Riprapping Mason 2.00 sq.m./day 550.00 275.00 Boulders


Laborer Concrete
Shut

13 Base Prep Mason 20.00 sq.m./day 550.00 27.50 2500 conc


3" thk conc. Laborer Rebars
Forms

14 RCP Inst. Mason 2.00 l.m./day 550.00 275.00 RCP 12"


Including Laborer Cement
Excavation Sand
15 Groove works Mason 5.00 l.m/day 500.00 100.00 Cement

16 Doorjamb Finishing 2.00 sets/day 550.00 275.00 Good


Works Carpenter Lumber
Fabrication # 8"
Nails etc
Doorjamb Finishing 3.00 sets/day 1,050.00 350.00 Accessories
Works Carpenter
Installation Mason
625.00
17 Door Panels Finishing 1.00 set/day 550.00 550.00 Good Lum
Fabrication Carpenter 2x35x7/12
Accessorie

18 Painting Neutralizer
Neutralize Laborer 60.00 sq.m./day 280.00 4.67 Putty
Primer Painter 45.00 sq.m./day 380.00 8.44 Primer
Putty Laborer 45.00 sq.m./day 280.00 6.22 Ist Coat
Sanding Laborer 45.00 sq.m./day 280.00 6.22 2nd Coat
Ist Coat Painter 45.00 sq.m./day 380.00 8.44 Sanding
F coat Painter 45.00 sq.m./day 380.00 8.44
42.44
19 Grooving Mason 6.00 l.m./day 380.00 63.33 Cement
Works Sanding

20 Pebbles Mason 10.00 sq.m./day 550.00 55.00 Pebbles


Stone Laborer Cement
Install

21 Varnishing Painter 4.00 sq.m./day 550.00 137.50 Paper San


Works Laborer Varnish
w/ sanding Wood Puttt

22 Wall Chipping Laborer 7.00 l.m./day 500.00 71.43


Works
23 Restoration Mason 10.00 l.m./day 550.00 55.00 Cement
of chipped Laborer 25.00 l.m./day 500.00 20.00 Sand
walls 75.00
24 Spreading, Laborer 16.72 cu.m./day 500.00 29.90
Tamping,
Grading
25 Erecting Forms Carpenter 14.88 sq.m./day 500.00 33.60
Removing Laborer 14.88 sq.m./day 500.00 33.60
Forms 67.20
26 Staking & Surveyor sq.m./day 39.65
Lay-out

27 Gravel Bedding Loader & Tamped

Hand Placed & Labor,


Tamped by Operator,
Vibratory Roller Oil 4.52 cu.m./day 550.00 121.69 by Vibrator

28 Rough Floor Mason 72.00 sq.m./day 550.00 7.64


Finish Labor

29 Plain Cement Mason 6.02 sq.m./day 500.00 83.13


Finish Labor

30 Vinyl Tiles Labor 4.79 sq.m./day 550.00 114.81


31 Marble Tile Labor 2.80 sq.m./day 500.00 178.75
Mason
Double Wall
32 Partition Labor 3.60 sq.m./day 550.00 570.13
Carpenter 1.20 sq.m./day 500.00

33 Gypsum Board Labor 50.00 sq.m./day 550.00 31.00


Carpenter 25.00 sq.m./day 500.00
Installation of
34 Door Labor 2.00 pcs/day 550.00 275.00
Carpenter

Fixed Glass on
35 Steel Frame Carpenter 2.60 sq.m./day 550.00 211.54
Labor
Plywood
36 Partitions Carpenter 24.40 sq.m./day 550.00 22.54
Labor
1/4" thk
37 plywood Labor 46.78 sq.m./day 550.00 11.76
Carpenter

38 Plywood Ceiling Carpenter 1.12 sq.m./day 550.00 640.31


Labor 3.36 sq.m./day 500.00
Wooden Flush
39 Door Carpenter 0.69 sq.m./day 550.00 1,041.44
Labor 2.07 sq.m./day 500.00
Steel Awning
40 Window Carpenter 1.01 sq.m./day 550.00 711.50
Labor 3.02 sq.m./day 500.00
Steel
Casement
41 Window Carpenter 1.26 sq.m./day 550.00 569.06
Labor 3.77 sq.m./day 500.00

Aluminum
42 Sliding Window Carpenter 1.94 sq.m./day 550.00 369.50
Labor 5.80 sq.m./day 500.00
Jalousie
Windows on
Aluminum
43 Frame Carpenter 4.62 sq.m./day 550.00 154.56
Labor 14.04 sq.m./day 500.00
Hollow Metal
Door Single
44 Swing Carpenter 0.63 sq.m./day 380.00 766.63
Labor 1.67 sq.m./day 280.00

Fixed Glass on
45 Wood Frame Carpenter 4.62 sq.m./day 380.00 102.13
Labor 14.04 sq.m./day 280.00
Hollow Metal
Door Double
46 Swing Carpenter 0.63 sq.m./day 380.00 766.63
Labor 1.67 sq.m./day 280.00
Steel Sliding
47 Doors Carpenter 0.85 sq.m./day 380.00 559.13
Labor 2.54 sq.m./day 280.00

Aluminum Door
48 Single Swing Carpenter 1.27 sq.m./day 380.00 372.75
Labor 3.81 sq.m./day 280.00
Wooden Panel
49 Door Carpenter 0.69 sq.m./day 380.00 687.88
Labor 2.07 sq.m./day 280.00
Wooden Sliding
50 Door Carpenter 0.92 sq.m./day 380.00 516.05
Labor 2.75 sq.m./day 280.00
Acoustic Tile
51 Out Runner Carpenter 1.42 sq.m./day 380.00 332.88
Labor 4.28 sq.m./day 280.00
Acoustic Tile on
Plywood
52 Ceiling Carpenter 0.00 sq.m./day - 47.95
Labor 5.84 sq.m./day 280.00
Wire Mesh
53 Partition Carpenter 1.90 sq.m./day 380.00 248.98
Labor 5.71 sq.m./day 280.00
Colored
54 Cement Mason 5.71 sq.m./day 380.00 115.50
Labor sq.m./day 280.00

Pebble
55 Washout Mason 2.80 sq.m./day 380.00 235.95
Labor sq.m./day 280.00

56 Granulithic Mason 2.80 sq.m./day 380.00 235.95


Labor sq.m./day 280.00

57 Asphalt Labor 4.79 sq.m./day 560.00 116.90 Asphalt Dis


Trailer Truc
(Mob & Demob)

58 Wall Papers Labor 61.54 sq.m./day 280.00 4.55

Asbestos
59 Cement board Carpenter 13.33 sq.m./day 380.00 34.10
Labor 50.00 sq.m./day 280.00

Plywood
60 Panelling Carpenter 13.33 sq.m./day 380.00 34.10
Labor 50.00 sq.m./day 280.00

61 Fiberboard Carpenter 20.00 sq.m./day 380.00 24.60


Labor 50.00 sq.m./day 280.00

Demolition
62 (Adobe Wall) Labor 0.50 cu.m./day 280.00 560.00

Cabinets &
63 Doors Carpenter 5.58 sq.m./day 380.00 118.28
Labor 280.00

ARCHITECTURAL SPECIALTIES

Door excluding finishing hardwares :


HC Plywood
1 Flush Type Carpenter 2.57 sq.m./day 550.00 408.88
Labor 500.00

SC Plywood
2 Flush Type Carpenter 2.60 sq.m./day 550.00 403.85
Labor 500.00

3 Steel Sliding Carpenter 0.86 sq.m./day 550.00 1,215.28


Labor 500.00

4 Steel Hinge Carpenter 1.04 sq.m./day 550.00 1,009.62


Labor 500.00
Aluminum Roll-
Up (Manually
5 Operated) Carpenter 1.04 sq.m./day 550.00 1,009.62
Labor 500.00

Cyclone wire
6 Sliding door Carpenter 1.04 sq.m./day 550.00 1,009.62
Labor 500.00

Windows :
Fixed glass on
1 steel frame Carpenter 2.60 sq.m./day 550.00 403.85
Labor 500.00

Fixed G.I.
2 louver Carpenter 1.74 sq.m./day 550.00 604.84
Labor 500.00

Fixed asbestos
3 louver Carpenter 1.74 sq.m./day 550.00 604.84
Labor 500.00

4 Metal louver Carpenter 2.60 sq.m./day 550.00 403.85


Labor 500.00

Partition (including framework) :

1/2" thk Single


1 Wall Plywood Carpenter 3.23 sq.m./day 550.00 324.88
Labor 500.00

1/4" thk Double


2 Wall Plywood Carpenter 2.37 sq.m./day 550.00 443.41
Labor 500.00

3 Wooden Louver Carpenter 2.37 sq.m./day 550.00 443.41


Labor 500.00

Cyclone Wire
6a # 10
4 Partition Carpenter 31.51 sq.m./day 550.00 33.32
Labor 500.00

Concrete foundation and elevated concrete unit man hours

grade member :

1 Formwork Carpenter 3.15 sq.m./day 380.00 209.55


Labor 280.00
2 Concreting Labor 0.94 sq.m./day 280.00 298.90

3 Rebars Work Steelman 112.68 kg/day 380.00 5.86


Labor 280.00

4 Finishing Labor 20.00 sq.m./day 280.00 14.00

suspended member :

1 Formwork Carpenter 2.44 sq.m./day 380.00 270.60


Labor 280.00

2 Concreting Labor 0.48 sq.m./day 280.00 584.50

3 Rebars Work Steelman 100.00 kg/day 380.00 6.60


Labor 280.00

4 Finishing Labor 10.00 sq.m./day 280.00 28.00

roofing and siding :

1 Metal Roofing Carpenter 8.26 sq.m./day 380.00 45.98


Labor 280.00

Non-Metal
2 Roofings Carpenter 7.44 sq.m./day 380.00 51.08
Labor 280.00

3 Metal Sidings Carpenter 6.35 sq.m./day 380.00 59.82


Labor 280.00

Non-Metal
4 Sidings Carpenter 5.59 sq.m./day 380.00 67.95
Labor 280.00

FORMWORKS

Continous Wall
1 Type (CHB) Carpenter 11.43 sq.m./day 380.00 47.25
Labor 20.00 sq.m./day 280.00

Foundation on
2 Pile Caps Carpenter 5.33 sq.m./day 380.00 94.00
Labor 12.31 sq.m./day 280.00

Grade beam or
3 FTB Carpenter 10.67 sq.m./day 380.00 49.63
Labor 20.00 sq.m./day 280.00
Walls Ground
4 to 8' high Carpenter 7.27 sq.m./day 380.00 77.45
Labor 11.11 sq.m./day 280.00

Walls 8' to 16'


5 high Carpenter 6.61 sq.m./day 380.00 84.78
Labor 10.26 sq.m./day 280.00
82.76

Walls 16' to 20'


6 high Carpenter 5.93 sq.m./day 380.00 95.63
Labor 8.89 sq.m./day 280.00

7 Columns Carpenter 6.56 sq.m./day 380.00 85.95


Labor 10.00 sq.m./day 280.00

Beams &
8 Girders Carpenter 4.21 sq.m./day 380.00 132.95
Labor 6.56 sq.m./day 280.00

Elevated Slabs
9 (Word Shores) Carpenter 6.96 sq.m./day 380.00 95.23
Labor 6.90 sq.m./day 280.00

Elevated Slabs
(Adjusted
10 Shores) Carpenter 11.43 sq.m./day 380.00 64.75
Labor 8.89 sq.m./day 280.00

DEMOLITION

With
By hand w/ Pneumati
1 sledge Laborer 2.47 sq.m./day 280.00 113.40 c Breaker

ELEVATED SLABS

With
By hand w/ Pneumati
1 sledge Laborer 0.49 cu.m./day 280.00 568.40 c Breaker

CONCRETE WALLS

With
By hand w/ Pneumati
1 sledge Laborer 0.56 cu.m./day 280.00 504.35 c Breaker

REMOVE CONCRETE CURBS

With
By hand w/ Pneumati
1 sledge Laborer 5.41 lm/day 280.00 51.80 c Breaker
CUT CONCRETE OPENINGS

With
By hand w/ Pneumati
1 sledge Laborer 0.44 cu.m./day 280.00 641.90 c Breaker

UNIT MAN HOURS ITEM OF WORK

Common
Excavation
1 (Manual) Laborer 1.33 cu.m./day 280.00 210.00

Common
Excavation
2 (Machine) Spotter 16.00 cu.m./day 280.00 17.50

Hook
Excavation
(Manual &
3 Machine) Labor 1.00 cu.m./day 280.00 280.00

Structural
Backfill
4 (Manual) Labor 1.60 cu.m./day 280.00 175.00

Structural
Backfill
5 (Backfill) Labor 4.00 cu.m./day 280.00 70.00

6 Hauling Spoils Labor 8.00 cu.m./day 280.00 35.00

Trenching by
7 Hand Labor 1.33 cu.m./day 280.00 210.00

Trenching by
8 Machine Labor 40.00 cu.m./day 280.00 7.00

RC PIPES INSTALLATION

1 100mmø = 4" Mason 7.95 lm/day 660.00 82.99


d=1m Labor

2 150mmø = 6" Mason 7.93 lm/day 660.00 83.19


d=1m Labor

3 200mmø = 8" Mason 7.91 lm/day 660.00 83.39


d=1m Labor

4 250mmø = 10" Mason 7.90 lm/day 660.00 83.59


d=1m Labor
5 300mmø = 12" Mason 7.85 lm/day 660.00 84.12
d=1.25m Labor

6 375mmø = 15" Mason 7.81 lm/day 660.00 84.50


d=1.25m Labor

7 450mmø = 18" Mason 7.78 lm/day 660.00 84.88


d=1.25m Labor

8 525mmø = 21" Mason 7.59 lm/day 660.00 86.91


d=2m Labor

9 600mmø = 24" Mason 7.54 lm/day 660.00 87.52


d=2m Labor

10 675mmø = 27" Mason 7.43 lm/day 660.00 88.83


d=2.25m Labor

11 750mmø = 30" Mason 7.37 lm/day 660.00 89.52


Labor

12 825mmø = 33" Mason 7.32 lm/day 660.00 90.20


Labor
MATERIAL/ EQUIPMENT Total Unit Unit Remarks
Capacity Unit Cap.
Rental/day( Php)
Unit Cost Cost ( Php )
200.00 cu.m./day 9,285.68 46.43 234.24 Php/cu.m. Ex-vat

571.41 Php/cu.m.
Ex-ohp
oader & Tamped "
192.00 cu.m./day ### 66.97 260.04 Php/cu.m.
19.05 cu.m./day 380.00 19.95

1.00 bag/drum 180.00 1.80 6.80 Php/sq.m. "

9.00 bags 200.00 1,800.00 3,360.25 Php/cu.m. "


0.49 cu.m. 600.00 291.60
0.97 cu.m. 450.00 437.40
1.00 truck/wet 300.00 300.00
2,829.00
0.30 bags/sq.m. 200.00 60.00 182.75 Php/sq.m. " AREA
0.12 cu.m. 450.00 54.00 10
114.00
AREA
13.00 pcs 25.00 156.00 442.54 Php/sq.m. " 5
0.40 bag 200.00 80.00
0.10 cu.m. 450.00 45.00
281.00
0.30 bags 302.00 90.60 590.43 Php/sq.m. "
0.12 cu.m. 450.00 54.00
25.00 pcs 12.00 300.00
6.00 l.m. 50.00 8.33
452.93
1.00 kg 32.00 38.19 Php/sq.m. "

25.00 sq.m./gal 2,200.00 88.00 101.75 Php/sq.m. "

15.00 sq.m/set 6,500.00 433.33 488.33 Php/sq.m. "

1.00 sq.m. 225.69 225.69 597.09 Php/sq.m. "


6.50 bd ft 12.00 78.00
0.10 kg 32.00 3.20
10.00 bd ft 12.00 120.00
0.20 liter 10.00 2.00
428.89
1.00 cu.m. 300.00 300.00 895.00 Php/sq.m. "

0.10 cu.m. 3,200.00 320.00


620
0.08 cu.m. 2,900.00 217.50 475.00 Php/sq.m. "
2.50 kgs 32.00 80.00
0.50 sq.m. 300.00 150.00
447.50
1.00 pcs 380.00 380.00 765.00 Php/l.m. "
0.05 cu.m. 2,200.00 110.00
490.00
0.02 cu.m. 2,500.00 50.00 150.00 Php/ l.m. "

27.00 bd ft/day 33.00 891.00 1,766.00 Php/Set "

250
Accessories

1,141.00
41.00 bd ft/day 33.00 1,353.00 2,253.00 Php/Set "
2x35x7/12
1.00 set 350.00 350.00
1,703.00
50.00 sq.m./gal 180.00 3.60 106.48 Php/sq.m. "
45.00 sq.m./gal 110.00 2.44
40.00 sq.m./gal 650.00 16.25
35.00 sq.m./gal 650.00 18.57
30.00 sq.m./gal 650.00 21.67
30.00 sq.m./sq ft 45.00 1.50

64.03
0.10 bags 200.00 20.00 105.83 Php/l.m. "
0.05 cu.m. 450.00 22.50
42.50
4.00 sq.m./can 120.00 30.00 185.00 Php/sq.m. "
0.50 bags 200.00 100.00
130.00

3.00 sq. ft 35.00 105.00 355.00 Php/sq.m. "


1.00 liter 85.00 85.00
0.50 kgs 55.00 27.50
217.50
71.43 Php/l.m.. "

0.20 bags 200 40.00 137.50 Php/l.m.. "


0.05 cu.m. 450.00 22.50
62.50
- - Php/cu.m. "
-
-
- 67.20 Php/cu.m. "
-
-
- - Php/cu.m. "
-
-
Loader & Tamped - Php/cu.m. "

192.00 cu.m./day ### 66.97 188.65 Php/cu.m.

- - Php/cu.m. "
-
-
- - Php/cu.m. "
-
-
0 0 Php/cu.m. "
0 0 Php/cu.m. "
0

0 0 Php/cu.m. "
0 0 Php/cu.m. "

0 0 Php/cu.m. "

0 0 Php/cu.m. "
0 0 Php/cu.m. "
2,400.00 sq.m./day ### 258.10
2.00 trips ### 141.20
(Mob & Demob)
67.39 sq.m./day

5.38 cu.m./day

11.65 cu.m./day

22.22 lm/day
1.01 cu.m./day
MASON@520PHP LABOR@481
520 481 CEMENT(class"B") SAND ALLOWANCE
52 48.1 49.2 24 18.75
MASON@520PHP LABOR@481 CHB@25
520 481 25 CEMENT(class "D" SAND ALLOWANCE
104 96.2 312.5 129.765 101.25 18.75
TOTAL VAT AND PROFIT TOTAL UNIT COST
202.05 35 237.05

TOTAL 27.16% VAT AND PROFIT TOTAL UNIT COST


767.465 297.705 1065.17