0% found this document useful (0 votes)
219 views13 pages

Project Planning and Monitoring Tool: Important Notice

This tool assists with project planning and monitoring. It allows the user to plan tasks, milestones and baselines. As the project progresses, actual start and end dates are tracked and compared to the plan. The tool provides instructions on entering data and a chronological overview of its sections for planning, monitoring and reporting. It warns that the tool has Excel limitations but can perform advanced functions.

Uploaded by

mzai2003
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
219 views13 pages

Project Planning and Monitoring Tool: Important Notice

This tool assists with project planning and monitoring. It allows the user to plan tasks, milestones and baselines. As the project progresses, actual start and end dates are tracked and compared to the plan. The tool provides instructions on entering data and a chronological overview of its sections for planning, monitoring and reporting. It warns that the tool has Excel limitations but can perform advanced functions.

Uploaded by

mzai2003
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 13

Project Planning and Monitoring Tool

Purpose:
This tool assists in organizing and monitoring project work. By using the task planning section, project milestones and tasks can accurately be planned out. Once the project begins, real-
time progress is tracked and the project is monitored against the set baselines.

Instructions:
This tool can be used for managing a project, starting with the planning stages right through to monitoring project progress. Refer to the boxes below to view each sections' instructions,
and understand how each step is useful for managing projects.

Alternatively, information entered in Microsoft Project can be copied and pasted into this tool to take advantage of its reporting capabilities. A simple copy and paste will work, however
there is some preparation needed:
1. Ensure that the fields in MS Project are altered to match this tool. The order should be: Task Name, Start, Finish, and Resource Names.
2. Once pasted into this tool's Tab 2, reformat the start and finish columns to use a date format (within the Format menu, choose "Cells..." and select the desired date format).
3. Resource Names within MS Project must match the naming conventions used in this tool's Tab 1, table 1.

Important Notice:
Although this tool is capable of advanced functions, keep in mind that this is a light project management tool working within the limitations of Microsoft Excel.
Pay close attention to any notices or warnings included within the individual tabs.

Getting Started:
In chronological order, use the boxes below to navigate through the tool as the project progresses. Click the blue buttons to go directly to the section of choice, or use the worksheet tabs
along the bottom of the spreadsheet screen. Some of the column headings in the sections include comments that offer additional instructions. Hover the mouse over the column
headings to view these instructions.

DATA ENTRY PROJECT TASK PLANNING

This section requires some basic data entry to get the project started. Use this important section to plan out the project. Tasks should be
Information regarding project start and end dates, project team members entered, along with deadlines and task owners. Once hashed out and
and stakeholders, and non-work days is required. completed, copy and paste this plan into Tab 3 to begin monitoring project
progress.

Go to Data Entry Go to Project Task Planning

PROJECT MONITORING CHART ISSUE LOG

Copy and paste the project plan from Tab 2 into the first four columns of If issues arise, use this area to log and ensure that problems are resolved.
this Gantt chart. By entering the actual start and end dates for tasks, this
chart allows you to view which tasks are on schedule, behind schedule or
ahead of schedule.

Go to Project Monitoring Go to the Issue Log

CUSTOMIZED PROGRESS REPORT

Use this section to generate a custom progress report. Specify the time
period that you would like to view and tasks during this time, ordered by
task owner, will appear. This report is ideal for weekly meeting updates, or
stakeholder progress reporting.

Go to Task Report
Basic Data Entry Return to the Introduction

Fill in all of the white cells with the necessary information. To view additional instructions, hover your mouse over the table column headings.

Project Name QUALIFY NET330

Estimated Project Start Date February 6, 2019

Estimated Project End Date June 20, 2019

Project Manager Name Jennifer E

1. Project Team Members, Task Groups &


2. Holidays / Time Off Project
Stakeholders

Name Date Holiday


Amy S
Rob E
Planning Return to the Introduction

Use this section to work out the project plan. Feel free to add and delete rows as necessary, or move tasks around until the optimal project plan has
been drafted. Once satisfied with the project plan, copy this information and paste it into the corresponding table in Tab 3. No changes can be
made to the project plan within Tab 3, so ensure that if any changes are needed, the adjustments are made in this tab before re-copying and re-
pasting the data into Tab 3.

An example has been included below.

Project Task Information

Estimated Task Owner


Estimated Start
Project Task Completion (MUST USE DROP
Date
Date DOWN MENU)

Project Feasibility Study 7-Feb-19 20-Jun-19


Cost Benefit Analysis 7-Feb-19 14-Feb-19

Project Kick-Off Meeting 12-Feb-19 12-Feb-19

Create Phase 1 Plan and Definition


Phase 1 Execution Kick-Off
Communicate Phase 1 Progress
Change Control Processes
Close Phase 1

Create Phase 2 Plan and Definition


Phase 2 Execution Kick-Off
Communicate Phase 2 Progress
Change Control Processes
Close Phase 2

Project Delivery
Project Closure Meeting
Performance Appraisal
Project Feedback Form
Project Debrief Report
Work Schedule Monitoring Return to the Introduction

GANTT CHART LEGEND

IMPORTANT NOTICE: Holiday / Vacation / No Work


It is very important that tasks are entered with unique names. If task names are repeated, the data will not carry over correctly.
Make sure to name each task differently. Planned Project Work Day

Task Completed
IMPORTANT NOTICE:
Rows cannot be inserted or deleted from the table below. If changes are made to the project plan, make these changes in Tab 2. COMPLETION STATUS LEGEND
Planning, and copy and paste the changes into this sheet. Be aware that the actual start and end dates will not update when
changes are copy and pasted into this sheet, so make adjustments to these last two columns as necessary. Task Completed Ahead of Schedule

Task Completed Behind Schedule

Project Task Information Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22 Week 23 Week 24 Week 25 Week 26

4-Feb 11-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr 22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul 15-Jul 22-Jul 29-Jul
Estimated Actual
Estimated Actual Start
Project Task Completion Task Owner Completion Comments
Start Date Date 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 30 1 2 3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 29 30 31 3 4 5 6 7 10 11 12 13 14 17 18 19 20 21 24 25 26 27 28 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 30 31 1 2
Date Date
M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F M T W T F

Project Feasibility Study 6-Feb-19 10-Feb-19 Team 6-Feb-19 9-Feb-19 y y y

Cost Benefit Analysis 12-Feb-19 14-Feb-19 Team x x x

Project Definition 18-Feb-19 18-Feb-19 Amy S 6-Jun-09 9-Jun-09 y

Assign Resources 19-Feb-19 19-Feb-19 Jennifer 8-Jun-09 x

Create Project Plan 20-Feb-19 20-Feb-19 x

Create Communications Plan 21-Feb-19 21-Feb-19 x

Project Kick-Off Meeting 19-Jun-09 19-Jun-09

Create Phase 1 Plan and Definition 18-Feb-19 18-Feb-19 x

Phase 1 Execution Kick-Off 19-Feb-19 19-Feb-19 x

Communicate Phase 1 Progress 25-Feb-19 28-Feb-19 x x x x

Change Control Processes 28-Feb-19 28-Feb-19 x

Close Phase 1 2-Jul-09 3-Jul-09

Project Delivery 18-Feb-19 18-Feb-19 x

Project Closure Meeting 19-Feb-19 19-Feb-19 x

Performance Appraisal 20-Feb-19 20-Feb-19 x

Project Feedback Form 21-Feb-19 21-Feb-19 x

Project Debrief Report 17-Jul-09 20-Jul-09


Issue Log Return to the Introduction

Date Issue Comments Resolution

3-Jan-09 Sample Issue


Customized Progress Report Return to the Introduction

To create a customized progress report, insert the desired timeframe for analysis in the start and end date boxes below. For a progress report of the entire project, insert the project's start and end dates. Consider
running reports based on tasks for today, this week, or next week.

IMPORTANT NOTICE:
Task owner names must be selected from the drop down menus in Tabs 2 and 3 in order for this reporting page to work correctly. If errors occur on this page, return to the project planning stage and ensure that
task owner names were selected from the menus, rather than typed in manually.

Enter Date to Start Progress Report Wednesday, February 06, 2019 Enter Date to End Progress Report Thursday, June 20, 2019

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule 12% Tasks


20% Tasks - Started Completed Project
6% Days Left

Behind Schedule
Tasks In
Tasks - Not Yet
Progress
108.96% -8.96%
Started
Project
Days
80% Tasks Not Yet Passed
Regularly
Scheduled Tasks 82% Started

0.00% 20.00% 40.00% 60.00% 80.00% 100.00%

Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

Page 7
Enter Date to Start Progress Report Wednesday, February 06, 2019 Enter Date to End Progress Report Thursday, June 20, 2019

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule 12% Tasks


20% Tasks - Started Completed Project
6% Days Left

Behind Schedule
Tasks In
Tasks - Not Yet
Progress
108.96% -8.96%
Started
Project
Days
80% Tasks Not Yet Passed
Regularly
Scheduled Tasks 82% Started

0.00% 20.00% 40.00% 60.00% 80.00% 100.00%

Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

Page 8
Enter Date to Start Progress Report Wednesday, February 06, 2019 Enter Date to End Progress Report Thursday, June 20, 2019

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule 12% Tasks


20% Tasks - Started Completed Project
6% Days Left

Behind Schedule
Tasks In
Tasks - Not Yet
Progress
108.96% -8.96%
Started
Project
Days
80% Tasks Not Yet Passed
Regularly
Scheduled Tasks 82% Started

0.00% 20.00% 40.00% 60.00% 80.00% 100.00%

Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

Page 9
Enter Date to Start Progress Report Wednesday, February 06, 2019 Enter Date to End Progress Report Thursday, June 20, 2019

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule 12% Tasks


20% Tasks - Started Completed Project
6% Days Left

Behind Schedule
Tasks In
Tasks - Not Yet
Progress
108.96% -8.96%
Started
Project
Days
80% Tasks Not Yet Passed
Regularly
Scheduled Tasks 82% Started

0.00% 20.00% 40.00% 60.00% 80.00% 100.00%

Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

Page 10
Enter Date to Start Progress Report Wednesday, February 06, 2019 Enter Date to End Progress Report Thursday, June 20, 2019

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule 12% Tasks


20% Tasks - Started Completed Project
6% Days Left

Behind Schedule
Tasks In
Tasks - Not Yet
Progress
108.96% -8.96%
Started
Project
Days
80% Tasks Not Yet Passed
Regularly
Scheduled Tasks 82% Started

0.00% 20.00% 40.00% 60.00% 80.00% 100.00%

Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

Page 11
Enter Date to Start Progress Report Wednesday, February 06, 2019 Enter Date to End Progress Report Thursday, June 20, 2019

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule 12% Tasks


20% Tasks - Started Completed Project
6% Days Left

Behind Schedule
Tasks In
Tasks - Not Yet
Progress
108.96% -8.96%
Started
Project
Days
80% Tasks Not Yet Passed
Regularly
Scheduled Tasks 82% Started

0.00% 20.00% 40.00% 60.00% 80.00% 100.00%

Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

Page 12
Enter Date to Start Progress Report Wednesday, February 06, 2019 Enter Date to End Progress Report Thursday, June 20, 2019

Analysis of On-Schedule Tasks to Date Analysis of Task Completion to Date Analysis of Project Time Management

Behind Schedule 12% Tasks


20% Tasks - Started Completed Project
6% Days Left

Behind Schedule
Tasks In
Tasks - Not Yet
Progress
108.96% -8.96%
Started
Project
Days
80% Tasks Not Yet Passed
Regularly
Scheduled Tasks 82% Started

0.00% 20.00% 40.00% 60.00% 80.00% 100.00%

Scheduled Due
Task Owner Task to be Completed During Specified Period Task Status On Track Status
Date

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

#N/A #N/A #N/A #N/A #N/A

Page 13

You might also like