1. Prepare a detailed estimate for earthwork for a portion of a road from the following Data.
[16]
0 114.75 115
50 114.75
100 115.25 Upward. gradient 1 in 100
up to 300 m.
150 115.20
200 116.10
Gradient of 1 in 200 up to
250 116.85 500 m
300 118.00
350 118.25
400 118.07
450 118.80
2. Write about
a) Gross income
b) Salvage value and
c) Ratable value. [16]
3.a) Under what conditions a contract may be terminated. Discuss in brief about each
condition.
b) Write short notes on:
i) Earnest Money and
ii) Security deposit. [8+8]
PART – B
4. Calculate the quantities of the following items for the building shown in figure 3.
a) OBD inside the building.
b) PCC ([Link]) below the foundation.
c) 12 mm thick plastering inside the building.
• Free Email & SMS
• Solved Question Papers • Expert Advice & Discussion Board
[Link] • Mock Exams (EAMCET, CAT, IIT, MAT, Gate, etc) • Scholarships & Loans
*******
• Free Email & SMS
• Solved Question Papers • Expert Advice & Discussion Board
[Link] • Mock Exams (EAMCET, CAT, IIT, MAT, Gate, etc) • Scholarships & Loans