Bridge Construction Cost Analysis

The document provides a cost estimate for construction of a bridge including concrete, steel, and other materials. It lists the quantities of various concrete elements of the bridge like piles, pier caps, piers, etc. It also lists the quantities of steel required and costs for formwork, equipment, and other expenses. The total estimated cost for construction is Rs. 28,89,54,53.86. Measurement details are also provided listing the unit, numbers, dimensions of different structural elements of the bridge.

Uploaded by

vikrant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
177 views3 pages

Bridge Construction Cost Analysis

The document provides a cost estimate for construction of a bridge including concrete, steel, and other materials. It lists the quantities of various concrete elements of the bridge like piles, pier caps, piers, etc. It also lists the quantities of steel required and costs for formwork, equipment, and other expenses. The total estimated cost for construction is Rs. 28,89,54,53.86. Measurement details are also provided listing the unit, numbers, dimensions of different structural elements of the bridge.

Uploaded by

vikrant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Abstract

S no Particular Unit Qty Indian Amount


Rate
A Concrete

1 pile Cum 139.887 25000 3497175


2 pile cap Cum 68.75 14000 962500
3 pier Cum 233.145 14000 3264030
4 pier cap Cum 132 14000 1848000
5 trapeziodal section Cum 63.25 14000 885500

6 support beam Cum 39.6 14000 554400


7 slab Cum 200 14000 2800000
Total 13811605

B Steel MT 140.26112 60000 8415667.2

C For Liner, 6668181.66


shuttering , all
equipments and
tools and tackles
etc

Total 28895453.86

Area of Bridge Sqm 80 10 800

Rate / 36119.31733
Sqm

Note It does not include preparing access to the project site ,


installation of crane , barge etc

It does not include labour camp construction


It does not include electrical costs , DG set cost
Measurement Sheet

S NO ITEM UNIT NOS LENGTH BREADTH HEIGHT

A Concrete
1 PILE Cum 44 0.63585 5
2 PILE CAP Cum 11 2.5 2.5 1
3 PIER Cum 11 1.76625 12
4 PIER CAP Cum 33 2 2 1
5 TRAPEZOIDAL Cum 11 10 1.5 1
SECTION

6 SUPPORT BEAM Cum 33 8 0.3 0.5


7 SLAB Cum 10 8 10 0.25

Total

B Steel KG

MT

C Shuttering
Pier Sqm 11 104
Quantity Considerations

139.887 pile dia 0.9


68.75 pier dia 1.5
233.145
132
63.25

39.6
200

876.632

140261.12

140.26112

1144

You might also like