100% found this document useful (1 vote)
210 views4 pages

Monitoring and Evaluation Sheet For The Progress of 5S-Kaizen Activities

This document provides a monitoring and evaluation sheet to assess the progress of 5S-Kaizen activities at a hospital. It contains 8 sections that evaluate different aspects of 5S implementation, including leadership commitment, sorting, setting in order, cleaning, standardization, sustainability, productivity, and quality. Department supervisors are to conduct assessments and rate performance in each area on a scale of 1 to 5. The overall scores are calculated to measure how well the hospital has adopted 5S principles and achieved continuous improvement goals.

Uploaded by

anludfi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
210 views4 pages

Monitoring and Evaluation Sheet For The Progress of 5S-Kaizen Activities

This document provides a monitoring and evaluation sheet to assess the progress of 5S-Kaizen activities at a hospital. It contains 8 sections that evaluate different aspects of 5S implementation, including leadership commitment, sorting, setting in order, cleaning, standardization, sustainability, productivity, and quality. Department supervisors are to conduct assessments and rate performance in each area on a scale of 1 to 5. The overall scores are calculated to measure how well the hospital has adopted 5S principles and achieved continuous improvement goals.

Uploaded by

anludfi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

MONITORING AND EVALUATION SHEET FOR THE PROGRESS OF

5S-KAIZEN ACTIVITIES
Date:
Ver. 2013-February
HOSPITAL: DEPARTMENT:
AWA

Very well
Poorly
poorly
RD

Fairly
Very

Well
DESCRIPTION
MAR
KS
LEADERSHIP
1 Role & Commitment of Management, Sustainability of 5-S activity, Training Program for Middle Mgt., Setting
up 5-S Committees, 5-S Campaigns.
Commitment, knowledge, Awareness on 5S among
1.1 1 2 3 4 5
Managers and health workers
5S progress meeting, monitoring evaluation
1.2 1 2 3 4 5
conducted by WIT and recorded in minutes
Evidence of trainings conducted for Managers and
1.3 1 2 3 4 5
health workers
TOTAL Full mark 15
Acquired marks / 15 x 100 =
SEIRI – (SORTING) “Sasambua”
2 Clutter free Environment in Premises, Inside Offices, Work Place, etc. Evidence of removal of unwanted items
should be evident all around.
Unwanted items removed from Premises, Offices,
2.1 1 2 3 4 5
Work Places including drawers, cabinets and shelves
2.2 Walls are free of old posters, calendars, pictures 1 2 3 4 5
Notice Boards – Current Notices with removal
2.3 1 2 3 4 5
instructions
Color cording for waste disposal maintained and
2.4 1 2 3 4 5
standards followed
TOTAL Full mark 20
Acquired marks / 20 x 100 =
SEITON – (SETTING / ORGANISATION) “Seti”
3 Ability to find whatever is required with the least possible delay, evidence of eliminating the waste of time
throughout the Institute/Organization.
Photographic evidence of Pre 5-S Implementation and
3.1 1 2 3 4 5
afterwards
Visual Control methods adopted to prevent mix-up of
3.2 1 2 3 4 5
items (files, equipment, tools etc.)
Directional Boards from hospital entrance to all
facilities under your section/departments (office,
3.3 1 2 3 4 5
wards, laboratory etc.) and corridors are clearly
marked
All machines/Rooms/Toilets/Switches/fans regulators
3.4 1 2 3 4 5
etc. have identification labels
All items are arranged according to ‘Can See’, ‘Can
3.5 1 2 3 4 5
Take Out’ & ‘Can Return’ principle
3.6 X-axis, Y-axis alignment is evident everywhere 1 2 3 4 5

1
TOTAL Full mark 30
Acquired marks / 30 x 100 =
SEISO – (SHINING / CLEANLINESS) “Safisha”
4
The Cleanliness all round the Institution should have been carried out according to the 5-S Concepts.
Floors, Walls, Windows, Toilets, Change Rooms in
4.1 1 2 3 4 5
working order & clean
Cleaning responsibility Maps and Schedules
4.2 1 2 3 4 5
displayed
4.3 Waste bin strategy is implemented 1 2 3 4 5
4.4 Use of adequate cleaning tools is evident 1 2 3 4 5
Storage of cleaning tools – Brooms/Maps/Other
4.5 1 2 3 4 5
equipment
Machines/Equipment/Tools/Furniture at a high level of
4.6 1 2 3 4 5
Cleanliness & maintenance schedules displayed
TOTAL Full mark 30

Acquired marks / 30 x 100 =

SEIKETSU – (STANDARDIZATION) “ Sanifisha”


5 High level of Standardization in all activities carried out in SEIRI, SEITON and SEISO and the evidence of
such standards being practiced all around.
Adopt 5-S procedures & standardized on Check list,
5.1 1 2 3 4 5
Labels Corridors/Isles & Gangways
Standardization of Maintenance/Storage of
5.2 Files/Records / Orderliness in Keeping 1 2 3 4 5
Furniture/Equipment in Offices/Workplaces, etc.
Standardized check lists for common Administrative
5.3 1 2 3 4 5
Procedures in hospital and department
TOTAL Full mark 15
Acquired marks / 15 x 100 =
SHITSUKE – (SUSTAIN / SELF DISCIPLINE) “Shikilia”
6 Evidence of an disciplined approach to all 5-S activities through proper Training & Development, which shows
the sustainability in the long term.
Evidence of regular training program for all categories
6.1 1 2 3 4 5
of Employees in the section
Evidence of WIT Activities & promotion of Kaizen
6.2 1 2 3 4 5
Schemes
6.3 Evidence in carrying out Internal Audits by WIT 1 2 3 4 5
Evidence of Self Discipline among visitors to the
6.4 1 2 3 4 5
Institution
6.5 Evidence of Self-Discipline in the overall Institution 1 2 3 4 5
TOTAL Full mark 25
Acquired marks / 25 x 100 =
GRAND TOTAL for 5S activities Full mark 135

2
Productivity/Services
7
Measures how efficiently inputs to Output are used to produce goods & services with better management
techniques and work methods.
Evidence of methods & systems adopted to improve
7.1 1 2 3 4 5
productivity/employee
Efficiency and effectiveness, use of innovative method
7.2 1 2 3 4 5
to increase and sustain productivity
Evidence in the use of 5S Process to increase
7.3 1 2 3 4 5
Productivity
TOTAL Full mark15
Acquired marks / 15 x 100 =
Quality
8 Goal is to create satisfied customers by doing 100% right work, responding speedily to requirements every
time thus gaining trust & confidence.
Communication plans are evident for Implementation
8.1 1 2 3 4 5
of Quality Improvement
Evidence of fewer rejects, less wastage, less rework
8.2 1 2 3 4 5
through 5S Process
The Quality in the Process of the Manufacture/Service
8.3 1 2 3 4 5
by 5S implementation
TOTAL Full mark 15
Acquired marks / 15 x 100 =
Cost
9 The intrinsic cost of providing products/services to declared standards by a given specified process right first
time and every time
Evidence in reduction in cost of materials, Labor,
9.1 Energy, Overheads lowering of defects etc. by 1 2 3 4 5
introducing 5S concept
Tangible cost advantages through 5S methods in
9.2 1 2 3 4 5
waste control
Evidence of lowering Inventory Cost by the use of 5S
9.3 1 2 3 4 5
Methods
TOTAL Full mark 15
Acquired marks / 15 x 100 =
Safety
10
The overall safety to Employees, Visitors and Property is evidently displayed by the use of 5S Process
Evidence of the effect of safety measured by less
10.1 1 2 3 4 5
accidents occurred in the year
Methods applied in Machinery & Equipment on safety
10.2 1 2 3 4 5
measures
Methods applied to protect the Employees/Visitors on
10.3 1 2 3 4 5
accident
Evidence of Safety Measures applied in providing an
10.4 1 2 3 4 5
excellent health service
10.5 Evidence knowledge and skills of employee on safety 1 2 3 4 5
TOTAL Full mark 25
Acquired marks / 25 x 100 =

3
Delivery
11
Evidence in the reduction of the delivery time of the Product/Service by the implementation of 5S Process

11.1 Evidence of timely delivery of Products/Services 1 2 3 4 5


Overall effect to health facility by reducing delivery
11.2 1 2 3 4 5
time
Evidence of employee participation to reduce the
11.3 1 2 3 4 5
delivery time
11.4 Evidence of Just In Time in the hospital 1 2 3 4 5
TOTAL Full mark 20
Acquired marks / 20 x 100 =
Morale
12
Evidence in the overall Institution/Organization in improving the Morale by the implementation of 5S Process

12.1 Level of morale displayed by Managers & Workers 1 2 3 4 5


Evidence of projects carried out by the employees to
12.2 1 2 3 4 5
display high level of Morale
12.3 Evidence of 5S - KAIZEN mindset or TQM culture 1 2 3 4 5
TOTAL Full mark 15
Acquired marks / 15 x 100 =
5S Organization, Work Improvement Team (WIT)
13
Role &Activities of WIT,
13.1 Member of WIT are actively working 1 2 3 4 5
13.2 WIT's activities are carried out according schedule 1 2 3 4 5
13.3 Evidence of regular WIT and QIT meeting 1 2 3 4 5
TOTAL Full mark 15
Acquired marks / 15 x 100 =
Empowerment of hospital staff through 5S, KAIZEN, TQM
14
Opportunity and environment for empowerment for hospital staff by themselves
Evidence of learning opportunity for 5S, KAIZEN,
14.1 1 2 3 4 5
TQM
Seminar and Training on 5S-KAIZEN-TQM are
14.2 1 2 3 4 5
conducted for WIT members
TOTAL Full mark 10
Acquired marks / 10 x 100 =
GRAND TOTAL for KAIZEN activities Full mark 130
GRAND TOTAL for section 1 - 14 Full mark 265

You might also like