Construction Material Calculation Sheet

The document contains detailed specifications and calculations for various construction items including footings, columns, beams, and walls. It includes measurements for length, width, height, volume, area, and weight for each item, along with totals for each category. Additionally, it outlines materials required for structural concrete and reinforcing steel, as well as earthworks for excavation and embankment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views36 pages

Construction Material Calculation Sheet

The document contains detailed specifications and calculations for various construction items including footings, columns, beams, and walls. It includes measurements for length, width, height, volume, area, and weight for each item, along with totals for each category. Additionally, it outlines materials required for structural concrete and reinforcing steel, as well as earthworks for excavation and embankment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

>>>

>>> ITEM 803(1)a


footing
no. =
length =
width =
depth =
volume =

TOTAL =

>>> ITEM 804(1)a

Volume =
V(column) =
V(footing) =
Volume =
Volume =

TOTAL =

>>> ITEM 804(1)b

Length =
Width =
Thickness =
Total Volume =

>>> ITEM 804(4)


footing
no. =
length =
width =
thickness =
vol. =
sog
length =
width =
thickness =
volume =

corridor
length =
width =
thickness =
volume =

ramp
length =
width =
thickness =
volume =

TOTAL =

>>>

>>> ITEM 900(1)c2

footing
no. =
length =
width =
thickness =
TOTAL =

FTB1
length =
length =
width =
thickness =
TOTAL =

FTB2
length =
length =
width =
thickness =
TOTAL =

SOG
length =
width =
thickness =
TOTAL =

CORRIDOR
area (autocad) =
length =
TOTAL =

RAMP
area (autocad) =
length =
TOTAL =

TOTAL =

>>> ITEM 900(1)c4

ROOF BEAM

RB1 (250x300)
length =
width =
height =
volume =

RB2 (250x300)
length =
width =
height =
volume =

COLUMN

C1 (350x350)
no.
length =
width =
height =
volume =

Stiffener (300x250)
no.
length =
width =
height =
volume =

TOTAL =

>>> ITEM 902(1)b

FOOTING
Ø bar =
unit weight =
length/footing =
no. of footing =
total length =
Weight =

COLUMN 1
Vert. Bar
Ø bar =
unit weight =
length/column =
no. of column =
total length =
Weight =

TIE BEAM 1
TOP BAR
Ø bar =
unit weight =
length + lapping =
no. of top bar =
total length =
Weight =
TIE BEAM 2
BOTTOM BAR
Ø bar =
unit weight =
length + lapping =
no. of bottom bar =
total length =
Weight =

RB1
TOP & BOTTOM BAR
Ø bar =
unit weight =
length + lapping =
no. of top & bottom bar =
total length =
Weight =

RB2
TOP & BOTTOM BAR
Ø bar =
unit weight =
length + lapping =
no. of top & bottom bar =
total length =
Weight =

TOTAL WEIGHT =

>>> ITEM 902(1)a

SOG
A1 Ø bar =
unit weight =
Short span =
Long span =
Length(s) =
Length(l) =
total length =
weight =

FTB1
Ø bar =
unit weight =
no. of stirrups =
length/stirupps =
total length =
weight =

FTB2
Ø bar =
unit weight =
no. of stirrups =
length/stirupps =
total length =
weight =

Stiffener
Ø bar =
unit weight =
no. of stirrups =
length/stirupps =
no. of columns =
total length =
weight =

Stiffener
Ø bar =
unit weight =
no. [Link] =
length of bar =
no. of columns =
total length =
weight =

COLUMN 1
Ø bar =
unit weight =
no. of stirrups =
length/stirupps =
no. of columns =
total length =
weight =

ROOF BEAM 2
Ø bar =
unit weight =
no. of stirrups =
length/stirupps =
total length =
weight RB 2 =

ROOF BEAM 1
Ø bar =
unit weight =
no. of stirrups =
length/stirupps =
total length =
weight RB 1 =

Corridor
Ø bar =
unit weight =
Short span =
Long span =
Length(s) =
Length(l) =
total length =
weight =

Ramp
Ø bar =
unit weight =
Short span =
Long span =
Length(s) =
Length(l) =
total length =
weight =

TOTAL =

>>> ITEM 903(2)

COLUMN 1
length =
width =
height =
no. columns =
area =

STIFFENER
length =
width =
height =
no. columns =
area =

RB1
width =
depth =
length =
area =

RB2
width =
depth =
length =
area =

TB 1 =
width =
depth =
length =
area =

TB 2 =
width =
depth =
length =
area =

SOG
Length =
thickness =
area =

TOTAL AREA =

>>>

>>> ITEM 1000(1)

AREA (slab) =
AREA (footing) =

L =

>>> ITEM 1046(2)a2


EXTERIOR WALLS
FRONT ELEVATION
Area(autocad) =
deduct area(doors&windows) =
area(doors&windows) =
Front area =

REAR ELEVATION
Area(autocad) =
deduct area(doors&windows) =
area(doors&windows) =
Rear area =

RIGHT ELEVATION
Area(autocad) =
RIGHT ELEVATION =

LEFT ELEVATION
Area(autocad) =
LEFT ELEVATION =

INTERIOR WALLS
groundfloor
length =
height =
area =

TOTAL AREA ext. =

>>> ITEM 1046(2)a1


INTERIOR WALLS
groundfloor
length =
height =
area =
deduction =
Area =

2nd floor
length =
height =
area =
deduction =
Area =

TOTAL AREA int. =

Septic Tank
Area1
Exterior Length =
Height =
Area1 =

Interior Length =
Height =
Area2 =
TOTAL AREA int. =

Pantry
Area =
Area =

Total Area =

>>> ITEM 1021(1)a


ramp
Length =
Width =
Area =

Total Area =

>>> ITEM 1021(1)c


SOG

Area =
Area =
Area Corridor =
Area =

>>> ITEM 1027(1)

Area =
Area =
Area =

>>> ITEM 1003(1)a1

Area (GF)-Autocad =
Area Total =

>>> ITEM 1010(4)

Tanguile Paneled Door =


Glass Transom =
Glass Jalousie =
Jamb =
Lockset =
Hinge =

>>> ITEM 1003(17)


Blackboard
Blackboard =

>>> ITEM 1047(1)


Roof Truss
>>> 2-65mm x 65mm x 6mm
Top Chord =
Bottom Chord =
Total Length =
Unit Weight =
Total Weight =

>>> 2-50mm x 50mm x 6mm


Length Web Member =
Unit Weight =
Total Weight =

Purlins
>>> LC - 150mm x 65mm x 20 x 2mm
Total Length =
Unit Weight =
Total Weight =

>>> Steel Fascia


LC - 255mm x 90mm x 25mm x 3mm
Total Length =
Unit Weight =
Total Weight =

>>> Sag Rods


12mm dia plain
Total length =
Unit Weight =
Total Weight =

>>> Cross Brace


12mm dia plain
Total length =
Unit Weight =
Total Weight =

>>> Turn Buckle


Total =

>>> Long Clip Angle


75mm x 75mm x 6mm x 130mm =
No. =
Weight/pc =
Total Weight =

>>> Base Plate


250mm x 300mm x 12mm Base Plate =
Weight =
Volume =
No. of Base Plate =
Total Weight =

>>> Gusset Plate


10mm thk. Gusset Plate =
Weight =
Volume =
Total Weight =

>>> Anchor Bolt


16mm dia x 300mm Anchor bolt =
12mm dia x 300mm Anchor bolt =
6mm dia J-Bolt =

>>> ITEM 1014(1)b2


`
Length =
Width =
Total Area =

>>> ITEM 1013(2)a2

Length (autocad) =

>>> ITEM 1013(2)b1

Length (autocad) =

>>> ITEM 1013(2)a1

Length (autocad) =
>>> ITEM 1003(11)a1

Length =

>>> ITEM 1051(6)

38mmØ GI Pipe (6m)


Length =
Qty. =

Epoxy Primer
Unit Weight/m =

>>> ITEM 1016(1)a


T&B and Balcony
Area (T&B) =
Area (T&B) =

Balcony =
Balcony =
TOTAL =

>>> ITEM 1032(1)c


Roof Truss
>>> 2-65mm x 65mm x 6mm
h =
s =
Contact Surface Area / Linear =
Contact Surface Area / Linear =
Total Length =
Total Area =

>>> 2-50mm x 50mm x 6mm


h =
s =
Contact Surface Area / Linear =
Contact Surface Area / Linear =
Total Length =
Total Area =

Purlins
>>> LC - 150mm x 65mm x 20 x 2mm
l =
w =
h =
Contact Surface Area / Linear =
Contact Surface Area / Linear =
Total Length =
Total Area =

>>> Steel Fascia


LC - 255mm x 90mm x 25mm x 3mm
Total Length =
l =
w =
h =
Contact Surface Area / Linear =
Contact Surface Area / Linear =
Total Area =

>>> 12mm Sag Rods


diameter =
Contact Surface Area / Linear =
Contact Surface Area / Linear =
Total Length =
Total Area =

>>> 12mm Plain Bar Cross Brace


diameter =
Contact Surface Area / Linear =
Contact Surface Area / Linear =
Total Length =
Total Area =

Total Area =

>>> ITEM 1032(1)a

Wall Area =
Wall Area =
Column =
Stiffener =
RB =
Total Area =

>>> ITEM 1032(1)b

Door and Jamb Area =


Ceiling
Total Area =
EARTHWORKS

Structure Excavation

10.00 unit
1.20 m
1.20 m
1.00 m
14.40 m³

14.40 m³ ok

Embankment from Structure Excavation

Structure Excavation - Conc. Structure


0.92 m³
3.60 m³
Structure Excavation - Conc. Structure
14.4 - 0.92 - 3.60

9.88 m³ ok

Embankment from Common Borrow

19.00
8.00
0.50
76.00 m³ ok

Grave Bedding

10.00
1.20 m
1.20 m
0.10 m
1.44 m³

18.00
7.00
0.100
12.60 m³

18.50
1.50
0.10
2.78 m³

2.41
2.40
0.10
0.58 m³

17.39 m³ ok

STRUCTURAL

Structural Concrete (Footings and Slab on Fill) Class A, 28 days

10.00
1.20 m
1.20 m
0.25 m
3.60 m³

7*5
35.00 m
0.40 m
0.25 m
3.50 m³

18 + 18
36.00 m
0.40 m
0.25 m
3.60 m³

18.00 m
7.00 m
0.10 m
12.60 m³

0.24 m
18.15 m
4.36 m³

0.27 m
2.40 m
0.65 m³

28.30 m³ ok

Structural Concrete (Columns, Beams & Slab) Class A, 28 days

36.00 m
0.25 m
0.30 m
2.70 m³

35.00 m
0.25 m
0.30 m
2.63 m³

10.00 unit
0.35 m
0.35 m
4.10 m
5.02 m³

3.00 unit
0.30 m
0.25 m
2.95 m
0.66 m³

11.56 m³

Reinforcing Steel (Deformed) Grade 60 (16mm and above)

16.00 mm
1.58 kg/m
16.80 m
10.00 unit
168.00 m
265.44 kg

20.00 mm
2.47 kg/m
42.40 m
10.00 unit
424.00 m
1047.28 kg

16.00 mm
1.58 kg/m
40.20 m
2.00 unit
80.40 m
127.03 kg
16.00 mm
1.58 kg/m
37.50 m
5.00 unit
187.50 m
296.25 kg

16.00 mm
1.58 kg/m
26.80 m
2.00 unit
53.60 m
84.69 kg

16.00 mm
1.58 kg/m
67.50 m
5.00 unit
337.50 m
533.25 kg

2353.94 kg

Reinforcing Steel (Deformed) Grade 40 (10mm & 12mm)

10.00 mm
0.62 kg/m
31.00 unit
25.00 unit
176.00 m
187.50 m
363.50 m
225.37 kg

10.00 mm
0.62 kg/m
225.00 unit
1.30 m
292.50 m
181.35 kg

10.00 mm
0.62 kg/m
210.00 unit
1.30 m
273.00 m
169.26

10.00 mm
0.62 kg/m
19.00 unit
0.82 m
3.00
46.74 m
28.98 kg

12.00 mm
0.89 kg/m
4.00 unit
4.95 m
3.00
59.40 m
52.87 kg

10.00 mm
0.62 kg/m
37.00 unit
1.70 m
10.00
629.00 m
389.98 kg

10.00 mm
0.62 kg/m
250.00 unit
1.15 m
287.50 m
178.25 kg

10.00 mm
0.62 kg/m
296.00 unit
1.15 m
340.40 m
211.05 kg

10.00 mm
0.62 kg/m
63.00 unit
8.00 unit
141.75 m
172.00 m
313.75 m
194.53 kg

10.00 mm
0.62 kg/m
9.00 unit
10.00 unit
21.60 m
24.00 m
45.60 m
28.27 kg

1659.90 kg

Formworks and Falseworks

0.35 m
0.35 m
3.05 m
10.00 unit
42.70 m²

0.20 m
0.30 m
3.05 m
3.00 unit
9.15 m²

0.25 m
0.30 m
36.00 m
30.60 m²

0.25 m
0.30 m
35.00 m
29.75 m²

0.25 m
0.40 m
36.00 m
37.80 m²

0.25 m
0.40 m
35.00 m
36.75 m²

78.72 m
0.10 m
7.87 m²

194.62 m²
`

ARCHITECTURAL

Soil Poisoning

159.51 m²
1.44 m²

11.00 l

CHB Non-Load Bearing (including Reinforcing Steel), 150 mm

50.40 m²
4D1 + 4W2
18.80 m²
31.60 m²

50.40 m²
4W1
17.99 m²
32.41 m²

24.13 m²
24.13 m²

24.13 m²
24.13 m²

6.06 m
2.70 m
81.81 m²

194.08 m² ok

CHB Non-Load Bearing (including Reinforcing Steel), 100 mm


10.79 m
2.80 m
30.21 m²
6.03 m²
24.18 m²

11.94 m
2.80 m
33.43 m²
5.25 m²
28.18 m²

54.98 m²

6.60 m
1.50 m

3.00 m
1.50 m

0.00 m²

3*0.6
1.80 m²

Plain Cement Floor Finish

2.40
2.41
5.78 m²

5.78 m² ok

Cement Floor Finish with Floor Hardener

60.33*2 autocad
120.66
27.75
148.41 m² ok

Cement Plaster Finish

2x(item 10462(a)1)
2 x 203.03
388.17 m² ok

Fiber Cement Board Ceiling on Metal Frame

182.36 m²
182.36 m² ok

Wooden Doors & Windows

7.56 m²
5.52 m²
21.16 m²
16.00 set
4.00 set
12.00 pair ok

Carpentry and Joinery

8.00 sets ok

Structural Steel

64.14 m autocad
43.50 m autocad
107.64 m
5.840 kg/m
628.62 kg

74.16 m autocad
4.43 kg/m
328.53 kg

21.00
395.01 m
4.89 kg/m
1931.60 kg

37.62 m
11.14 kg/m
419.09 kg
77.60 m
0.88 kg/m
68.29 kg

89.60 m
0.88 kg/m
78.85 kg

16.00 pcs

63.00 pcs
0.882 kg/m
55.57 kg

7850.00 kg/m³
0.0009 m³
6.00 pcs
42.39 kg

7850.00 kg/m³
0.0136 m³
112.10 kg

22.72 kg
7.50 kg
6.29 kg

Prepainted Metal Sheets (Rib Type, Long Span,above 0.427 thk)

18.81 m
5.51 m
207.29 m² ok

Fabricated Metal Roofing Accessory: (Gauge 26 Flashing)

22.04 m ok

Fabricated Metal Roofing Accessory (Gauge 24 Gutters)

37.62 m ok

Fabricated Metal Roofing Accessory: (Gauge 26, Ridge/Hip Rolls)

18.81 m ok
Fiber Cement Fascia Board (19mm)

21.38 m ok

Railing

17.20
3.00 pcs

2.00 lit

Waterproofing, Cement Base

(2*1.43)*2
5.72 m²

(2.5*0.8)*2
4.00 m²
9.72 m²

Painting Works (Steel)

0.065 m
0.006 m
(h x 1 x6 faces)+(s x 1 x 3 faces) m
0.42 m²
107.64 m
45.21 m²

0.05 m
0.006 m
(h x 1 x6 faces)+(s x 1 x 3 faces) m
0.33 m²
74.16 m
24.47 m²

0.15 m
0.065 m
0.02
(lx 1 x2 faces)+(w x 1 x 4 faces)+(h x 1 x 4 faces) m
0.64 m²
395.01 m
252.81 m²

37.62 m
0.255 m
0.09 m
0.025 m
(lx 1 x2 faces)+(w x 1 x 4 faces)+(h x 1 x 4 faces)
0.97
36.49 m²

12.00 mm
2*3.1416*r (1)
0.04 m²
77.60 m
2.93 m²

12.00 mm
2*3.1416*r (1)
0.04 m²
89.60 m
3.38 m²

365.28 m²

Painting Works (Masonry/Concrete)

Area Cement Plaster


388.17 m²
39.20 m²
7.56 m²
22.63 m²
457.56 m² ok

Painting Works: Wood

8.40 m²
182.36
190.76 m² ok
256.00
162.16
1.58
0.08

9000.00
720.00
0.006000

0.62
285.50