APPENDIX A
Delivery
No Description Remark
Time (Week)
I Calculation
1 Pressure Vessel calculation. Including calculation as follows but not limitted.
2 Shell, head, nozzle minimum wall thickness calculation.
3 Allowable nozzle load calculation.
Detailed Lifting and Tailing calculations including local load stresses in shell/ Skirt, and shell bending stresses in
4
vertical.
5 Calculations of slinging stresses in vessel shell, during lifting operations with vessel in vertical position.
6 Local load analysis to WRC-107. (the external load shall be calculated according to WRC 107 & WRC 297).
II Drawing & Datasheet
1 Vessel datasheet
2 General Arrangement drawings.
3 Detail construction drawings for pressure vessel.
4 Skirt support detail drawing.
5 Name plate detaill drawing.
III Organization
1 Organization chart.
2 Factory lay-out.
3 C/Q or guarantee certificates.
IV Control of main materials
1 Material requisition form.
2 Purchase order specification.
3 Material receiving inspection report.
5 Mill Certificates type 3.1 & 2.2 according to EN10474/ 10204 for non-critical items and non-pressurized Parts.
6 Material request.
7 Coded marking control log.
8 Storage & Handling of filler metal.
V Control of welding materials
1 Welding material purchase requisition.
2 Welding material receiving inspection report.
3 Certificates of welding material.
4 Consumable request.
5 Baking and holding log for electrodes/flux.
6 Consumable issue log.
VI Control of welder
1 Qualified welder & welding operator register list.
2 Certificates of welder.
VII Welding procedure specification
1 Qualified WPSI PQR register list.
2 Welding procedure specification no.
3 Welding repair procedure.
VIII NDE procedures
1 Magnetic particle inspection procedure.
2 Dye penetrant procedure.
APPENDIX A
Delivery
No Description Remark
Time (Week)
3 Ultrasonic testing procedure.
4 Radiographic testing procedure.
5 Positive material indentification (PMI) procudure.
6 List of NDE personnel.
7 Certificates of NDE personnel.
VIII Fabrication Construction Procedures
1 Cutting plan.
2 Coded marking control procedure.
3 General welding control procedure.
4 Forming control procedure.
5 Dimension control procedure.
6 Post weld heat treatment procedure.
7 Surface preparation & painting procedure
8 Leakage test procedure.
9 Hydrostatic test procedure.
10 Blasting & Painting procedure.
11 Acid pickling and passivation procedure.
12 Repair procedure.
IX Control of construction equipments
1 List of calibration equipment.
2 Verification certificates of equipment.
X Control of Fabrication Reports
1 Inspection & Test Plan.
2 Weld map.
3 Dish end inspection report.
4 Dimension Inspection report.
5 Post weld heat treatment report.
6 Visual test report.
7 Magnetic particle inspection report.
8 Radiographic test report.
9 Ultrasonic test report.
10 Positive material indentification (PMI) test report.
11 Repair report.
12 Hydrostatic test report.
13 Leakage test report.
14 Blasting & Painting report.
15 Acid pickling and passivation report.
16 Dimesional & Tolerance records.
XI Non conformance record
XII Third Party Inspection Report