Restaurant Construction Cost Estimate

The document provides an itemized estimate for the construction of a 38.4m x 15.4m restaurant. It includes costs for substructure works like site clearing, excavation, and foundation construction. Superstructure works such as the concrete floor slab, block walls, beams, and ring beams are also estimated. Finishing works including plastering, painting, floor tiles are detailed. Doors, windows, and electrical installation are accounted for as provisional items. The total estimated cost for constructing the restaurant is 36,156.28 USD.

Uploaded by

Saciid Laafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
219 views4 pages

Restaurant Construction Cost Estimate

The document provides an itemized estimate for the construction of a 38.4m x 15.4m restaurant. It includes costs for substructure works like site clearing, excavation, and foundation construction. Superstructure works such as the concrete floor slab, block walls, beams, and ring beams are also estimated. Finishing works including plastering, painting, floor tiles are detailed. Doors, windows, and electrical installation are accounted for as provisional items. The total estimated cost for constructing the restaurant is 36,156.28 USD.

Uploaded by

Saciid Laafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

EELO UNIVERSITY

Estimation of restaurant in Jail Design

Construction of restaurant- 38.4m *15.4m

Ite Description of Un Spec. QTY Unit Total Cost


m works it Cost
N0.
1 Substructure work
1.1 Allow for M2 38.4*15.4 591.3 0.50 295.68
clearing the 6
site from any
debris, trees,
roots etc,
filling hollows
and leveling.
1.2 Excavation of M3 161.6*0.5*0.8 64.64 7.00 452.48
found trench
0.5m x 0.8m
depth.
1.3 Mass concrete M3 161.6*0.5*0.05 4.027 70.00 281.93
in 50 mm thick 5
blinding layer
([Link] mix)
under the
foundation
wall.
1.4 Rubble stone M3 137.7*0.4*1.1 60.58 45.00 2726.46
foundation 8
wall in cement
& sand mortar
1:4 ( 1.1 m x
0.4m wide)
min. 30cm
above ground
level.
1.5 R.C ([Link] mix) M3 161.1*0.4*0.15 9.696 300.00 2908.80
in ground
beam (0.4m
x0.15m ), with
4N0. Y12 re-
bars & R6 links
@ 300 mm
c/c.
1.6 15cm thick M3 ((38.4*15.4)-(161.6*0.4))*0.15 79.00 10.00 790.08
murram or 8
other
approved
backfill
material, well
compacted
and leveled.
1.7 15 cm thick M3 ((38.4*15.4)-(161.6*0.4))*0.15 79.00 12.00 948.10
stone 8
hardcore
filling well
compacted
and leveled.
A  SUB-TOTAL A $
8,403.52
2 Superstructure works including conc. floor slab
2.1 Mass concrete M3 ((38.4*15.4)-(161.6*0.4))*0.1 52.67 70 3687.04
([Link] mix ) in 2
conc. floor
slab 10cm
thick.
2.2 20cm thick M2 (148.4)*3.1 460.0 15 6900.60
cement block 4
walling laid in
cement &
sand mortar
1:4 mix ( rate
to include
making of
blocks)
2.3 R.C ([Link] mix) M3 148.4*0.2*0.15 4.452 280 1246.56
in lintel
beam(0.2m*0.
15m) with
4N0. Y12 re-
bars & R6 links
@ 250 mm
c/c.
2.4 R.C ([Link] mix) M3 148.4*0.2*0.15 4.452 280 1246.56
top tie beam
conc. ring
beams 15 cm
depth, each
with 4N0. Y12
re-bars & R6
links @ 250
mm c/c.
B  SUB-TOTAL B $
13,080.76
4 Plastering and other finishing
4.1 External & M2 ((148.4)*3*2 890.4 7.00 6232.80
internal
plastering, 25
mm thick,
cement / sand
mix 1:5, with
wood float
finish.
4.2 Apply two M2 ((148.4)*3*2 890.4 5.00 4452.00
coats white
wash and
distemper
paint to the
ceiling and
plastered wall
surface.
4.3 Laying floor M2 148.4 148.4 8.00 1187.20
tiles with
cement screed
1:2
cement/sand
floor screed
including
100mm
skirting.
C SUB-TOTAL C $
11,872.00
5 Doors & Windows
5.1 Supply and fix No Number 2 350 700.00
metal doors .
(2m x 2.3 m)
complete with
frame, hinges
& locks and to
include two
coats of gloss
paint.
5.2 Supply and fix No Number 3 180 540.00
wooden .
imported
doors (1.6m x
2.1 m)
complete with
frame, hinges
& locks and to
include two
coats of gloss
paint.
5.3 Supply and fix   Number 4 140 560.00
wooden
imported
doors (1 x 2.1
m) complete
with frame,
hinges & locks
and to include
two coats of
gloss paint.
5.5 Supply and fix No 9 50 450.00
Allumium .
windows
(1.5m x 1.5m) Number
complete with
burglar bars,
hinges, locks
and to include
two coats of
paint.
D  SUB-TOTAL D $
1,800.00
6 Provisional Items (includes materials & labour )
6.1 Electrical LS LS 1 1000 1000.00
installation
works
E SUB-TOTAL F $
1,000.00
  GRAND TOTAL = (A+B+C+D+E) $ 36,156.28