This document provides a cost estimate for civil works for the extension of the 150kV and 70kV substation in Bagan Batu, Sumatra, Indonesia. It includes costs for site preparation such as clearing, surveying and soil testing. Construction work costs are broken down into foundations for the 150kV equipment and site works. Site work costs include earthworks, roads, fencing, trenches for cables and drainage, and foundations for a 60MVA power transformer. The total estimated cost for the construction works is not provided.

Uploaded by

Zuspran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views2 pages

Boq Volum Swtchyrd PDF

This document provides a cost estimate for civil works for the extension of the 150kV and 70kV substation in Bagan Batu, Sumatra, Indonesia. It includes costs for site preparation such as clearing, surveying and soil testing. Construction work costs are broken down into foundations for the 150kV equipment and site works. Site work costs include earthworks, roads, fencing, trenches for cables and drainage, and foundations for a 60MVA power transformer. The total estimated cost for the construction works is not provided.

Uploaded by

Zuspran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PACKAGE 2 : DESIGN,SUPPLY AND INSTALLATION FOR EXTENSION OF 150 KV and 70 KV

LOT 1 : SUMATERA REGION


Schedule No. 4 : Installation and Other Services
No.1 : Switchyard for Civil Works

LOT 1.8. 150/20 kV BAGAN BATU SUBSTATION ( EXTENSION)


UNIT PRICE TOTAL PRICE
NO. DESCRIPTION UNIT QTY
(Rp.) (Rp.)
1 2 3 4 5 6=4X5

A PREPARATION WORK
1 Site clearing m2 1200,00
2 Setting survey (thopographi : line profile & cross profile) and installation of setting plan Ls 1,00
3 Site storage ( 3 m x 10 m ) m2 30,00
4 Site office ( 4m x 6 m ) ls 1,00
5 Soil Investigation :
5.1. Sondir pcs 2,00
5.2. Boring and Test Lab. pcs 1,00
5.3. Soil Investigation Report pcs 3,00
6 Remove and reinstall existing BRC height 1.2 m m' 70,00
7 Dismantling ex-PLTD building Ls 1,00

Total Item A - (Preparation Works)

B CONSTRUCTION WORKS

B.I FOUNDATION 150 kV (1 Trafo Bay)

1 Circuit Breakers Set 1,00


2 Current Transformer (1 set = 3 unit) Set 1,00
3 Surge Arrester (1 set = 3 unit) Set 1,00
4 Marshalling Kiosks Unit 1,00
5 Disconnecting /& Earthing Switches (DS/E) Set 2,00
6 Gantries Unit 3,00
7 Power Transformer 150/20kV 60 MVA set 1,00
8 NGR (NER) Unit 1,00
9 Post structures for earth wire Unit -
10 Support 20 kV Unit 1,00
Total Item B.I - (Foundation for 150 kV)

B.II SITE WORKS

1 Earth Work
- Excavation work m3 1080,00
- Backfill m3 500,00
- Soil Disposal m3 -
- Import Filling ( compaction in layer of 20 cm) m3 840,00
- Retaining wall or slope protection m3 67,50
2 Road (new) m2
a. Prepare Compacted subgrade : Compacted Sand Gravel 150 mm m2 72,00
b. Base Structure : Crushed Stone 3-5 cm, 150 mm m2 72,00
c. 50 mm Asphalt hot mix m2 72,00
d. 50 mm Ashalt penetration m2 72,00
3 Kerbs (15/30) m' 90,00
4 Fence
- BRC 1.20 m height m' 45,00
- BRC 1.90 m height m' -
- Fabricated concrete 2.00 m height m' -
5 Gate
- BRC 1.20 m height - 4.00 m wide unit 30,00
- BRC 1.90 m height - 6.00 m wide unit -
- Steel Pipe - 6.00 m wide unit -
6 Landscaping m2 -
7 Gravel (dia 3 - 5 cm); t = 20 cm m2 588,00
8 Cable trench (K225, BJTD 40 incld cover, Galvanized Cable Tray L 50.50.5 and PVC Pipe)
- Cable duct type 1 (Large) m' 80,00
- Cable duct type 2 (Medium) m' 50,00
- Cable duct type 3 (Small) m' 10,00
- Cable Duct (Crossing Road) m' 10,00
12 Drainage m' 50,00
13 Sub soil Drainage PVC dia 6 inc including knie PVC dia 6 inc to ground reservoir m' 20,00
14 Fire wall reinforced concrete grade 225/20; thickness = 15 cm, wide = 10 m unit -
Oil Pit Capacity for Trf 60 MVA incld knie and tie pipa dia 6 inc (from foundation transformer to
15 unit 1,00
oil pit) complete with flasplate
16 Bored Pile dia 60 cm m' 300

Total Item B.II - (Site Works) 0

TOTAL ITEM B I-II (CONSTRUCTION WORKS) 0

GRAND TOTAL 0

GRAND TOTAL Switch yard & Control Building 0