DATA REQUIREMENTS FOR ELECTRICAL LOAD CALCULATION
HVAC
1: Total capacity of centeralised chillers system in Tonnage / LRA / BTU / AMPS?
2: Estimated ratings of centralised AHU system motors in HP / KW?
3: Estimated ratings of chilled water pumps in HP / KW?
4: Total capacity of split, crack, windows, FCU and package units (if any) in Tonnage / BTU / LRA / AMPS?
5: Estimated ratings of sum pump and water pumps (if any) in HP / Kw?
6: Total capacity of boiler (if any) ?
FIRE FIGHTING
1: Estimated ratings of fire fighting motor pumps in HP / KW?
IT & DATA CENTER EQUIPMENTS
1: Total AC load requirements in AMPS / KW?
2: Total DC load requirements in AMPS / KW?
3: Ratings of UPS, Inverter and Rectifiers system if required?
LOAD CALCULATION
S?
nnage / BTU / LRA / AMPS?
EQUIPMENT
MOTOR &
RESTARTING
MOTOR
ESSENTIAL
ESSENTIAL
NON-MOTOR
Capacity in Ton RATING RATING
EQUIPMENT
DESCRIPTION
PANEL
NO. A B
A B
VITAL
NON-
kW B kW B
A B
1 Outdoor Process Area Lighting 13.20 13.20
2 Telemetry Bldg. Outdoor Lighting 0.60 0.60
3 Telemetry Bldg. Indoor Lighting 2.12 2.12
4 Telemetry Bldg. Exit and Emergency Lighting 0.12 0.12
5 Telemetry Bldg. Indoor Socket Outlet 2.00 2.00
6 Outdoor Process Area Socket Outlet 0.18 0.18
7 Telecom Cabinet Power Supply Unit 0.80 0.80
8 Power Supply of Batt. Rm Exhaust Fan Contol Pnl 0.50 0.50
9 Telecom Cabinet Cubicle Lighting 0.10 0.10
10 RMU Space Heater 0.20 0.20
11 24 Volts DC UPS Space Heater 0.30 0.30
12 110 Volts DC UPS Space Heater 0.30 0.30
Total Plant Running Load18
(TPRL)KW 7 KVAR kW² + kvar²
(Est. X% SumC + Y% Sum
X = 100 % Y = 30 %
(Existing)
Total Plant Peak Load (TPPL)
18 KW 7 KVAR kW² + kvar²
(Est. X% SumC + Y% Su X = 100 % Y = 30 % Z = 10 %
(Existing)
NOTES: KVAR= KW * tan( cos inverse PF)
REFERENCE:
2176-4417 SINGLE LINE
2176-4001 ELECTRICAL
B Re-issued for Construction 02.03.08
A Approved for Construction 10.01.08
REV. DESCRIPTION DATE
EFFICIENCY POWER KW=A/D CONSUMED LOAD
LOAD FACTOR (=A/B) at load FACTOR
factor C at load CONTINUOUS (Sum C) INTERMITTENT AND SPARES (S
factor C
B IN DEC C IN DEC. D kW kvar E kW
B DES D
ACT. D COS PHI DES. ACT. DES. ACT. DES. ACT.
C C D B phi E_kW E_kvar F_kW
1.00 1.00 0.95 13.20 4.34
1.00 1.00 0.95 0.60 0.20
1.00 1.00 0.95 2.12 0.70
1.00 1.00 0.95
1.00 1.00 0.85 2.00
1.00 1.00 0.85 0.18
1.00 1.00 0.85 0.80 0.50
1.00 1.00 0.85 0.50 0.31
1.00 1.00 0.85 0.10 0.06
1.00 1.00 0.85 0.20
1.00 1.00 0.85 0.30
1.00 1.00 0.85 0.30
19.39
TOTAL 17.32 6.10 2.98
(carried forward to sheet -1/4)
19 kVA
DES. 18 4
kVA = kW² + kvar²
ACT.
Main Contractor :
FERNAS
CONSTRUCTION COMPANY
P.O. Box 32398, Doha, QATAR
TITLE
EPIC OF CONSOLIDATED GAS SUPP
PIPING
JLI AB EI
JLI AB EI
THIS IS AN EXCEL SHEET AND MUST NOT BE ALTERED MANUALLY
APPD DWG NO.
DWN CHK APPD (FERNAS) APPD (QP) 2436-4107
CABLE DETAILS
MEASURED
ONSUMED LOAD kvar=kW*tg phi
CURRENT
P=PVC
RMITTENT AND SPARES (SumI) STAND-BY (SumS) X=XLPE OR EPR
kvar F kW kvar G RATING=SITE RATING
DES. ACT. DES. ACT. DES. ACT. NO. P/X SQ.MM
F_kvar G_kW G_kvar
0.12 0.04
1.24
0.11
0.12
0.19
0.19
1.85 0.12 0.04 Power factor without compensation (cos phi) :
Power factor with compensation (cos phi) :
4 0 required capacitor rating [=kW (tg phi - tg phi)] :
Engineering Consultant:
PENSPEN International LTD.
P.O. Box 1207, Doha, Qatar
PENSPEN PROJECT No. 60334
ATED GAS SUPPLY PROJECTS WITHIN RAS LAFFAN AND MESAIEED AREAS STATION A21 IN
LOAD LIST
(EXISTING DISTRIBUTION BOARD A21
OT BE ALTERED MANUALLY ORIG. SHEET SIZE: A3 EXCEL FILE:
2436-4107 SHT 04
REMARKS
RATING
Calculated Value
Calculated Value
Calculated Value
Calculated Value
Calculated Value
Calculated Value
Calculated Value
Calculated Value
Assumed Value
Assumed Value
Assumed Value
Assumed Value
0.
0.
kvar
QP CONTRACT No. GTC 07/106/ED
S STATION A21 INTERCONNECTING
LIST
ION BOARD A21-DB-002)
EXCEL FILE: REV.
OF 05 B
001