Project: Qubaishi, B+G+M+7+R, Resi - Building: S. NO Description Status Remarks

This document provides a status update for the electrical, drainage, and water supply works on a residential building project in Qubaishi with 7 floors and multiple apartments. For the electrical works, the shop drawings were approved but the LV room, cable work, DB dressing, and inspections are not complete. The drainage shop drawings are done but final connections and as-built drawings are outstanding. For water supply, the shop drawings were approved but the meter cabinets and main meter cabinet are not installed, inspections were not done, and as-built drawings are missing.

Uploaded by

Arul Sankaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views1 page

Project: Qubaishi, B+G+M+7+R, Resi - Building: S. NO Description Status Remarks

This document provides a status update for the electrical, drainage, and water supply works on a residential building project in Qubaishi with 7 floors and multiple apartments. For the electrical works, the shop drawings were approved but the LV room, cable work, DB dressing, and inspections are not complete. The drainage shop drawings are done but final connections and as-built drawings are outstanding. For water supply, the shop drawings were approved but the meter cabinets and main meter cabinet are not installed, inspections were not done, and as-built drawings are missing.

Uploaded by

Arul Sankaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT: QUBAISHI, B+G+M+7+R, RESI.

BUILDING

S.
DESCRIPTION STATUS REMARKS
NO

1. ELECTRICAL WORKS
a)Electrical Shop Drawing Approved

b)DEWA LV Approval Done Substation not required

c)LV Room Work Not Completed MDB ,CB not fixed

d)Cable From MDB to SMDBs Not Done

e) DB Dressing Not Completed Ground & Corr.Balance

f) LV Inspection Not Done Work not completed

g)As Build Drawing Not Submitted

2. DRAINAGE WORKS
a)Drainage Shop Drawing Done

b)F.I.C Final Connection Not Done

c) As Build Drawing Not Submitted

3. WATER SUPPLY WORKS


a)Water supply Shop Drawing Approved

b)Water Meter Cabinet Not Completed Grd ,7 ,Gym flr Balance

c)Main Meter Cabinet Not Done

d)DEWA Inspection Not Done

e)As Build Drawing Not Done