INSPECTION & TEST PLAN
PROJECT NAME & DETAILS
REF. NO.
REV. NO. 0
DATE :
PAGE : 1 OF 1
ACTIVITY: MV power cable and accessories Installation
AREA/LOCATION:
ITP approved by CONTRACTOR's QA/QC: ITP approved by consultant:
Signature: Signature:
Date: Date:
INSPECTION LEVEL
SERIAL NO. DESCRIPTION FREQUENCY SPECIFICATION / CRITERIA VERIFICATION RECORD
ITL CONTRACTOR consultant
1 DOCUMENTATION
1.1 Shop Drawing Approval Each Shop Drawing Project specifications & drawings. -- R R
Each MAR ( prior to
1.2 Material Approval Project specifications & drawings. -- H H
order the material).
Once (Approval prior to
1.3 Method Statement Approval Project specifications & drawings. -- H H
start of activity)
2 MATERIAL INSPECTION
2.1 Check the Material as per approved submittal. Each Delivery Project specifications & drawings. -- H H
3 INSTALLATION INSPECTION
Check the installation as per approved drawing. Check Area / Room Wise or As
3.1 Project specifications & drawings. -- H H
the physical Installation of equipment. instructed by consultant.
LEGEND: H: HOLD W: WITNESS S: SURVEILLANCE R: REVIEW
ITP Sign-Off post completion of Works
CONTRACTOR APPROVAL consultant APPROVAL
NAME : NAME :
SIGN : SIGN :
DATE: DATE:
PAGE 1 of 1