CHIZHANJE HOUSING DEVELOPMENT
ROAD AND STORMWATER DRAINAGE
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
$
1 Site Clearance
1.1 Clear road reserve width and other areas as directed by the
Engineer, of all grass, roots, weeds and rubbish and leave site in a
neat and tidy condition on completion of the Contract. 35.00 ha 0.00
1.2 Remove trees and stumps girth 1m-2m including grubbing up
roots to a depth of 600mm below ground level. Girth measured
measured 1.0m above ground level. 10.00 No. 0.00
1.3 Ditto Girth 2-3m 5.00 No. 0.00
TOTAL CARRIED TO SUMMARY 0.00
2 Earthworks
2.1 Remove topsoil (average thickness 150mm) from areas of
from areas of roadworks. Allow for disposalof soil adjacent 203,000.00 m2 0.00
to construction or as shown on [Link] for spreading
and levelling.
2.2 Excavate anthills spread and level adjacent to roads or on site as directed 100.00 m3 0.00
2.3 Apply termite poison as specified at a rate specified by the manufacturer
and as directed. 100.00 Litre 0.00
2.4 After completion of the above steps, form up roadway including
junctions and vee drains to ruling grades and cross sections as all
specified and shown on the drawings. 203,000.00 m2 0.00
2.5 Extra Over for excavation in hard material and cart off site to a tip provided
by the contractor 100.00 m3 0.00
2.6 Extra Over for rock 400.00 m3 0.00
2.7 On completion of formation in fill scarify, shape, water and compact
the sub-grade to a depth of 150mm and not less than 90%.
AASHTO density. Measured on sub-grade width, as shown 203,000.00 m2 0.00
on the drawings.
2.8 FILLING
Filling with materials from excavation/stockpiles compacted to 95%
Mod AASHTO
(i) Making up levels 48,000.00 m3 0.00
TOTAL CARRIED TO SUMMARY 0.00
CHIZHANJE HOUSING DEVELOPMENT
CHIZHANJE HOUSING DEVELOPMENT
ROAD AND STORMWATER DRAINAGE
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
Pavement Construction
3.0 Provide, load, haul, place, spread water , mix and compact to
95% Mod. AASHTO density approved sub-base material in a layer
150mm thick roads as shown on drawings. 25,882.50 m3 0.00
3.1 Provide, load, haul, place, spread water , mix and compact to
98% Mod. AASHTO density approved Base material in a layer
150mm thick roads as shown on drawings. 25,882.50 m3 0.00
CARRIED TO SUMMARY 0.00
Bituminous Surfacing
4 Supply all materials and apply prime coat as specified to base course
at a rate of application of 0.80l/m2 105,411.20 l 0.00
4.1 Variation in rate of application of prime. RO litre
4.2 Supply all materials, heat, mix, lay and compact 25mm
thick bituminous concrete wearing course all as specified, using
80/100 penetration bitumen content of 6% of the total weight RO m2
of premix.
4.3 Variation in bitumen content. RO litre
4.4 Supply all materials and equipment for and apply double seal
spray and chip surfacing to roads using the following materials
and rate of application. Include for brooming off surplus stone
so that no place is layered more than one stone thick and only
negligible "windows" are left. Roll the stone while the binder is
warm with flat and pneumatic roller
4.4.1 Spray 150/70 penetration grade black bitumen tack at 1.05l/m2 132,000.00 m2 0.00
4.4.2 13,2mm Aggregate at 90m2/m3 132,000.00 m2 0.00
4.4.3 Spray 150/70 penetration grade black bitumen seal coat at 0.9l/m2 132,000.00 m2 0.00
4.4.4 6,7mm Aggregate at 140m2/m3 132,000.00 m2 0.00
4.4.5 Variation in rate of application of 150/70 penetration grade RO l
bitumen tack coat
4.4.6 Variation in rate of application of 13,2mm aggregate RO m3
4.4.7 Variation in rate of application of 6,7mm aggregate RO m3
TOTAL CARRIED TO SUMMARY 0.00
CHIZHANJE HOUSING DEVELOPMENT
CHIZHANJE HOUSING DEVELOPMENT
ROAD AND STORMWATER DRAINAGE
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
Stormwater Drainage
5 EARTHWORKS
5.1 Excavate to stockpile the following:
5.1.1 Vee Drain 5,990.00 m3 0.00
(a) Extra over for excavating and breaking down material in:
(i) Hard rock 119.80 m3 0.00
(ii) Boulder excavation 59.90 m3 0.00
5.1.2 Trapezoidal drain 2,800.00 m3 0.00
(a) Extra over for excavating and breaking down material in:
(i) Hard rock 56.00 m3 0.00
(ii) Boulder excavation 28.00 m3 0.00
5.1.3 Compaction
(i) Compact bottom and sides of trapzoidal drain with 3 number 11,440.00 m2 0.00
passes of a 500Kg roller
5.1.4 Concrete
(i) 25MPa concrete in lining to trapezoidal drain including all
formwork, 100 mesh reinforcement, shaping, butt joints every
3m and tie in to drains and structures R.O m3
5.1.5 Excavate for stormwater pipe drains and culverts as detailed on drawings
Spoil tobe spread on site as directed. Common excavation. 750.00 m3 0.00
5.1.6 Supply, lay and joint class "S" concrete culvert pipes with
"OGEEE" joints, including concrete bed and haunch and
backfill and compact to 90%Mod. AASHTO density in the
following diameter:-
(i) 600mm diameter 475.00 m 0.00
(ii) 750mm diameter 200.00 m 0.00
(iii) 900mm diameter 156.00 m 0.00
TOTAL CARRIED FORWARD 0.00
CHIZHANJE HOUSING DEVELOPMENT
CHIZHANJE HOUSING DEVELOPMENT
ROAD AND STORMWATER DRAINAGE
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
TOTAL CARRIED TO SUMMARY 0.00
5.2 Supply all materials and shutters and construct 20 Mpa concrete
headwalls and aprons all in accordance with drawings.
Wood Float Finish.
(i) Headwall for 600mm Pipe 60.00 No 0.00
(ii) Headwall for 750mm Pipe 52.00 No 0.00
(iii) Headwall for 900mm Pipe 22.00 No 0.00
(iv) Headwall for 1050mm Pipe 8.00 No 0.00
TOTAL CARRIED TO SUMMARY 0.00
CHIZHANJE HOUSING DEVELOPMENT
CHIZHANJE HOUSING DEVELOPMENT
ROAD AND STORMWATER DRAINAGE
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
6 Miscellaneous
6.1 Supply, and lay precast concrete roll over kerb H10 mountable kerbing
as deatailed on drawings including bed and backing, jointing and backfilling
behind kerb 1,050.00 m 0.00
6.2 Supply all materials and paint white road
traffic lines 100mm wide to roads as
directed by the Engineer.
(i) White paint 4,000.00 m 0.00
(ii) Yellow paint 40,000.00 m 0.00
6.3 Supply all materials and paint STOP and
GIVE WAY marking to roads as directed by
the Engineer. 95.00 No. 0.00
6.4 Provide and erect complete the following
traffic signs
(i) Give way signs 58.00 No. 0.00
(ii) Stop signs 37.00 No. 0.00
(iii) Left Hand Bend R.O No.
(iv) Right Hand Bend R.O No.
6.5 Supply, lay and joint class 'S' concrete culvert
pipes with OGEE joints on 100mm bed of SSG
material to stand entrance in the following
diameters
(i) 375mm R.O No.
(ii) 450mm R.O No.
6.6 Supply all materials and construct brick
headwalls 115mm thick with sand cement
rendering to stand entrance culverts
including concrete footings all as shown on
the drawings. R.O No.
6.7 Provide approved fill to stand entrance
culverts and compact to 90% Mod AASHTO R.O m3
density all as shown on the drawings.
TOTAL CARRIED FORWARD 0.00
CHIZHANJE HOUSING DEVELOPMENT
CHIZHANJE HOUSING DEVELOPMENT
ROAD AND STORMWATER DRAINAGE
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
TOTAL BROUGHT FORWARD 0.00
6.8 GUARDRAILS
6.8.1 Guardrails on Posts
(i) Galvanised straight R.O m
(ii) Painted straight R.O m
6.9 Extra-over for horizontally curved guardrails factory-bent to a
radius of less than 150 m R.O m
6.10 End Units
(i) End wings R.O no
6.11 Provision of retro-reflective beads R.O Kg
6.12 Reflective road studs R.O No.
TOTAL CARRIED TO SUMMARY 0.00
CHIZHANJE HOUSING DEVELOPMENT
CHIZHANJE HOUSING DEVELOPMENT
ROAD AND STORMWATER DRAINAGE
ITEM DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
PRELIMINARY AND GENERALS
SITE CLEARANCE 0.00
EARTHWORKS 0.00
PAVEMENT CONSTRUCTION 0.00
BITUMINOUS SURFACING 0.00
STORMWATER DRAINAGE 0.00
MISCELLANEOUS 0.00
SUB TOTAL 0.00
CHIZHANJE HOUSING DEVELOPMENT
CHIZHANJE HOUSING DEVELOPMENT
ROAD AND STORMWATER DRAINAGE
Total Measured Work -
Add: Preliminary and generals -
Sub-Total 1 -
Add 10% Contingency -
Total Excluding VAT. -
Add: VAT @15% -
Total Estimate Including VAT -