0% found this document useful (0 votes)
85 views7 pages

CPRI Cable and Combiner Installation Guide

The document is a wireless quality acceptance report for a site installation with the following key details: - The project code is 56A02SE and the site ID is HWY0263. - Tasks to be executed include boards installation, routing, cabinet and signal cables installation, grounding, antenna RRU installation and weatherproofing, and combiner installation. - Photos were collected to document that the installation and configuration of equipment was completed according to standard operating procedures.

Uploaded by

Hasnain Arshad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views7 pages

CPRI Cable and Combiner Installation Guide

The document is a wireless quality acceptance report for a site installation with the following key details: - The project code is 56A02SE and the site ID is HWY0263. - Tasks to be executed include boards installation, routing, cabinet and signal cables installation, grounding, antenna RRU installation and weatherproofing, and combiner installation. - Photos were collected to document that the installation and configuration of equipment was completed according to standard operating procedures.

Uploaded by

Hasnain Arshad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Wireless Quality Accep

Project Code: 56A02SE  Site ID:

Subcontractor: Netkom DU ID:

Business Type: QC-TE DU Region:

Submitted By: nk_shahzadhussain Approver:

Task Status: To Be Excueted

KCP/Group Item

Boards installation Components & boards/ Cards level cross verfiaction

Boards installation All installed TE equipment

Boards installation DCDU Installation /RRU connections with DCDU

Routing routing & termination /"The routing inside cabinet

Routing All alarm cables connection & labels

Routing CPRI cable laying

Routing The CPRI cable, PGND and RRU Power cable routing

The signal (Trasnmission and CPRI etc), Power &


Cabinet and Signal cables
CPRI Cables installation
The signal (Trasnmission and CPRI etc) spereration
Cabinet and Signal cables
from power cable

Cabinet and Signal cables The Cabinet cable inlets check

Power & Grounding cables should be installed as per


Grounding
standard specification

Grounding "Power cables and grounding termination

Grounding RRU Power grounding

Grounding All Equipment grounding

Grounding The Grounding connection /RRU Grounding

Antenna RRU Installation and


Mount , bolts, checknuts/ Antenna Mount Side Tilt
weathering/Combiner
Antenna RRU Installation and
The Weather proofing of RF jumper
weathering/Combiner
Antenna RRU Installation and Discarded cable ties, screws, labels, cables and site
weathering/Combiner should be neat and clean
Antenna RRU Installation and
Combiner/Filter installation
weathering/Combiner
eless Quality Acceptance Report
HWY0263 Site Name:
HWY0263_4T6S_NEW_K DU Name:
North Task ID:

RDOC Date:

Severity Level Item Remark Output Name

Onsite photos

ON SITE PHOTO

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos

Onsite photos
Onsite photos

Onsite photos

Onsite photos
HWY0263

HWY0263

NSTC0C3J2C

9/30/2020

Collected Data

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP

As Per SOP
As Per SOP

As Per SOP

As Per SOP
56A02
SE 