0% found this document useful (0 votes)
354 views4 pages

MEP Services Proposal for Hotel Project

Advance Building Construction Company has provided a quotation to AL Khidma for the supply and installation of MEP services for the MCGETTIGANS DUXIT THANI HOTEL in Abu Dhabi. The proposal includes the scope of work, price of AED 220,000, payment terms to be agreed upon, price validity of 30 days, lump sum contract basis, and excluded works. Site facilities such as offices, storage, electricity, and permits will also be required.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Project Execution,
  • HVAC System,
  • Construction Tender,
  • Advance Building,
  • Project Timeline,
  • Client Requirements,
  • Telecom System,
  • Abu Dhabi Project,
  • Construction Compliance,
  • Construction Company
0% found this document useful (0 votes)
354 views4 pages

MEP Services Proposal for Hotel Project

Advance Building Construction Company has provided a quotation to AL Khidma for the supply and installation of MEP services for the MCGETTIGANS DUXIT THANI HOTEL in Abu Dhabi. The proposal includes the scope of work, price of AED 220,000, payment terms to be agreed upon, price validity of 30 days, lump sum contract basis, and excluded works. Site facilities such as offices, storage, electricity, and permits will also be required.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Project Execution,
  • HVAC System,
  • Construction Tender,
  • Advance Building,
  • Project Timeline,
  • Client Requirements,
  • Telecom System,
  • Abu Dhabi Project,
  • Construction Compliance,
  • Construction Company

Advance Building

Construction Company

 QUOTATION 

Ref No.: (ABC/ALK/MEP2020)                 DATE: 27/04/2020 
M/s. AL Khidma. 
Attn: Rochelle Diviagracia  
Subject:  Proposal Supply & Installation of MEP Services. 
Project:  MCGETTIGANS DUXIT THANI HOTEL, ABU DHABI

Dear Sir, 

We thank you for your interest shown to our company for the execution of services referenced 
above. 

We are pleased to submit our offer, enclosed. Hoping that our offer shall be in line with your 
requirements, we remain at your disposal for any further information or clarification that you 
may require. 

Best Regards 

Sumaira Irfan 
Contracts & Proposals 

PRO‐F‐02 Rev 01
UAE Qatar
TEL +971 6 745 1373 TEL +974 4 442 9897 Website [Link]
Fax +971 6 745 1372 Fax +974 4 442 9893 E-mail info@[Link]
[Link] 3151 Ajman-UAE [Link] 20186 Doha-Qatar
Advance Building
Construction Company

I. TECHNICAL SPECIFICATIONS

1.1 Tender Documents

Our proposal based on the following tender documents: 

 MEP Drawings
 Bill of Quantities

1.2 Scope of work 

 Supply & Installation of HVAC System as per drawings.
 Supply & Installation of Drainage System as per BOQ.
 Supply & Installation of Firefighting System as per drawings.
 Supply & Installation of Electrical Power System as per drawings.
 Supply & Installation of Lighting System as per drawings.
 Supply & Installation of Fire alarm and Emergency lighting Systems as per
drawings.
 Supply & Installation of Telecom System as per drawings.
 Supply & Installation of TV as per drawings

II. COMMERCIAL SPECIFICATIONS
2.1 Price:

System Price (AED)


Supply & Installation of MEP Works 220,000.00
Total Price (AED) 220,000.00

(Two Hundred Twenty Thousand Dirham only)

PRO‐F‐02 Rev 01
UAE Qatar
TEL +971 6 745 1373 TEL +974 4 442 9897 Website [Link]
Fax +971 6 745 1372 Fax +974 4 442 9893 E-mail info@[Link]
[Link] 3151 Ajman-UAE [Link] 20186 Doha-Qatar
Advance Building
Construction Company

2.2 Payment terms  
‐to be agreed   

2.3 Price validity time 
Our prices are valid till 30 Days from this quotation date. 

2.4 Type of Contract 
Our proposal is on a Lump sum basis in accordance with the tender documents. 

2.5 Variation 
All works not included in the Drawings & BOQ mentioned above or any change in quantities 
will be considered as extra works. 

III‐ EXCLUDED WORKS 
 Value added tax (VAT) or any other taxes
 Any kind of civil works
 Protective and decorative painting.
 Fire sealant.
 Wall openings and coring.
 Scaffolding
 Disposal of rubbish and redundant materials
 Any work related to kitchen hood
 Supply of Lights
 Supply of External Signage Lights
 Supply of AV System
 Supply of Dimming control System 

PRO‐F‐02 Rev 01
UAE Qatar
TEL +971 6 745 1373 TEL +974 4 442 9897 Website [Link]
Fax +971 6 745 1372 Fax +974 4 442 9893 E-mail info@[Link]
[Link] 3151 Ajman-UAE [Link] 20186 Doha-Qatar
Advance Building
Construction Company

 Supply any kind of sanitary ware, accessories, angle valves, and bottle trap & flexible pipe.
 Factory witnessed tested for the Equipment.
 Elevators Works.
 Incoming Power Supply Cable from ADDC, KWH Meters.
 Any Additional quantities more than the BOQ. 

IV‐ SITE FACILITIES 

We would require the following facilities arranged free of charge: 

 Site Offices.
 Store & Fabrication space, Water & Electricity required to carry out the Work.
 Permits to carry out the work as and when required to be provided by the client.

PRO‐F‐02 Rev 01
UAE Qatar
TEL +971 6 745 1373 TEL +974 4 442 9897 Website [Link]
Fax +971 6 745 1372 Fax +974 4 442 9893 E-mail info@[Link]
[Link] 3151 Ajman-UAE [Link] 20186 Doha-Qatar

You might also like