Boundary Wall
8.00 m
Top of Temporary Crane Pad covered with 1.2 m x 1.8 m x 15 cm (Thick)
RCC Block Filling with 15 x 15 x 15 cm Brick Bets
15 cm thick sand mix brick bets Water Level at Rainy Season (+5.7 M)
Bundle Anchor Post 5 nos.
7.62 m long driven Wooden Poles
Water Level at Dry Season (+2.2 M)
Draft available in dry season 2.5 m
Section Z-Z: Temporary Crane Pad
River Bed
Prepared by: Avant Logistics Ltd.
Project Name: Ghorashal Polash Urea Fertilizer Project
Drawing No.: TCP-02; Date: 12.08.2020