100% found this document useful (1 vote)
89 views1 page

Crane Pad-Model

The document describes a temporary crane pad that will be used during construction of a boundary wall. The pad will be covered with reinforced concrete blocks and sand mix brick bets. It will be anchored with bundle posts and wooden poles driven into the river bed to provide stability, especially during rainy seasons when water levels rise.

Uploaded by

shafiq_05
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
89 views1 page

Crane Pad-Model

The document describes a temporary crane pad that will be used during construction of a boundary wall. The pad will be covered with reinforced concrete blocks and sand mix brick bets. It will be anchored with bundle posts and wooden poles driven into the river bed to provide stability, especially during rainy seasons when water levels rise.

Uploaded by

shafiq_05
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Boundary Wall

8.00 m
Top of Temporary Crane Pad covered with 1.2 m x 1.8 m x 15 cm (Thick)
RCC Block Filling with 15 x 15 x 15 cm Brick Bets
15 cm thick sand mix brick bets Water Level at Rainy Season (+5.7 M)

Bundle Anchor Post 5 nos.

7.62 m long driven Wooden Poles

Water Level at Dry Season (+2.2 M)

Draft available in dry season 2.5 m

Section Z-Z: Temporary Crane Pad

River Bed

Prepared by: Avant Logistics Ltd.


Project Name: Ghorashal Polash Urea Fertilizer Project
Drawing No.: TCP-02; Date: 12.08.2020