0% found this document useful (0 votes)
1K views1 page

Test Package Documents Index List (Cover Sheet)

This document is an index list of test package documents for hydrotesting the demulsifier line system in the GC-11 area. It includes the system description, table of contents, and list of 13 documents available for review related to piping drawings, welding inspections, testing reports, and other records. Key personnel from the contractor, construction company, and client company are required to review and sign off on the document index.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Test Package Documents Index List (Cover Sheet)

This document is an index list of test package documents for hydrotesting the demulsifier line system in the GC-11 area. It includes the system description, table of contents, and list of 13 documents available for review related to piping drawings, welding inspections, testing reports, and other records. Key personnel from the contractor, construction company, and client company are required to review and sign off on the document index.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
  • Valid Visual Inspection Reports: Includes reports from visual inspections that are considered valid for the specified area.
  • NDE Reports: Lists the non-destructive examination reports according to the specified system and area.
  • P&ID (Marked-up line being tested): Indicates the process and instrumentation diagram for the specific line being tested.
  • Preservation Reports (Coating Reports): Contains preservation reports, specifically focusing on coating aspects.
  • Preservation Reports: General preservation reports related to material handling and protection.
  • Calibration Reports: Presents the calibration reports for the equipment involved in the process.
  • Post Weld Heat Treatment Report: Documents the reports related to the post weld heat treatment process.
  • Isometric/As-built Drawings: Provides isometric and as-built drawings related to the project.

Contract No 42955

TEST PACKAGE DOCUMENTS INDEX LIST Contractor CGCC


(COVER SHEET) Client KOC

PROJECT NAME BULK HANDLING FACILITIES FOR PRODUCTION CHEMICALS IN SEK,WK & NK AREAS

TEST PACKAGE NO KOC-CGC-RKZ-GC-11-HYD-003 SYSTEM NO

SYSTEM DESCRIPTION DEMULSIFIER LINE AREA GC-11

TABLE OF CONTENTS

DOCUMENTS AVAILABLE

NO DESCRIPTION Reviewed By CGCC Reviewed By Reviewed By


RKZ & Sign Construction Sign CGCC & Sign KOC & Sign

1 P&ID (Marked-up line being tested)

2 Isometric/As built Drawings

Weld Visual inspection Reports


3 (Form No-QF/42955/102-Rev
0)

4 NDE Reports status(Welding Joint Control Sheet


(Form No-QF/42955/103-Rev 0)

5 NDE Reports

6 Punch List(Form No-QF/42955/105-Rev 0)

7 Field check list for A/G Piping before hydrostatic test

8 Hydrostatic/Pneumatic/Visual/Service Test Report


(Form No-QF/42955/105-Rev 0)

9 Calibration Reports

10 Valve Test Reports

11 Water Analysis Reports

12 Coating Reports

13 support

RAKAZ CGCC KOC

Name

Signature

Date