Commissioning Service Department
Commissioning Standard Test Formats
Description: LV POWER CABLE TEST (0.231kV) Record No.:
Bay no.: Drawing ref.: Sheet: 1 of 3
Contractor: Contract no.: Substation No :
1. GENERAL DATA AND INFORMATION:
Serial .no: Manufacturer:
Type no: Designation No.
Cubicle no. Rated voltage:
Type/model Rated Current:
2. MECHANICAL CHECKS & VISUAL INSPECTION:
(As per TCS – P -105 ,Rev -1 ,Item no 3.26.1)
Item Description Checked
Yes N/
1 Inspect For Physical Damage or Defects A
Yes N/
2 Verify All Cable Connections As Per Drawing A
Yes N/
3 Check all cables and cores are labeled correctly A
Yes N/
4 Check tightness of terminals and confirm the cables are secured A
Yes N/
5 Check cable size against rating required A
Yes N/
6 Check cable entry path trench or ducts are to be properly sealed A
Yes N/
7 Check for proper cable support ,clamping trays, blocking A
Yes N/
8 Check cable bends A
Yes N/
9 Visual inspection, size and rating confirmation A
3. ELECTRICAL TESTS:
(As per TCS – P -105 ,Rev -1 ,Item no 3.26.2)
* The megger values will be tested at 1 kV megger
Phase Insulation resistance Continuity resistance checked Phasing check
R Y-B Gnd Y-B Gnd
Y R-B Gnd R-B Gnd
B Y-R Gnd Y-R Gnd
Tested by: ENG. Witnessed by: ENG.
Signature & Date: Signature & Date:
Commissioning Service Department
Commissioning Standard Test Formats
Description: LV POWER CABLE TEST (0.231kV) Record No.:
Bay no.: Drawing ref.: Sheet: 2 of 3
Contractor: Contract no.: Substation No :
Criteria:
Tested by: ENG. Witnessed by: ENG.
Signature & Date: Signature & Date:
Commissioning Service Department
Commissioning Standard Test Formats
Description: LV POWER CABLE TEST (0.231kV) Record No.:
Bay no.: Drawing ref.: Sheet: 3 of 3
Contractor: Contract no.: Substation No :
4. HIGH VOLTAGE TEST
Applied voltage= 2 K.V. Time duration =1 Min
Connected to Leakage current in mA
Injected phase
earth 15s 30s 45s 60s
R Y+b
Y B+r
B R+y
Criteria:
Tested by: ENG. Witnessed by: ENG.
Signature & Date: Signature & Date: