QC Violation Report for SA1-Nesma Project

The document is a quality inspection report from Saudi Aramco documenting a standards violation during a routine site visit of an SA1 construction project. The report notes that contractor Nesma's subcontractor Tanmia conducted material receiving at a warehouse without an approved inspector, violating schedule Q requirements. Saudi Aramco advised corrective and preventive actions. No prior or subsequent replies are documented regarding the violation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
213 views2 pages

QC Violation Report for SA1-Nesma Project

The document is a quality inspection report from Saudi Aramco documenting a standards violation during a routine site visit of an SA1 construction project. The report notes that contractor Nesma's subcontractor Tanmia conducted material receiving at a warehouse without an approved inspector, violating schedule Q requirements. Saudi Aramco advised corrective and preventive actions. No prior or subsequent replies are documented regarding the violation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

User1 :  

Alam, Mohammad Abid-Nesma |  Role : Contractor QC   | Change Password | Change Role | Logout  
 
LBE 56 Data Entry For Project {SA1-Nesma-6600038900}
                        
sethurbx
SA1-Nesma-6600
  sethurbx           
9955291
Standards Violati

*Project:SA1-Nesma-6600038900 *Contractor:Tanmia
Sub System
JO/WBS:: .
ID.:
*Degree of
Minor *Category:Standards Violation
Violation
**Project *Surveillance
Construction Phase Routine Site Visit
Phase Type:
Equipment
SA1-projects *Discipline:Mechanical
ID:
Extended
ACD:8/27/2017 NA
ACD:
On 06th Aug 2017,SA1, Contractor Nesma, Sub Contractor Tanmia, PID
representative during the surveillance of Material receiving inspection at
SDGM ware house, it has been observed that the Nesma-Sub contractor
*Description:Tanmia material receiving has been carried out without approved inspector.
Which is violating the schedule Q requirements attachment IV para 3.6.
Hence the offered materials and RFI rejected.SAPMT advise the contractor for
suitable corrective and preventive action.
Location:SDGM ware house

 
Reference Reference
Reference 1
2 3
Schedule
Q*Attachment No. -
*--- *---
Attachment IV - Para.
No. - 3.6
 

List of Repeat Violations (Inspector Shall Validate)

Saudi Aramco: Company General Use


LBE Typ Reported
Date Degree of Violation Discipline Status Escalation
# e By
No Matching Violations Found

Contractor Replies
Date Replied By Reply
No Replies

PMT Replies
Date Replied By Reply
No Replies

SAPID Replies
Date Replied By Reply
No Replies

Field Supervisor Replies


Date Replied By Reply
No Replies

Comments

500
Characters Left

  Submit

   
Click Here For Checklist    .
For Further Assistance Please Call : Ijaz Ahmed - 880 1409 / Mohammad Ahmed- 880 1578
       Inspection Department  Quality Management Information System Website- Version 4.0. RFI Process || Surveillance Process || QMIS