User1 :
Alam, Mohammad Abid-Nesma | Role : Contractor QC | Change Password | Change Role | Logout
LBE 56 Data Entry For Project {SA1-Nesma-6600038900}
sethurbx
SA1-Nesma-6600
sethurbx
9955291
Standards Violati
*Project:SA1-Nesma-6600038900 *Contractor:Tanmia
Sub System
JO/WBS:: .
ID.:
*Degree of
Minor *Category:Standards Violation
Violation
**Project *Surveillance
Construction Phase Routine Site Visit
Phase Type:
Equipment
SA1-projects *Discipline:Mechanical
ID:
Extended
ACD:8/27/2017 NA
ACD:
On 06th Aug 2017,SA1, Contractor Nesma, Sub Contractor Tanmia, PID
representative during the surveillance of Material receiving inspection at
SDGM ware house, it has been observed that the Nesma-Sub contractor
*Description:Tanmia material receiving has been carried out without approved inspector.
Which is violating the schedule Q requirements attachment IV para 3.6.
Hence the offered materials and RFI rejected.SAPMT advise the contractor for
suitable corrective and preventive action.
Location:SDGM ware house
Reference Reference
Reference 1
2 3
Schedule
Q*Attachment No. -
*--- *---
Attachment IV - Para.
No. - 3.6
List of Repeat Violations (Inspector Shall Validate)
Saudi Aramco: Company General Use
LBE Typ Reported
Date Degree of Violation Discipline Status Escalation
# e By
No Matching Violations Found
Contractor Replies
Date Replied By Reply
No Replies
PMT Replies
Date Replied By Reply
No Replies
SAPID Replies
Date Replied By Reply
No Replies
Field Supervisor Replies
Date Replied By Reply
No Replies
Comments
500
Characters Left
Submit
Click Here For Checklist .
For Further Assistance Please Call : Ijaz Ahmed - 880 1409 / Mohammad Ahmed- 880 1578
Inspection Department Quality Management Information System Website- Version 4.0. RFI Process || Surveillance Process || QMIS
Manual
Designed & Developed by Inspection Department.
Saudi Aramco: Company General Use