REQUEST DATE:
QUALITY CONTROL - WORKS INSPECTION ITEMS: Modular False Ceiling
REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt ltd G-Block
PACKAGE C&I packages
CONTRACTOR Architects Evolution
DESCRIPTION OF WORKS INSPECTION OF INSTALLATION OF MATERIALS FOR QUALITY COMPLIANCE
CONTRACT CLAUSE INSPECTION DATE
BOQ REF. NO. I-60 BY TIME
ZONE
ITEM DETAILS: Modular False Ceiling WING NO. G-Block NO.
LOCATION FOR
INSPECTION All Floor
SPACE
FLOOR NO. 3rd NO.
CHECK FOR QUALITY COMPLIANCE/ NON-CONFORMITY
Sr.No INSPECTION DETAILS Date of Inspection
ROUND 1 ROUND 2 REMARKS
1 Check for the Approved Shop drawing
2 Check for approved Make of Material
3 Check for Modular False tile size
4 Check for thickness of Modular False tile
5 Check for All the Frame work materials used as per specs
6 Check the frame is fixed over the surface
7 Check the clearance from Services Team
8 Check that the supporting of As per specification
9 Check the line.level and right angle of the Ceiling fixed
10 Check for the tile damage & Dirty
11 Check the Additional supporting for services
12 Check the provision for fixing of A/C grills & electrical fittings.
Observations if any :
Contractor/Vendor JLL Archtect/Consultant
Signature : Signature : Signature :
Name : Name : Name :
Date : Date : Date :
Page 1 of 2
REQUEST DATE:
QUALITY CONTROL - WORKS INSPECTION ITEMS: Metal Ceiling
REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt Ltd G Block
PACKAGE C&I packages
CONTRACTOR Architects Evolution
DESCRIPTION OF WORKS INSPECTION OF INSTALLATION OF MATERIALS FOR QUALITY COMPLIANCE
CONTRACT CLAUSE DATE
INSPECTION
SAND-BOQ-INT-01 - I - BY
BOQ REF. NO. TIME
65
ITEM DETAILS: Modular Metal Ceiling
WING NO. G-Block
LOCATION FOR
INSPECTION Toilet
FLOOR NO. 3rd floor AREA Coromet, Projects
CHECK FOR QUALITY COMPLIANCE/ NON-CONFORMITY
Sr.No INSPECTION DETAILS Date of Inspection
ROUND 1 ROUND 2 REMARKS
1 Check for the Approved Shop drawing
2 Check for approved Make of Material
3 Check for Modular False tile size
4 Check for thickness of Modular False tile
5 Check for All the Frame work materials used as per specs
6 Check the frame is fixed over the surface
7 Check the clearance from Services Team
8 Check that the supporting of As per specification
9 Check the line.level and right angle of the Ceiling fixed
10 Check for the tile damage & Dirty
11 Check the Additional supporting for services
12 Check the provision for fixing of A/C grills & electrical fittings.
Observations if any :
Contractor/Vendor JLL Archtect/Consultant
Signature : Signature : Signature :
Name : Name : Name :
Date : Date : Date :
Page 2 of 2