This document is a quality control inspection report for the installation of modular false ceilings and metal ceilings at the Sandvik Pvt Ltd G-Block building. It lists 12 inspection details that will be checked, including verifying approved shop drawings and materials, installation as per specifications, levelness and cleanliness. The report forms will be signed by the contractor, quality control inspector, and architect after inspection rounds to confirm quality compliance or note any non-conformities.

Uploaded by

Paras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
513 views2 pages

Quality Control - Works Inspection: Modular False Ceiling

This document is a quality control inspection report for the installation of modular false ceilings and metal ceilings at the Sandvik Pvt Ltd G-Block building. It lists 12 inspection details that will be checked, including verifying approved shop drawings and materials, installation as per specifications, levelness and cleanliness. The report forms will be signed by the contractor, quality control inspector, and architect after inspection rounds to confirm quality compliance or note any non-conformities.

Uploaded by

Paras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

REQUEST DATE:

QUALITY CONTROL - WORKS INSPECTION ITEMS: Modular False Ceiling


REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt ltd G-Block
PACKAGE C&I packages
CONTRACTOR Architects Evolution
DESCRIPTION OF WORKS INSPECTION OF INSTALLATION OF MATERIALS FOR QUALITY COMPLIANCE
CONTRACT CLAUSE INSPECTION DATE
BOQ REF. NO. I-60 BY TIME
ZONE
ITEM DETAILS: Modular False Ceiling WING NO. G-Block NO.
LOCATION FOR
INSPECTION All Floor
SPACE
FLOOR NO. 3rd NO.

CHECK FOR QUALITY COMPLIANCE/ NON-CONFORMITY


Sr.No INSPECTION DETAILS Date of Inspection
ROUND 1 ROUND 2 REMARKS
1 Check for the Approved Shop drawing

2 Check for approved Make of Material

3 Check for Modular False tile size

4 Check for thickness of Modular False tile

5 Check for All the Frame work materials used as per specs

6 Check the frame is fixed over the surface

7 Check the clearance from Services Team

8 Check that the supporting of As per specification

9 Check the line.level and right angle of the Ceiling fixed

10 Check for the tile damage & Dirty

11 Check the Additional supporting for services

12 Check the provision for fixing of A/C grills & electrical fittings.

Observations if any :

Contractor/Vendor JLL Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :

Page 1 of 2
REQUEST DATE:
QUALITY CONTROL - WORKS INSPECTION ITEMS: Metal Ceiling
REF. NO.:
TITLE OF THE PROJECT Sandvik Pvt Ltd G Block
PACKAGE C&I packages
CONTRACTOR Architects Evolution
DESCRIPTION OF WORKS INSPECTION OF INSTALLATION OF MATERIALS FOR QUALITY COMPLIANCE
CONTRACT CLAUSE DATE
INSPECTION
SAND-BOQ-INT-01 - I - BY
BOQ REF. NO. TIME
65
ITEM DETAILS: Modular Metal Ceiling
WING NO. G-Block
LOCATION FOR
INSPECTION Toilet
FLOOR NO. 3rd floor AREA Coromet, Projects

CHECK FOR QUALITY COMPLIANCE/ NON-CONFORMITY


Sr.No INSPECTION DETAILS Date of Inspection
ROUND 1 ROUND 2 REMARKS
1 Check for the Approved Shop drawing

2 Check for approved Make of Material

3 Check for Modular False tile size

4 Check for thickness of Modular False tile

5 Check for All the Frame work materials used as per specs

6 Check the frame is fixed over the surface

7 Check the clearance from Services Team

8 Check that the supporting of As per specification

9 Check the line.level and right angle of the Ceiling fixed

10 Check for the tile damage & Dirty

11 Check the Additional supporting for services

12 Check the provision for fixing of A/C grills & electrical fittings.

Observations if any :

Contractor/Vendor JLL Archtect/Consultant

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :