Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 1 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
Test Report
for
220 KV GIS OPERATION & INTERLOCK
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 2 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
W502 (AL ALMAIN-1)
Test procedure
-Achieve all conditions mentioned in oreder to release the interlock.
-opposite one condition by one to check that the switch is interlocked.
1- CIRCUIT BREAKER (Q0) CLOSE
MAINTENANCE
- Q1 OPEN
- Q2 OPEN
- Q9 OPEN
- Selector Switch (SF01) Local
- CB SF6 gas pressure stage 1 normal
- CB Spring Charged
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- Lockout Reset
- TCS Healthy
SERVICE
- Q1 CLOSE
- BB-1 PT1 Q11 CLOSED (W505A)
- BB-1 PT1 MCB CLOSED (W505A)
- Line VT MCB CLOSED
- Q9 CLOSE
- Selector Switch (SF01) Local
- CB SF6 gas pressure stage 1 normal
- CB Spring Charged
- All DS/ES in normal position (No incomplete position)
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 3 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
- No double operation from bay itself
- No double operation from other bays
- Lockout Reset
- TCS Healthy
OR
- Q2 CLOSE
- BB-2 PT2 Q21 CLOSED (W505A)
- BB-2 PT2 MCB CLOSED (W505A)
- Line VT MCB CLOSED
- Q9 CLOSE
- Selector Switch (SF01) Local
- CB SF6 gas pressure stage 1 normal
- CB Spring Charged
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- Lockout Reset
- TCS Healthy
2- CIRCUIT BREAKER (Q0) OPEN
- Selector Switch (SF01) Local
- CB SF6 gas pressure stage 2 normal
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 4 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
3- BUS BAR DISCONNECTOR (Q1) CLOSE/OPEN
MAINTENANCE
- Q31 CLOSE (W505A)
- Q52 CLOSE
- Q0 CLOSE
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
SERVICE
- Q31 OPEN (W505A)
- Q52 OPEN
- Q51 OPEN
- Q0 OPEN
- Q2 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 5 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
BUS TRANSFER
- Q31 OPEN (W505A)
- Q52 OPEN
- Q51 OPEN
- Q0 CLOSED
- Q2 CLOSED
- Q35 CLOSED (W505)
- Q45 CLOSED (W505)
- Q10 CLOSED (W505)
- Q20 CLOSED (W505)
- Q0 CLOSED (W505)
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 6 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
4- BUS BAR DISCONNECTOR (Q2) CLOSE/OPEN
MAINTENANCE
- Q41 CLOSE (W505A)
- Q51 CLOSE
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
SERVICE
- Q41 OPEN (W505A)
- Q52 OPEN
- Q51 OPEN
- Q0 OPEN
- Q1 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 7 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
BUS TRANSFER
- Q41 OPEN (W505A)
- Q52 OPEN
- Q51 OPEN
- Q0 CLOSED
- Q1 CLOSED
- Q35 CLOSED (W505)
- Q45 CLOSED (W505)
- Q10 CLOSED (W505)
- Q20 CLOSED (W505)
- Q0 CLOSED (W505)
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 8 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
5- LINE DISCONNECTOR (Q9) CLOSE/OPEN
MAINTENANCE
- Q8 CLOSE
- Q51 CLOSE
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
SERVICE
- Q8 OPEN
- Q51 OPEN
- Q52 OPEN
- Q0 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 9 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
6- EARTH SWITCH (Q51) CLOSE/OPEN
- Q1 OPEN
- Q2 OPEN
- Q9 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
7- EARTH SWITCH (Q52) CLOSE/OPEN
- Q1 OPEN
- Q2 OPEN
- Q9 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 10 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
- No Run time Exceeded for DS/ES
8- HIGH SPEED EARTH SWITCH (Q8) CLOSE/OPEN
- Q9 OPEN
- LINE VT MCB OK
- NO Voltage in Line
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
9- DISCONNECTOR (Q37) CLOSE/OPEN
- Q1 OPEN (W502)
- Q1 OPEN (W503)
- Q1 OPEN (W504)
- Q35 OPEN (W505)
- Q31 OPEN (W505A)
- Q61 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 11 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
10- DISCONNECTOR (Q47) CLOSE/OPEN
- Q2 OPEN (W502)
- Q2 OPEN (W503)
- Q2 OPEN (W504)
- Q45 OPEN (W505)
- Q41 OPEN (W505A)
- Q71 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
11- EARTH SWITCH (Q61) CLOSE/OPEN
- Q37 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 12 of 12
Vendor: Document Number:
Sieyuan
Title.
OPERATION & INTERLOCK TEST
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
12- EARTH SWITCH (Q71) CLOSE/OPEN
- Q47 OPEN
- Selector Switch (SF01) Local
- DS/ES Motor power supply MCB Closed
- DC Supervision for DS/ES Motor circuit OK
- All DS/ES in normal position (No incomplete position)
- No double operation from bay itself
- No double operation from other bays
- No Run time Exceeded for DS/ES
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date