E0001-S02-GQC-IR-02106 - ITP 4.6-Duct - 72+980
E0001-S02-GQC-IR-02106 - ITP 4.6-Duct - 72+980
E0001 – PACKAGE 2S
Railway Integration and System
E0001-FJP-GCX-DS-90017 AA Code 2
Drawing
Inspection Point Hold Point Witness Point ITP Item Number 4.6
Item to be inspected: Post Concrete Inspection (Curing, Stripping of formworks)for package 2A MV Cable Internal
Detailed description as per ITP ring (4-Way Duct), Quantity=6.01 meter
Inspection Requested By
Name Date / Time Designation Signature
Project (IR Raised By STS/
Engg.Abas Ali 02-01-2022
Engineer Subcontractor)
Survey Department
(If Applicable)
Rail Systems Interface
(if required)
STS Comments:
Comment reviewed & closed
(signature and date)
The Work Activity described here has been checked by the Contractor in accordance with Exhibit D, Part 1, Appendix 13.0, Section 6.0, where the contractor shall
plan, perform and record all QUALITY CONTROL activities to ensure that all work is performed in accordance with the QMS documentation reviewed by the
Engineer and in compliance with the requirements of the Contract.
This is to certify that the above referenced work/activity has been inspected and/or witnessed by the Engineer.
Inspection Conducted By (The Engineer’s Representative)
Name:
Approved
ITR Approval by The Engineer
Designation:
Approved With Comments
Date / Time:
Rejected
Signature:
Comments:
Declined
Reason to Decline:
The minimum quota of inspection/witness points required to be
attend by the Engineer has been exceeded, the ITR will be declined by
the Engineer
Inspection result
SN. Inspection phase description Remarks
Yes No N/A
POST POUR CHECKS
Concrete Curing by covering with wet hessian cloth & ✓
1 Plastic sheets over hessian cloths / water ponding method
/ Curing Compound. Curing adequate.
In case of water curing, curing is continuous for 14 days with ✓
2
the element fully covered or as agreed by the Customer
Construction joints are prepared as per specification and ✓
3
approved method statement.
Check for stripping of Formwork / Supports etc., after ✓
4 specified duration of stripping time. Refer ITP for stripping
time.
✓
5 Top level of concrete is correct.
All critical items (Position of MEP items, Anchor bolts etc.,) ✓
6 checked by Survey wherever applicable and found as per
drawing.
✓
7 Forms and supports are cleaned and stacked.
✓
8 Opening size if any, as per drawing.
Signature
Date 03-01-2022
UNLESS SPECIFIED OTHERWISE, THIS PRINTED COPY OF THIS DOCUMENT IS UNCONTROLLED AND FOR REFERENCE PURPOSE ONLY
E0001-S02-GQC-WX-00009-00 Page 1 of 1
INSPECTION AND TEST PLAN FOR SUBSTRUCTURE
CONCRETE WORKS FOR FOUNDATION
Closed NCRs
5 NCR closeout (if applicable) Ensure that all the NCRs are closed. As per NCR Procedure Each NCR H H R
NCR Log
UNLESS SPECIFIED OTHERWISE, THIS PRINTED COPY OF THIS DOCUMENT IS UNCONTROLLED AND FOR REFERENCE PURPOSE ONLY
E0001-S02-GQA-PN-00002-00 PAGE 12 OF 14
1 2 3 4 5 6 7 8
CA
OP
E LO R
BL ELTE
10M DE SH
INSI
AT
B
ED
OS E NO
OP CABL N -1
PR IO
AT
11KV IN TR
Y
RM
TE E EN
BL
CA
11kV
6.0
9m C
A
KH
E BARA
BL
CA ISS
1
m
0sq.m U/G 7 TO
kV
R#
0.5
.
x 15 . 11 TE
3C AL
PE SHEL
XL
OM m
FR
sq.m E
14
x 50 BL
3C G CA 7
ED kV U/ 6 TO
OS #
OP AL. 11 TER
PR
PE SHEL
XL
1m
OM
0m
FR
4W
0.5
D
0m
0m
1.5
B
2W B
0m
1.5
D
EGL:1.63
PROPOSED MV CABLE JOINT-20 FGL:4.45
E=625139.342 TOC:1.48
N=2648537.915 E=625629.269
N=2648774.8
EGL:1.63
FGL:4.45
SHELTER GMA-07 TOC:1.48
E=625631.788
ENLARGED VIEW 1 N=2648769.349
C C
L=24.443m-W=44.720m-S=90°
REFER TO ENLARGED
GMA_CUL_72+600
DETAIL-2
EGL:1.486 EGL:1.576 EGL:1.706
EGL:1.858 EGL:1.348 EGL:1.466 EGL:1.386 EGL:1.612 EGL:1.669
EGL:2.398 EGL:2.378 EGL:2.077 E:625296.325 E:625406.817 E:625560.973
E:625142.320 E:625187.173 E:625241.787 E:625348.528 E:625456.780 E:625506.375
E:625006.247 E:625051.480 E:625095.430 N:2648611.900 N:2648663.335 N:2648735.325
N:2648560.420 N:2648636.045 N:2648686.666 B
10M CABLE LOOP AT
14.19m
INSIDE SHELTER
N:2648586.751 N:2648709.818
PROPOSED
N:2648538.770
11KV CABLE
TERMINATION -1NO
PROPOSED 3C x 50 sq.mm
XLPE AL. 11kV U/G CABLE
FROM SHELTER # 6 TO 7
B
C C
0.50m
A
6.01m
4W
2W
0.50m
1.50m 1.50m
D
D D
EGL:1.66 EGL:1.58
FGL:1.862 FGL:1.862
72+300
72+400
72+500
72+600
72+700
72+800
72+900
73+000
TOC:1.362 TOC:1.362
E=625630.06
SEE ENLARGED
E=625617.216
N=2648761.594 N=2648767.624 VIEW 1
E E
GRADE LEVEL
GRADE LEVEL
SELECTED BACK
FILL MATERIAL
SHELTER 9
GORUND LEVEL PROPOSED
PACKAGE UNIT
(VARIES AS PER SITE CONDITION)
TERMINATION -1NO
F F
B
11kV CABLE ENTRY
MIN. 900
300
5-16mm Ø TOP & BOTTOM
STEEL REINFORCEMENT
5-16mm Ø TOP & BOTTOM
STEEL REINFORCEMENT
600
WARNING TAPES
1400
STIRRUPS Ø 8 @200
1700
B
RMU
850
STIRRUPS Ø 8 @200 50 3C x 150 sq.mm
75
1000
250
150
FROM SHELTER # 6 TO 7
100
PROJECT
LEGEND: REFERENCE DRAWING : E0001-S02-EGE-DG-30053-AB 11KV CABLE LAYOUT Rev. Date CO Revision Description Drwn Vrfr Appr Atzr
PREPARED
ETIHAD RAIL STAGE 2 & 3 PROJECT DRAWING TITLE
PROPOSED MV CABLE ROUTE LINESIDE ACCESS ROAD DATE 06-DEC-2021 Design & Build Contract LAYOUT FROM SHELTER GMA-06 TO GMA-07
H SHELTER LEVEL REFERENCE DRAWING:E0001-S02-EAS-DG-30051-AB AA 27-JUL-2021 -- FIRST REVSION ISSUED FOR APPROVAL (VER 00.00) HE MI DT AA
VERIFIED
(Railway Integration and Systems)
PR. REINFORCED ROAD CROSSING DUCT RIGHT OF WAY PACKAGE-2A
RUWAIS
A.ELGOHARY
PROPOSED UTILITY PROTECTION EXISTING FENCE ABBREVIATIONS: NOTE: AB 08-DEC-2021 -- ISSUED FOR APPROVAL(VER 01.00) HE MI DT AA
DATE 06-DEC-2021
CLIENT PMC SHEET No SCALE ORIGINAL SIZE