Dismantling Rates for Sayanam Hostel

The document provides a breakdown of costs for repairs and renovations at the Sayanam Hostel in TSIRD Rajendranagar. It lists various construction activities like dismantling, brick masonry, concrete work, stone work, and roof tiling. Rate estimates are given per unit for materials, labor, and overhead/contractor profits for each activity. The total estimated rates per unit are also provided rounded to the nearest rupee.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
333 views2 pages

Dismantling Rates for Sayanam Hostel

The document provides a breakdown of costs for repairs and renovations at the Sayanam Hostel in TSIRD Rajendranagar. It lists various construction activities like dismantling, brick masonry, concrete work, stone work, and roof tiling. Rate estimates are given per unit for materials, labor, and overhead/contractor profits for each activity. The total estimated rates per unit are also provided rounded to the nearest rupee.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Dismantling Data SSR 2020-21

Repairs and Renovation of Sayanam Hostel, TSIRD Rajendranagar.


Amount
Sl. No. Description Quantity Rate (Rs.) Per Unit Unit
(Rs.)
1 Dismantling, clearing away and carefully stacking useful materials for re-use
and disposal of unserviceable materials with 100m lead as directed by Executive
Engineer duly taking actual premeasurements before dismantling including all
labour charges , overheads & contractor profit etc., complete

Brick masonry
(BLD-CSTN-14-9/299)
Mazdoor(unskilled) 0.409 465.00 1 Each 190.19
Add for MA @ 40% 0.40 190.19 76.07
Rate per 1 cum 266.26
Overheads&Contractors Profit @
13.615% 0.13615 266.26 36.25
Rate per 1 cum 302.51
say 303

Unreinforced cement concrete up to 15cm thickness


(BLD-CSTN-14-8/296)
Mazdoor(unskilled) 2.44 465.00 1 Each 1134.60
Add for MA @ 40% 0.40 1134.60 453.84
Rate per 1 cum 1588.44
Overheads&Contractors Profit @
13.615% 0.13615 1588.44 216.27
Rate per 1 cum 1804.71
say 1805

Unreinforced cement concrete more than 15cm thickness


(BLD-CSTN-14-8/297)
Mazdoor(unskilled) 4.88 465.00 1 Each 2269.20
Add for MA @ 40% 0.40 2269.20 907.68
Rate per 1 cum 3176.88
Overheads&Contractors Profit @
13.615% 0.13615 3176.88 432.53
Rate per 1 cum 3609.41
say 3609

Reinforced cement concrete


(BLD-CSTN-14-8/298)
Mazdoor(unskilled) 4.32 465.00 1 Each 2008.80
Add for MA @ 40% 0.40 2008.80 803.52
for cutting steel bars (BLD-CSTN-14-
10/300)
Blacksmith 2nd class 0.50 490.00 1 Each 245.00
Mazdoor(Male) 0.50 465.00 1 Each 232.50
Add for MA @ 40% 0.40 477.50 191.00
Rate per 1 cum 3480.82
Overheads&Contractors Profit @
13.615% 0.13615 3480.82 473.91
Rate per 1 cum 3954.73
say 3955

Kadapa slabs or shahabad stone slabs on sand bed


Rate as per SSR 10.00 8.00 1 sqm 80.00
Add for MA @ 40% 0.40 80.00 32.00
Rate per 10 sqm 112.00
Rate per 1 sqm 11.20
Overheads&Contractors Profit @
11.20
13.615% 0.13615 1.52
Rate per 1 sqm 12.72
say 13

Stone masonry in cement mortar


Rate as per SSR 1.00 485.00 1 cum 485.00
Add for MA @ 40% 0.40 485.00 194.00
Rate per 1 cum 679.00
Overheads&Contractors Profit @
679.00
13.615% 0.13615 92.45
Rate per 1 cum 771.45
say 771

Pan tiled or Mangalore tiled roof with out roof timbers :


Rate as per SSR 10.00 16.00 1 sqm 160.00
Add for MA @ 40% 0.40 160.00 64.00
Rate per 10 sqm 224.00
Rate per 1 sqm 22.40
Overheads &Contractors Profit @
0.13615 22.40
13.615% 3.05
Rate per 1 sqm 25.45
say 25.45