HRSG Erection summary wbs shree 28-May-11 13:17
HRSG Erection
A1050
Platform
A1150
Bank Ducting Erection and Insulation
A1000 A1010 A1020 A1030 A1080 A1120 A1160 A1170
Foundation Takeover Foundation Preparation Bottom Plate, Column & Beam Side Casing Drum, Lines & Links and Riser Tubes Drains, Vents and Safety Valves Hydro Test Insulation of Pipes and Drums
A1040 A1140 A1190 A1200
Module Safety Valve Escape Piping Alkali Boil Out (ABO) Safety Valve Floating (SVF)
A1060 A1110 A1130 A1180
Inlet / Outlet Duct Roof Structure and Silencer Roof Sheeting BOT Casing Insulation
A1090 A1100
Top & Bottom Casing Top Casing Insulation
A1070
Duct Insulation
Activity ID
Work Products and
Page 1 of 2
Documents
Activity Name
© Oracle Corporation
HRSG Erection summary wbs shree 28-May-11 13:17
HRSG Erection
Activity ID
Work Products and
Page 2 of 2
Documents
Activity Name
© Oracle Corporation