Base Shear Calculation
Design Horizontal Seismic Coefficient Calculation
i. Time period calculation
We have, from IS 1893 (Part 1): 2002 Cl. 7.6.2,
0.09h
Ta =
√d
where,
h = Height of the building in m.
d = Base dimension of the building at the plinth level.
Here,
h = 9.525 m
Along X-direction,
d = 8.23m
Thus,
0.09*9.525
Tax = = 0.298 sec
√8.2300
Along Y-direction,
d = 7.92 m
Thus,
0.09*9.525
Tay = = 0.304 sec
√7.92
ii. Average response acceleration coefficient calculation
For medium soil sites, we have, from IS 1893 (Part 1): 2002 Cl. 6.4.5,
Along X-direction,
For Tax = 0.298
Sa
sec, =2.50
g
Along Y-direction,
For Tay =0.304sec,
Sa
=2.50
g
iii. Zone factor
From IS 1893 (Part 1): 2002 Table 2, for seismic zone V, we have,
Z = 0.36
iv. Importance factor
From IS 1893 (Part 1): 2002 Table 6,
I=1
v. Response reduction factor
From IS 1893 (Part 1): 2002 Table 7, for special RC moment-resisting
frame (SMRF)
R = 5.0
Now,
Z I Sa
Design horizontal seismic coefficient, Ah = 2 R G
Along X-direction,
Putting the respective values, we get,
0.36* 1*2.50
Ahx = = 0.135
2 *5
Similarly,
Along Y-direction,
Putting the respective values, we get,
0.36* 1.5*2.50
Ahy = = 0.135
2 *5
Base Shear Calculation
As per IS 1893 (Part 1) : 2002 Cl. 7.5.3, the total lateral force or design seismic
base shear is given by,
VB = Ah*W
Where,
W= Seismic weight of the building = 2194.066 KN
Along X-direction,
VBx = Ahx*W
= 0.135*2194.066
= 296.19 KN
Along Y-direction,
VBy = Ahy*W
= 0.135*2194.066
= 296.19 KN