701 - Retaining Wall Schedule and Details

The document describes the construction details for a retaining wall. It includes details for dowels spaced every 400mm on one side and greased with an expansion cap. It also describes using impervious fill, fabric flaps, weep holes at 1500mm offsets, and a form liner with a rubble stone pattern.

Uploaded by

diether micla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
369 views1 page

701 - Retaining Wall Schedule and Details

The document describes the construction details for a retaining wall. It includes details for dowels spaced every 400mm on one side and greased with an expansion cap. It also describes using impervious fill, fabric flaps, weep holes at 1500mm offsets, and a form liner with a rubble stone pattern.

Uploaded by

diether micla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

2

016x750 LG DOWEL
/ /
016x750LG DOWEL
MAX 1 @400 OC, ONE SIDE @400 OC, ONE SIDE
FINISH GRADE CHAMFER 20
GREASED w/ EXP CAP GREASED w/ EXP CAP

60
BATTER 12 (TYP) W1 (SOLID SODDING)
EARTH SIDE

0
SIM 100
TRENCH INDUCED CRACK
(TYP)
SEE CIVIL DWG PREFORMED

13
ELASTOMERIC
EARTH SIDE

T
JOINT FILLER
IMPERVIOUS FILL

20

T
T/4
CHAMFER 20 EARTH SIDE
PAINT & OIL DOWEL

150
20 25 20
NFSM PAINT &

T/4
FABRIC FLAP 25 PREFORMED OIL DOWEL w= 4mm TOOLED
/
050 WEEP HOLES SEALANT REBARS
ELASTOMERIC STRIP w/SEALANT
@ 1500 OC 4
JOINT FILLER 25 PREFORMED SEALANT
OFFSET BY 750 ELASTOMERIC
(MAX @ 30 M.) JOINT FILLER (MAX @ 7.5 M.)
FILTER FABRIC
FORM LINER RUBBLE
STONE PATTERN
EXPANSION JOINT DETAILS CONTRACTION JOINT DETAILS
(SEE CIVIL DWG FOR 3 NOT TO SCALE
4 NOT TO SCALE
PATTERN DETAIL) SATISFACTORY
FILL

40 50 NOTES :

CL CL
1. DESIGN PARAMETERS:
COMPOSITE DRAIN CORE PERFORATED
DRAIN CORE IN THE WEEP HOLE AREAS 1.1 ANGLE OF INTERNAL FRICTION OF
PER SPECIFICATION
BACKFILL MATERIAL ------------------- = 32°

Hw
/
050 WEEP HOLES RETAINING WALL SIZES 1.2 COEFFICIENT OF FRICTION ------------ = 0.45
@ 1500 OC
OFFSET BY 750 b5
1.3 SOIL ALLOWABLE BEARING PRESSURE --- = 125 kPa
BASE FOOTING, (M) STEM WALL (mm) KEY (mm)
WALL HEIGHT
1.4 MAXIMUM SLOPE BACKFILL ------------ = 2:1
b4 NATURAL TYPE Hw, (M)
SUBGRADE
A B C T1 W1 W2 D1 T2
b2 2. WHEN WORKING WITHIN OR ADJACENT TO EXISTING
b3 STRUCTURE, CONTRACTOR SHALL EMPLOY APPROPRIATE
1a UP TO 1.50 0.5 0.8 1.3 0.30 300 300 - - EARTH RETENTION SYSTEM (SUCH AS PILING) NOT TO
450

SATISFACTORY IMPAIR LOAD BEARING CAPACITY OF EXISTING FOUNDATION


FILL FILTER FABRIC PRIOR TO COMMENCEMENT OF EXCAVATION FOR THE WALL

0
45
1b 1.51 2.00 0.7 1.0 1.7 0.30 300 300 - - CONSTRUCTION. THIS EARTH RETENTION SYSTEM MAY BE
150

TEMPORARY OR PERMANENT DEPENDING ON SITE CONDITION,


FINISH
AND SUBJECTING TO APPROVAL OF CONTRACTING OFFICER.
150

GRADE 1 2.01 3.00 0.8 1.4 2.2 0.35 300 350 300 300

3. CONTRACTOR SHALL VERIFY SITE CONDITION INCLUDING


VERIFICATION OF THE SPECIFIED DESIGN PARAMETERS FOR
2 3.01 3.50 1.1 1.7 2.8 0.40 300 400 400 300
THE WALL AND NOTIFY THE CONTRACTING OFFICER OF ANY
E2

GRAVEL DRAIN UNUSUAL SITUATION DEVIATING FROM THE WALL DESIGN


MIN
900

MATERIAL 3 3.51 4.00 1.3 2.0 3.3 0.45 300 450 450 300 PARAMETERS FOR NECESSARY MODIFICATION OF THE WALL
ANGLE OF CONSTRUCTION.
E1

REPOSE OF
NATURAL SOIL
MIN
150

4 4.01 4.50 1.6 2.4 4.0 0.50 300 500 650 400 4. EXPOSED SIDE CONCRETE FINISH SHALL HAVE TEXTURED
FORM LINERS WHICH SHALL BE PRE-APPROVED.
50 CL

5 4.51 5.00 1.9 2.6 4.5 0.60 300 600 900 450 5. BACKFILL AGAINST RETAINING WALL SHALL NOT BE
MIN

W2 PERMITTED UNTIL CONCRETE STRENGTH HAS REACHED


NATURAL
T1

b8 b7 DESIGN STRENGTH.
SUBGRADE b1 6 5.01 5.50 2.2 2.8 5.0 0.60 300 600 1000 450

6. CONSTRUCTION OF PAVEMENT OR UTILITIES SHALL NOT


COMMENCE IN FRONT OF THE RETAINING WALL UNTIL
CL
75

7 5.51 6.00 2.5 3.0 5.5 0.60 300 600 1000 450
30 DAYS AFTER THE COMPLETION OF THE RETAINING
WALL AND PLACEMENT OF BACKFILL BEHIND THE WALL.
D1

b6 0150 PERFORATED PIPE


/
75 b3 WRAPPED IN COMPOSITE
CL FILTER FABRIC * HOOKED BARS
b9 ** BENT BARS RETAINING WALL REINFORCING BARS

75
DOWEL SPLICE (mm) REINFORCING BARS AND SPACING (mm)
CL WALL HEIGHT
300 TYPE Hw, (M) * **
E1 E2 b1 b2 b3 b4 b5 b6 b7 b8 b9
T2

A B
1a UP TO 1.50 600 1000 D13@300 D13@300 D16@300 D13@300 D13@300 - D13@300 D13@300 D13@400
(TOE WIDTH) (HEEL WIDTH)
C

1b 1.51 2.00 600 1000 D13@300 D13@300 D16@300 D13@300 D13@300 - D13@300 D13@300 D13@400
RETAINING WALL DETAIL
1 NOT TO SCALE 1 2.01 3.00 600 1000 D13@300 D13@300 D19@250 D16@250 D13@300 D13@200 D16@300 D13@250 D13@400

2 3.01 3.50 600 1200 D13@300 D13@300 D22@200 D19@200 D13@250 D13@200 D16@300 D16@300 D13@400
VARIES
T1

3 3.51 4.00 600 1200 D13@300 D16@300 D22@200 D19@200 D16@300 D13@200 D16@300 D16@300 D13@400

4 4.01 4.50 600 1400 D13@300 D16@300 D25@200 D19@200 D16@300 D13@200 D19@300 D16@250 D13@400
T1

1
5 4.51 5.00 600 1400 D13@300 D16@200 D25@200 D19@200 D16@200 D13@200 D22@300 D19@300 D13@400
10

MIN T1
6 5.01 5.50 600 1400 D13@300 D16@200 D25@200 D19@200 D16@200 D13@200 D22@300 D19@300 D13@400

STEP FOOTING DETAIL


2 NOT TO SCALE
7 5.51 6.00 600 1400 D13@300 D19@200 D25@125 D22@250 D19@200 D13@200 D22@200 D22@300 D13@400

You might also like