Leading Railway Systems Provider in Indonesia

Len Industri is an Indonesian state-owned railway engineering company that provides railway signaling, telecommunications, power, and SCADA systems. It has over 35 years of experience delivering over 210 railway projects across Indonesia, including double tracking projects, light rail systems, and signaling system exports. The company has 748 employees with expertise in engineering, project management, sales, and technical support roles.

Uploaded by

sidiq ramadhani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
162 views21 pages

Leading Railway Systems Provider in Indonesia

Len Industri is an Indonesian state-owned railway engineering company that provides railway signaling, telecommunications, power, and SCADA systems. It has over 35 years of experience delivering over 210 railway projects across Indonesia, including double tracking projects, light rail systems, and signaling system exports. The company has 748 employees with expertise in engineering, project management, sales, and technical support roles.

Uploaded by

sidiq ramadhani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

COMPANY PROFILE

[email protected]
Len Industri (Persero)
A state-owned company under the
coordination of the Ministry of SOEs in
Indonesia involved in technology-based
business

Len Railway Systems A Railway Provider Company that is a leader


Engineering, Procurement, and in the fields of Railway Signalling System,
Construction Railway Company Railway Telecommunication System, Railway
Power System and Railway SCADA Systems in
Indonesia.

Len Rekaprima Semesta

Organization
Operation and Maintenance
Railway Company
01
Become State First Railway
1991 Owned Enterprize as
2006 Signaling Export
Established as Len Industri Project
First Launching
part of Indonesian 1965 2002 Indigenous Railway Railway Project Delivery Record
Institute of Sciences Signaling Product 2012 541 km with 79 stations Double
Tracking within 2 years

Set Up New Subsidiary,


2017 Len Rekaprima Semesta
for Operation and Maintenance

LRS is market leader in


First Involvement
in Railway Business 1984 NOW
Railway System
Projects in Indonesia
First Main
1998 Contractor for First in Service of
Railway Project 2004 Indigenous Railway
Signaling Product
PT LEN RAILWAY
SYSTEMS, Subsidiary
2011 for Railway Business
was established
First Integrated
2016 Systems Indonesian Urban Project and
Deliver Services to Overseas

Milestone
02
Products and Services

Design
Engineering
Signaling
Procurement

SCADA Power

Installation

Telecommunication

Testing and

Comapany Capabilities
Commissioning

Operation &
Training
Maintenance
03
Interlocking SiLSafe Power and Telecom Rack LED Signal
(SIL-4 Certified) (IP 54 Certified)

Electronic Assembly of Electrical Assembly Line of


Production Floor Facility Production Test
Interlocking System (SiLSafe) Interlocking System (SiLSafe)

Manufacturing Capability
04
HUMAN RESOURCES
EMPLOYEES PERCENTAGES
BASED ON DIVISION
Technician
(Temporary Employee)
40,6%
Total of Employees

748
Project Support
12,9% Management
4,0%

Sales and Marketing


2,0%

Human Resources
Office Support Engineering
11,9% 20,8%
Project Management
05 7,9%
Human Resources

Indonesian
Institution of ASEAN Health and Project
Certificate of TÜV Rheinland
Railway Signal Engineering Safety Works Expertise for Management
Certified
Engineers Register Project Institute
10 for General
4 for Firefighter Management Project
5 Licenses 31 Members Functional
4 for Electrician Management
22 Members 16 for Elec. Safety
16 Licenses Professional
Technician Engineer

Company

Certifications
06
Indonesian Projects
35+ Years 210+ Projects

350+ Stations 3550+ Kilometers


Binjai – Besitang
Project (BNB-10)

Medan Interface
Bandar Tinggi – Kuala Tanjung
Project (BTK-4)

Rantauprapat – Kota Pinang


Project (RPK-10)

Light Rail Transit (LRT)


Palembang
Martapura – Baturaja Project
Prabumulih Project Cikampek - Cirebon
Cirebon - Semarang
Automated People Mover System (APMS) Semarang Poncol – Tawang
Light Rail Transit (LRT) Makassar – Pare-Pare
Light Rail Transit (LRT)
Surabaya Pasar Turi
Jabodebek for Platform Screen DKI Jakarta
Door (PSD) and Signalling

Indonesian Project
Double-Double Track Package A Purwokerto – Kroya Madiun – Jombang
Jatinegara – Bekasi Project
Kroya - Kutoarjo Madiun – Kedungbanteng
Tambun Station Project
Solojebres – Kedungbanteng
7
07 Adi Soemarmo Airport
Urban Projects
Soekarno Hatta Airport Skytrain - 2016
End User

Track Length 3,3 km


Timeline Project <12 months
Stations 4 Stations
(Terminal 1, Terminal 2, Terminal 3, Integrated Building)
with OCC
Layout Project

Urban Project
Rubber Tire AGT Side 3rd Rail with 750 VDC
CBTC GoA 4
Guided, 3 Set Trainset to Rigid Power Rail
ATP
each have 2 cars
8
Urban Projects End User
LRT (Light Rapid Transit) Palembang - 2016
Track Length 23.8 km (elevated pinch loop)
Timeline Project 18 months
Stations 13 Station + 1 Depo with OCC
Layout Project

Subcontractor

Urban Project
ETCS Level 1, 2 Set Trainset each 3rd Rail with 750 VDC
ATP and ATS have 3 cars
9
9
Urban Projects
LRT (Light Rapid Transit) Jakarta Phase 1 - 2016

Layout Project
End User
Jakarta Propertindo
Track Length 5,8 km
Timeline Project 20 months
Stations 6 Stations + 1 Depo

Urban Project
ETCS Level 1, 3 Set Trainset each 3rd Rail with 750 VDC
ATP and ATS have 2 cars
10
Urban Projects
LRT (Light Rapid Transit) Jabodebek - 2018
End User

Track Length 44,43 km


Timeline Project 36 months
Stations 18 Stations + 1 Depo
with OCC + Backup
Subcontractor

Urban Project
ETCS Level 2 3 Set Trainset each 3rd Rail with 750 VDC
ATP, ATS and ATO have 2 cars
11
Operation and Maintenance Projects
• North Line Double Track (2014 – 2016)
Total of Stations : 51 stations and 7 IB form Cirebon Prujakan to Surabaya Kota
Length: 548 Km
• Double Track (2014 - 2016)
Total of Stations: 3 Stations and 4 IB from Duri Station to Tangerang Station
Length: 22 Km
• Double Track (2015 - 2016)
Total of Terminals: 8 Stations and 1 IB Cirebon Prujakan Station to Prupuk Station
Length: 80 Km
• Double Track (2015 - 2017)
Total of Stations: 3 Stations from Delanggu Station to Purwosari Station
Length: 15 Km
• Double – Double Track (2017 until Now)
Total of Stations: 8 Stations from Cikarang Station to Manggarai Station
Length: 36,4 Km
• APMS (2017 until Now)
Total of Terminals: 3 Terminals and 1 IB from Terminal 1 to Terminal 3

Comapany Capabilities
Length: 2,95 Km
• LRT Palembang (2018 until now)
Total of Stations: 13 Stations from Bandara Sultan Mahmud Badaruddin II Station to OPI Station
Length: 23 Km
• MRT Jakarta (2019 until now for PSD Systems)
Total of Stations: 13 Stations from Lebak Bulus Station to Bundaran HI Station
Length: 16 Km

12
Global Business Portfolio
Will Expand More

Bangladesh
CBI Modification for 4 Stations

Signing Contract Biswas-LRS

Philippine
Starting Project
Procurement of Level
Crossing, Signaling and
Interlock in Tutuban -
Alabang

Malaysia
Training for KTMB
Signing MoU AsiaMobiliti-LRS
Singapore

Comapany Capabilities
Signaling Modification

13
13 Signing Contract PNR-LRS
Comprehensive
Signaling Solutions Control Center System
to manage O&M of entire rail system

Interlocking System Train Control System


to control safety of train route to control safety of train movement

Company Products
Trackside Signaling Products
to enable safety of rail signaling operation
14
Interlocking Systems

Features :
Safe
• Built with SIL-4 safety platform processor
• Using BR930 Standard Relays
• Safety process development with EN50128 standard

Reliable
• Using railway specific components
• Applying redundant CPU
• Hot Standby

Easy to Maintain

Company Products
• Designed with hot swap modules
• Built with COTS (Commercial Off-The-Shelf) components

Cost-Effective
• Modular
• Using Block Programming
15
Control Centre System
Features :
Safe
• Generic component SIL 2 compliance
• COTS (Commercial Off-The-Shelf) SIL 2 certificate
• Safety process development with EN 50128 standard
Flexible
• 300++ Protocols support to various system (also possible to
create customized protocol)
• Applicable to another control system

User Friendly
• Easy to use
• Having various ready to use wizard that can help engineer

Company Products
develop the system

Cost-Effective
• Modular
• Backward compatible
• Open and independent
16 • Maintenance Efficient
Our Portfolio CTC in Indonesian Project
Total Station
No. Project CTC Location Year
Monitoring

1 Construction of Operation Center CTC In Daop 6 Yogyakarta Yogyakarta 2020 30


CTC at Palembang LRT
2 Construction of CTC for Manggarai to Jatinegara Jakarta 2019 30

3 CTC Project Between Mojokerto - Jombang in Surabaya - Solo Line Madiun 2019 18

4 CTC Double Track Railroad at Lintas Kroya - Kutoarjo Purwokerto 2017 36

5 CTC Project for Purwokerto - Kroya, Cirebon - Kroya Cross Line Cirebon 2016 6

6 CTC Work of Palembang LRT Palembang 2016 13


X
CTC at Jakarta LRT
CTC for Automated People Mover System (APMS) at Soekarno - Hatta
7 Tangerang 2016 3
International Airport
18
8 CTS at Surabaya Gubeng Station between Tobo - Surabaya Pasarturi Surabaya 2016

Company Products
9 CTC Systems for the Double Track Railroad Cross Tegal - Bojonegoro Semarang 2015 24

CTC at Madiun
17
Trackside Signaling Products

Features :
Safe
• Safety process following V-Lifecycle based on EN50126
• Phantom free design
• Colors comply with railway standard BS-1367

Reliable
• IP 54 certified
• Reliability far surpasses incandescent signal

Company Products
Cost-Wise to Maintain
• Long service life
• Low whole life cost
• Low power consumption

18
Potential Project for Railway
Bangladesh
1. Construction of double line between Joydevpur-
Bangabandhu Bridge-Ishurdi (Investment and Joint
Venture for Railway Project) – 2024 – US$ 27,350,000
United Arab Emirates 2. Construction of Double Line from Tongi-Joydevpur [LOC]
(Investment and Joint Venture for Railway Project) – 2025
1. Hope with humble to be partnered with
– US$ 33,550,000
Etihad Rail for Freight and Passenger Train in
UAE

Philippine
1. Platform Screen Door Project (Investment and joint
venture for Railway Project) – 2022 – US$ 25,750,000
2. Extension Line for MRT and LRTA (Investment and
Joint Venture for Railway Project) – approx. 2024 –
US$ 19,550,000
Tanzania
1. Construction for Freight and Passenger Train
in Tanzania – (Investment and Joint Venture
for Railway Project) - 2023 – US$54,750,300 Malaysia
1. Construction for Urban Railway for
ART in Malaysia – 2023 –
US$14,750,300

Indonesia
1. Construction of Double Track in Sulawesi Island
(Investment) – US$ 45,350,000

Potential Project
2. Construction of Double Track in Sumatera Island
(Investment) – US$ 35,700,000
3. Construction for Urban Railway connecting between
terminal International Airport Ngurah Rai Denpasar Bali
(Investment) – US$ 27,500,000

19