Data
- Panjang Jalan 358 meter
- Lebar Jalan 12 meter
- Tebal Urugan 0.5 meter
- Cut 14209 BCM
- Fill 7430 BCM
- SG Batu 2.3
- Bucket Capacity 0.93 BCM
- Jumlah Bucket 8
- Jarak Quary - centroid jalan 0.1 km
- Loading point sirtu 1
- Compactor Used 1 Unit
CUT AND FILL
FILL - STONE (BCM) 3,715
FILL - SOIL (BCM) 3,715
CAPACITY OF UNIT FILL (BCM/DAY) 541
UNIT USED
- EXCA PC 200 #NAME?
- BULDOZER #NAME?
QUARY
Jarak GEOMETRI JALAN
MATERIAL
(Km) PANJANG JALAN (m) LEBAR JALAN (m)
4.1 Sirtu 358 12
COMPACTING
GEOMETRI JALAN
PANJANG JALAN (m) LEBAR JALAN (m) TEBAL URUGAN (m) VOLUME
358 12 0.5 2,148.00
Result
dan TOTAL USED UNIT USE
EXCA PC 200 #NAME? Unit
Grader 1 unit
ROCKBREAKER 1 Unit
COMPACTOR 1 Unit
DT 14 Unit
TOTAL DAYS #DIV/0! Days
1 1
If DT not maksimum 1000 Unit EXCA PC 200 Grader ROCKBREAK
Note: isi data di cell warna kuning
GEOMETRI JALAN
JAM KERJA
TEBAL URUGAN (m) VOLUME EFEKTIF
0.5 2,148.00 4,940.40 0
PENGGUNAAN ALAT BERAT LAMA
JAM KERJA EFEKTIF PENGERJAAN
VOLUME COMPACTOR (HARI)
32,778 ton 0 1 #DIV/0!
UNIT USED
14
1 1 1
EXCA PC 200 Grader ROCKBREAKER COMPACTOR DT
PENGGUNAAN ALAT BERAT (maksimal)
LAMA PENGERJAAN
EXCAVATOR PC200 DT (HARI)
1 14 #DIV/0!
ROAD PROJECT PLANNING - SEGMENT C (
STONE)
ROSTER
TOTAL DAYS AND SHIFTS :
MOHH 12 hours/day (hrs)
P5M 15 min/shift (min)
P2H 10 min/shift (min)
Take Operators to Location 10 min/shift (min)
Greasing 20 min/shift (min)
Refueling 20 min/shift (min)
Rain 120 min/shift (min)
Meal and Rest 60 min/shift (min)
End of the Shift Preparation 15 min/shift (min)
Shift Change 60 min/shift (min)
Friday Pray 60 min/week (min)
Total Working Hours
CUT COMBINATION EQUIPMENT QUANTITY
PC200 (SUPPORT)
ROCK BREAKER
EQUIP. PHYSICAL AVAILABILITY
ROCK BREAKER 90%
EQUIPMENT USE OF AVAILIBILITY
ROCK BREAKER
EQUIP. PRODUCTIVITY BCM/JAM
ROCK BREAKER 10
14.00
EQUIPMENT CAPACITY
TOTAL EQUIPMENT CAPACITY (CUT) BCM
Bulan kedua dengan 3 breaker
ROAD PROJECT PLANNING - SEGMENT C (
STONE)
ROSTER
TOTAL DAYS AND SHIFTS :
MOHH 12 hours/day (hrs)
P5M 15 min/shift (min)
P2H 10 min/shift (min)
Take Operators to Location 10 min/shift (min)
Greasing 20 min/shift (min)
Refueling 20 min/shift (min)
Rain 120 min/shift (min)
Meal and Rest 60 min/shift (min)
End of the Shift Preparation 15 min/shift (min)
Shift Change 60 min/shift (min)
Friday Pray 60 min/week (min)
Total Working Hours
CUT COMBINATION EQUIPMENT QUANTITY
PC200 (SUPPORT)
ROCK BREAKER
EQUIP. PHYSICAL AVAILABILITY
ROCK BREAKER 90%
EQUIPMENT USE OF AVAILIBILITY
ROCK BREAKER
EQUIP. PRODUCTIVITY BCM/JAM
ROCK BREAKER 10
14.00
EQUIPMENT CAPACITY
TOTAL EQUIPMENT CAPACITY (CUT) BCM
G - SEGMENT C (CUT-
Daily (Hours)
Sun Mon Tue Wed Thu
Sun Mon Tue Wed Thu
12.00 12.00 12.00 12.00 12.00
0.25 0.25 0.25 0.25 0.25
0.17 0.17 0.17 0.17 0.17
0.17 0.17 0.17 0.17 0.17
0.33 0.33 0.33 0.33 0.33
0.33 0.33 0.33 0.33 0.33
2.00 2.00 2.00 2.00 2.00
1.00 1.00 1.00 1.00 1.00
0.25 0.25 0.25 0.25 0.25
1.00 1.00 1.00 1.00 1.00
0.00 0.00 0.00 0.00 0.00
6.50 6.50 6.50 6.50 6.50
Daily (Hours)
Sun Mon Tue Wed Thu
1 1 1 1 1
2 2 2 2 2
Daily (Hours)
90% 90% 90% 90% 90%
Daily (Hours)
49% 49% 49% 49% 49%
Daily (Hours)
10 10 10 10 10
Daily (Hours)
Sun Mon Tue Wed Thu
Sun Mon Tue Wed Thu
57 57 57 57 57
Stone Material (BCM)
Segment
Length (m) Area (ha) Cut
C 358 0.43 14,209
Total 358 0.43 14,209
Total Cut (BCM) 14,209
Length (m) 358
Total
Area (Ha) 0.43
CUT (BCM) 14,209 30 hr
CAPACITY OF UNIT (BCM)/DAY 55 1,645.36 sebulan dengan 2 breaker
ESTIMATION COMPLETED (DAY) 259 12,563.64
G - SEGMENT C (CUT-
Daily (Hours)
Sun Mon Tue Wed Thu
Sun Mon Tue Wed Thu
12.00 12.00 12.00 12.00 12.00
0.25 0.25 0.25 0.25 0.25
0.17 0.17 0.17 0.17 0.17
0.17 0.17 0.17 0.17 0.17
0.33 0.33 0.33 0.33 0.33
0.33 0.33 0.33 0.33 0.33
2.00 2.00 2.00 2.00 2.00
1.00 1.00 1.00 1.00 1.00
0.25 0.25 0.25 0.25 0.25
1.00 1.00 1.00 1.00 1.00
0.00 0.00 0.00 0.00 0.00
6.50 6.50 6.50 6.50 6.50
Daily (Hours)
Sun Mon Tue Wed Thu
1 1 1 1 1
4 4 4 4 4
Daily (Hours)
90% 90% 90% 90% 90%
Daily (Hours)
49% 49% 49% 49% 49%
Daily (Hours)
10 10 10 10 10
Daily (Hours)
Sun Mon Tue Wed Thu
Sun Mon Tue Wed Thu
115 115 115 115 115
Stone Material (BCM)
Segment
Length (m) Area (ha) Cut
C 0 0.00 14,209
Total 0 0.00 14,209
Total Cut (BCM) 14,209
Length (m) -
Total
Area (Ha) -
CUT (BCM) 14,209 30 hr
CAPACITY OF UNIT (BCM)/DAY 110 1,650.00 sebulan dengan 2 breaker
ESTIMATION COMPLETED (DAY) 144 55 bcm/day di bulan pertama
12,559.00
114
Week
Fri Sat
Fri Sat
12.00 12.00 84.0
0.25 0.25 1.8
0.17 0.17 1.2
0.17 0.17 1.2
0.33 0.33 2.3
0.33 0.33 2.3
2.00 2.00 14.0
1.00 1.00 7.0
0.25 0.25 1.8
1.00 1.00 7.0
1.00 0.00 1.0
5.50 6.50 45
Week
Fri Sat
1 1 1
2 2 2
Week
90% 90% 90%
Week
40% 49% 48%
Week
10 10 10
Fri Sat Week
Fri Sat
39 57 55
ulan dengan 2 breaker
Week
Fri Sat
Fri Sat
12.00 12.00 84.0
0.25 0.25 1.8
0.17 0.17 1.2
0.17 0.17 1.2
0.33 0.33 2.3
0.33 0.33 2.3
2.00 2.00 14.0
1.00 1.00 7.0
0.25 0.25 1.8
1.00 1.00 7.0
1.00 0.00 1.0
5.50 6.50 45
Week
Fri Sat
1 1 1
4 4 4
Week
90% 90% 90%
Week
40% 49% 48%
Week
10 10 10
Fri Sat Week
Fri Sat
79 115 110
ulan dengan 2 breaker
m/day di bulan pertama
ROAD PROJECT PLANNING - SEGMENT C (FILL
ROSTER
TOTAL DAYS AND SHIFTS :
MOHH 12 hours/day (hrs)
P5M 15 min/shift (min)
P2H 10 min/shift (min)
Take Operators to Location 10 min/shift (min)
Refueling 25 min/shift (min)
Rain 120 min/shift (min)
Slippery 120 min/shift (min)
Meal and Rest 60 min/shift (min)
End of the Shift Preparation 15 min/shift (min)
Shift Change 60 min/shift (min)
Friday Pray 60 min/week (min)
Total Working Hours
CUT and FILL COMBINATION EQUIPMENT QUANTITY
DUMP TRUCK
PC 200
PC200 (SUPPORT)
EQUIP. PHYSICAL AVAILABILITY
DUMP TRUCK 90%
PC 200 85%
EQUIPMENT USE OF AVAILIBILITY
DUMP TRUCK
PC 200
EQUIP. PRODUCTIVITY BCM/JAM
DUMP TRUCK 80
PC 200 80
EQUIPMENT CAPACITY
DUMP TRUCK BCM
PC 200 BCM
TOTAL EQUIPMENT CAPACITY (FILL) BCM
EGMENT C (FILL)
Daily
Sun Mon Tue Wed
Sun Mon Tue Wed
12.00 12.00 12.00 12.00
0.25 0.25 0.25 0.25
0.17 0.17 0.17 0.17
0.17 0.17 0.17 0.17
0.42 0.42 0.42 0.42
2.00 2.00 2.00 2.00
2.00 2.00 2.00 2.00
1.00 1.00 1.00 1.00
0.25 0.25 0.25 0.25
1.00 1.00 1.00 1.00
0.00 0.00 0.00 0.00
4.75 4.75 4.75 4.75
Daily
Sun Mon Tue Wed
2 2 2 2
1 1 1 1
1 1 1 1
Daily
90% 90% 90% 90%
85% 85% 85% 85%
Daily
33% 33% 33% 33%
29% 29% 29% 29%
Daily
80 80 80 80
80 80 80 80
Daily
Sun Mon Tue Wed
Sun Mon Tue Wed
568 568 568 568
236 236 236 236
568 568 568 568
Soil (BCM)
Segment Length (m) Area (Ha)
FILL
C 358 0.43 3,715
Total 358 0.43 3,715
FILL - STONE (BCM) 3,715
FILL - SOIL (BCM) 3,715
CAPACITY OF UNIT FILL (BCM/DAY) 541
ESTIMATION COMPLETED (DAY) 14
Week
Thu Fri Sat
Thu Fri Sat
12.00 12.00 12.00 84.0
0.25 0.25 0.25 1.8
0.17 0.17 0.17 1.2
0.17 0.17 0.17 1.2
0.42 0.42 0.42 2.9
2.00 2.00 2.00 14.0
2.00 2.00 2.00 14.0
1.00 1.00 1.00 7.0
0.25 0.25 0.25 1.8
1.00 1.00 1.00 7.0
0.00 1.00 0.00 1.0
4.75 3.75 4.75 32
Week
Thu Fri Sat
2 2 2 2
1 1 1 1
1 1 1 1
Week
90% 90% 90% 90%
85% 85% 85% 85%
Week
33% 24% 33% 32%
29% 19% 29% 28%
Week
80 80 80 80
80 80 80 80
Thu Fri Sat Week
Thu Fri Sat
568 408 568 541
236 156 236 223
568 408 568 541
Stone (BCM)
FILL
3,715
3,715
JAM KERJA
MA DT MA Exca UOA FF SF SG
EFEKTIF
90% 85% 61% 100% 1 2.3 0
Jarak GEOMETRI JALAN
MATERIAL PANJANG
(Km) LEBAR JALAN (m) TEBAL URUGAN (m) VOLUME
JALAN (m)
4.1 Sirtu 358 12 0.5 2,148.00 4,940.40
JUMLAH MATERIAL
GEOMETRI URUGAN (M)
VOLUME
PANJANG LEBAR TEBAL
(BCM) KAPASITAS BUCKET (M3)
358 12 0.5 2,148 0.93
PENGGUNAAN ALAT BERAT (maksimal)
JAM KERJA EFEKTIF LAMA PENGERJAAN (HARI)
EXCAVATOR PC200 DT
0 1 14 #DIV/0!
EXCA
CT EXCA
BUCKET/RIT
Digging time Swing time Dumping time Empty swing time KAPASITAS BAK M3
6 8 2 7 8 7.44
DUMP TRUCK
KECEPATAN CT DT
JARAK (KM) KECEPATAN ISI (KM/JAM) KOSONG
(KM/JAM) Manuver Time Loading Time
Hauling Time
4.1 10 15 30 184 1476
CT DT
PRODUCTIVITY EXCA PER JAM PRODUCTIVITY DT PER JAM MAX DT
Manuver Time
DumpingEmpty
Time Hauling Time
30 10 984 75.4755652173913 5.41798673544584 14
PRODUKSI PER HARI (BCM) WAKTU YANG DIBUTUHKAN (HARI)
0 #DIV/0!
Productivity
Exca Dozer DT Grader Compactor
200 m3/jam 2036.25 m2/jam 0.8
122 m3/jam 2000
12
0.5
800
66.67
60.00
2148.00
lama jam 35.80
lama hari #DIV/0!
GEOMETRI JALAN
JAM KERJA
PANJANG EFEKTIF
LEBAR JALAN (m) TEBAL URUGAN (m) VOLUME
JALAN (m)
358 12 0.5 2,148.00 32,778 ton 0
m
m/jam
lintasan
m
m3/jam
PENGGUNAAN ALAT BERAT
LAMA PENGERJAAN
COMPACTOR (HARI)
1 #DIV/0!