Sample Plumbing Layouts
Sample Plumbing Layouts
1/2"Ø PC BLUE
1.00m 3.50m 1.50m 3.00m CATCH BASIN SEPTIC TANK
6"Ø STORM
DRAIN PIPE
VSTR
CB CB CB
FD 2"Ø PVC PIPE
FA
CO
WC
WC
3.00m
LV
LAV 1/2"Ø PVC BLUE
4.50m
CO
CO
CB
HB
CB CB
3.00m
10.00m
10.00m
FA
KS
CB HB
KS
F 6"Ø STORM
WP
5.50m
DRAIN PIPE
4.00m
WP
CB
CB CB
2.00m
HB
2"Ø PVC PIPE
1.00m
CB CB
HB HB
1.00m 4.00m
9.00m
ISOMETRIC WC
LEGEND AND SYMBOLS
WATER CLOSET CB CATCH BASIN
NOT TO SCALE CO CLEAN OUT WP WATER PUMP
FD FLOOR DRAIN 4"Ø PVC PIPE
LAV LAVATORY 2"Ø PVC PIPE
0.10m
3"Ø PVC DOWN SPOUT 6"Ø PVC PIPE
0.30m
AIR SPACE
WATER LEVEL
10mmØ RSB PLUMBING SPECIFICATIONS
1.50m
0.50m
1.25m
3"Ø DOWN SPOUT 1. ALL WORKS INCLUDED HERE IN SHAKK BE EXCUTED ACCORDING TO THE
0.10m
0.10m
1.70m
DIGESTIVE PROVISIONS OF THE PHILIPPINE PLUMBIBG CODE THE NATIONAL BUILDING
1.10m
LEACHING CHAMBER CODE AND RULES REGULATIONS.
4" THICK CHB WALL 2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND
0.50m CHAMBER
0.60m
0.40m
0.60m
0.40m
0.20m
FOR PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL
0.10m
0.10m
4" CONC.
0.70m 1.60m SLAB WITH 0.35m 2-10mmØ CONT. 0.35m
OF ARCHITECT OR ENGINEER.
0.10m 0.40m 0.10m 10mmØ BARS WITH 10mmØ 4. PROPOSED SANITARY SHALL CONFIRM TO THE ACTUAL LOACTION DEPTH AND
5" THICL CHB WALL INVERT ELEVATION OF ALL EXISTING PIPES AND STUCTURE AS VERIFIED BY
0.60m
RSB @ 0.15 0.35m TIES SP. 0.40 O.C
BW THE CONTRACTOR.
PLAN SECTION 5. ALL SLOPES FOR THE HORIZONTAL DRAINAGE SHALL MAINTAIN 2% MINIMUM
PLAN SECTION UNLESS OTHERWISE SPECIFIED.
6. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE ACCORDING WITH
MANUFACTURER INSTRUCTION.
CATCH BASIN DETAIL DETAIL OF SEPTIC TANK 7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTIITIES AT SITE AND COORDIN
THE WORK WITH THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE
SERVICE COONECTING POINT.
SCALE 1:30MTS SCALE 1:50MTS 8. ALL WORKS TO BE DONE SHALL BE THE DIRECTION SUPERVISION OF A
MASTER PLUMBER.
PVC DS PVC DS
ST
up up LEGEND AND SYMBOLS PLUMBING SPECIFICATIONS:
PVC DS PVC DS PVC DS PVC DS PVC DS PVC DS PVC DS WP
PVC DS PVC DS WC WATER CLOSET CB CATCH BASIN 1. ALL WORKS INCLUDED HERE IN SHAKK BE EXCUTED ACCORDING TO THE
PVC DS PVC DS PROVISIONS OF THE PHILIPPINE PLUMBIBG CODE THE NATIONAL BUILDING
CO CLEAN OUT WP WATER PUMP CODE AND RULES REGULATIONS.
2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND
FD FLOOR DRAIN 4"Ø PVC PIPE
SPECIFICATION. HE ENGINEERING SHALL BE NOTIFIED IMMEDIATELY FOR ANY
KS VSTR LAV LAVATORY 2"Ø PVC PIPE DISCREPANCYFOUND THEREIN.
RISER UP RISER UP
3. ALL PIPES SHALL BE INSTALLED AS INDICATED ANY RELOCATION RREQUIRED
FA
KS KITCHEN SINK 3/4"Ø OR 1/2"Ø PVC FOR PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL
OF ARCHITECT OR ENGINEER.
PVC DS VSTR VENT STACK 6"Ø PVC STORM 4. PROPOSED SANITARY SHALL CONFIRM TO THE ACTUAL LOACTION DEPTH AND
RISER UP PVC DS VSTR
PVC DS PVC DS PVC DS
INVERT ELEVATION OF ALL EXISTING PIPES AND STUCTURE AS VERIFIED BY
FD HB HOSE BIBB DS DOWNSPOUT(3"Ø) THE CONTRACTOR.
RISER UP CO PVC DS
PVC DS PVC DS
SHO LAV
PVC DS/FD 5. ALL SLOPES FOR THE HORIZONTAL DRAINAGE SHALL MAINTAIN 2% MINIMUM
FA FAUCET ST SEPTIC TANK
DOWN UNLESS OTHERWISE SPECIFIED.
BTD
DOWN WC 6. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE ACCORDING WITH
CO
MANUFACTURER INSTRUCTION.
LAV CO
WC CO 7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTIITIES AT SITE AND COORDIN
THE WORK WITH THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE
PVC DS DOWN
FD WC LAV SHO PVC DS SERVICE COONECTING POINT.
DOWN FD
PVC DS SHO
PVC DS
8. ALL WORKS TO BE DONE SHALL BE THE DIRECTION SUPERVISION OF A
PVC DS
PVC DS
MASTER PLUMBER.
PVC DS PVC DS PVC DS/FD
LAV
WC
FD PVC DS
CO SHO PVC DS PVC DS PVC DS PVC DS/FD
PVC DS PVC DS/FD
PVC DS PVC DS PVC DS
PVC DS PVC DS
PVC DS
PVC DS
PVC DS/FD
PVC DS/FD PVC DS/FD
PVC DS
PVC DS PVC DS
PVC DS PVC DS
PVC DS
PVC DS PVC DS
PVC DS
HB HB
PLUMBING LAYOUT
SCALE 1:150MTS
2.70m
1.25m
0.50m
0.10m
0.50m
0.60m
0.40m
PLAN
0.10m
PLAN
AIR SPACE 6"Ø DOWN SPOUT
0.30m
DIGESTIVE
1.70m
LEACHING
CHAMBER CHAMBER
1.10m
0.60m
0.40m
0.20m
0.10m