0% found this document useful (0 votes)
409 views1 page

Foundation Plan Column Footing Detail

The document contains construction plans for building a pump station, including a foundation plan and column footing detail. The foundation plan shows a 100mm thick concrete slab on fill with reinforcement bars spaced 300mm apart. The column footing detail illustrates dimensions for footings to support columns. Contractors are responsible for verifying all dimensions before construction.

Uploaded by

parkrocky0
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
409 views1 page

Foundation Plan Column Footing Detail

The document contains construction plans for building a pump station, including a foundation plan and column footing detail. The foundation plan shows a 100mm thick concrete slab on fill with reinforcement bars spaced 300mm apart. The column footing detail illustrates dimensions for footings to support columns. Contractors are responsible for verifying all dimensions before construction.

Uploaded by

parkrocky0
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

A B C

5.00 2.50 N.G.L.

1
SECTION

2.70
5.00

PROVIDE 100mm THK


SLAB ON FILL WITH
REBAR Ø1O@300mm
SPACING O.C

2.24
2

3.20 1.80 2.50 C1F1 DETAIL


CONDITIONS ON THE JOB. THE DESIGNER MUST BE NOTIFIED IMMEDIATELY OF ANY VARIATIONS
DIMENSIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND
WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED

FROM THE DIMENSIONS AND CONDITIONS SHOW BY THESE DRAWINGS.

1 FOUNDATION PLAN 2 COLUMN FOOTING DETAIL


S-2 SCALE MTS S-2 SCALE MTS

ENGINEER PRINTS AND REVISIONS SHEET CONTENT SHEET NO.


PROJECT
NO DATE THESE DRAWINGS ARE
AS BUILT PUMP STATION DESCRIPTION
INSTRUMENTS OF PROFESSIONAL
AS SHOWN
SERVICE AND ARE NOT TO BE
REPRODUCED EXCEPT BY 02
OWNER
WRITTEN AGREEMENT WITH THE
PRC PTR PRIME WATER INFRASTRUCTURE CORP. CADD BY: CHECKED BY: S
NOTE:

ARCHITECT
ISSUED 0N
TIN DATE: DATE:
ISSUED AT LOCATION PIO MODEL COMMUNITY, PORAC, PAMPANGA

You might also like