Purpose of Document
This document gives the technical and commercial report of the proposed solar photovoltaic system. The
document will identify:
Commercial offer, warranty information, and terms & conditions
Project Information
The plant specifications
The characteristics of the equipment and material used (solar modules, inverters, balance of system
components, etc.)
The installation materials, means and methods
The criteria for the choice of system solutions and design criteria
Energy estimation Project Information
Project information
Project Name Nespak
Project Address Lahore
Grid Operator Lesco
Connection Type 3-Phase LV
Nominal Voltage 380-440v
Operations and Maintenance
The solar photovoltaic system will perform best when there is simple and periodic
maintenance taskscarried out to ensure safe, efficient and reliable operation.
Solar Modules
To increase the average output, solar panels should be cleaned at least twice in a week if
environment isdusty.
Following considerations must be followed when cleaning the solar panels:
Solar panel should be cleaned at dawn or at dusk, to ensure optimum operation of the
solar panelduring daytime hours and accurate energy generation metering.
Moist cloth or a sponge with rod should be used to clean solar panels evenly.
Gloves should be worn while cleaning to avoid any cuts from sharp edges of solar
panel frames orstructural steel.
Do not splash water on solar panels, as water spots maybe stay on surface of glass and
reduce solarpanel efficiency. Be sure to evenly clean the surface.
Do not use commercial or industrial grade cleaning agents. If required, use a mild
soapy mixture toclean hardened spots or superficial debris.
Viper with enhancement rod should be used to clean panels if installed at heights that
are not readilyaccessible.
Keep yourself at a reasonable distance from the safety railings while cleaning to avoid
any dizzinessfelt, if installed at heights.
Inverter and BOS (Balance of System)Components
There is little to no maintenance required for these components on part of the system
owner as PEMPAK NOC personnel are constantly monitoring them for performance and
safety.
However, it should be noted that no tampering, modifications, or unauthorized changes to the hardware,
Software and/or installation is permitted without prior consent and communication to PEMPAK
Technicians. The commercial terms of the O&M agreement are listed in the commercial
Proposal’s section ‘Terms and Conditions’.
QUOTATION FOR 10 KW SOLAR SYSTEM
S
Description Unit Qty Total Price
#
1 Solar Panels Plates Jinko 585 Watts N Type Qty 17
2 10 KW On Grid Growatt ( 5 Year Warranty ) No 1
3 32 Amp DC Breakers 2-P No 2
4 32 AMP AC Breaker No 1
5 DB Box No 1
6 Surge Protection Devices Set 1
7 AC Cables 10 mm 4 core Mtr 15
8 DC Flexible Copper Cables 6 mm sq. No 120
9 Flexible PVC Pipe, PVC Duct Patti No 1
AC earthing with 50 feet bore copper , 10 mm bare copper 3 Rs 1,675,000
10 No 1
feet copper rod and 2.5mm Yellow/ Green copper cable.
Copper Thimbles, Sleeves, Butt joint Connectors, Ring
11 1
Thimbles, pvc MC4 Connectors
12 Elevated Structure MS Painted job 1
13 Installation and Comissioning job 1
14 Transporation No 1
15 Net Metering Charges No 1
16 Civil Blocks No 4
17 Disconnection Switch No 1
Total Rs 1,675,000
Terms & Conditions:
Time period: 03 week from the receipt of formal confirmation with advance payment.
Prices Prices are in Pak Rupees at Lahore without Taxes and duties. All applicable taxes and
Payment Terms The full payment of material on order confirmation and installation charges after
Warranty Solar Panels pefromance-10Years. Invertor-05 Years.
Scope: The offer is limited to the scope of work and items defined in the offer. Any additional
Forex Exchange: The prices are based on 1US$=Pak Rs.290. Any variation will be taken at actual.
The optimum performance of solar system can be assured by net metering system only.
Optimum Performance:
The Hybrid and off Grid system is always dependent on operational load.
As per SRO 263 (1)/2011, (Clause 77 Part IV of 2nd Schedule of Income Tax Ordinance, 2001) all renewable sources of
All warranties are as per stipulations of the OEM/Manufacturer. PEMPAK. will assist the Customer on best effort basis in
warranty claims, but it doesn't assume any risk or liability on behalf of the OEM/Manufacture