SAP MRP Analysis Guide

This document provides instructions for running program /WUE/MM_MRP_ANALYSIS2 in SAP system SA38 to generate an MRP analysis report. The report allows the user to select options like plant, material, MRP dates, and MRP element to filter the MRP demand or exception messages. For forecasting purposes, the document recommends selecting plant and MRP elements PP or PR to view the SAP generated forecast.

Uploaded by

Erick Domínguez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
207 views3 pages

SAP MRP Analysis Guide

This document provides instructions for running program /WUE/MM_MRP_ANALYSIS2 in SAP system SA38 to generate an MRP analysis report. The report allows the user to select options like plant, material, MRP dates, and MRP element to filter the MRP demand or exception messages. For forecasting purposes, the document recommends selecting plant and MRP elements PP or PR to view the SAP generated forecast.

Uploaded by

Erick Domínguez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Documentation:

SA38
/WUE/MM_MRP_ANALYSIS2
This program provides different type of information to execute, mainly exception messages and
SAP forecast. To run type /WUE/MM_MRP_ANALYSIS2 in SA38 and execute the program

Variant *3758*

Material Data
Plant - Select the plant(s) you wish to review- this field is mandatory
Material Number - You can select the material(s) as well or leave blank to run wide open
MRP Controller – Selects Purchasing Group – you can leave blank to run wide open
Plant-sp.matl status – selects material plant status (01-09) – leave blank to run wide open MRP
Data
Planned MRP dates – select the MRP dates or leave blank to run wide open
MRP element – here you will select the MRP element to run if we are looking to obtain MRP
information – the ones we use most frequently are BA – Purchasing Requisition, BB – Subcon
Reqs, VC – Open Sales orders. For Forecasting Purposes, we use PP – Planned independent
requirement (Forecast through Promo cockpit or CPSG) and PR – Forecast requirement (SAP
generated Forecast)
MRP exception message number – if we wish to run exceptions messages instead of MRP demand
we can select that here –
The most commonly used report for the Customer Forecasting team will be SAP forecasting.
We need to select our plant(s) and make sure we select PP-PR in the MRP element option
Click execute the Results show the Plant/Material/Planned dates/MRP Elements/MRP
profile/MRPController/Required Quantity/ Stock/Pfep/Currency/unit/MRP
number/MRPNo.(Promotion name)
To export to SAP click on Export and select Spreadsheet