1 2 3 1 2 3
7.00
7.00
3.50 3.50
1.10
6-12mmØ MAIN BARS
WF2
3.50 3.50 WITH 10mmØ LATERAL
TIES SP. 4@50, 3@100,
WF2
WF2
1.20
1.20
1.45
1.45
CB
CB
REST @ 150mm O.C.
C1-F1 WF1 C1-F1 WF1 C1-F1
RB2 RB2
C C C C
NGL
4.50
4.50
WF1
4.50
4.50
WF1
RB1
RB1
RB1
0.60
100mm THK. SLAB W/ 0.80 METERS
10mmØ MATTING BARS
@ 500mm O.C. B.W.
C1-F1 EL.±0.15 mts. C1-F1
9.00
9.00
0.20
9.00
9.00
B S.
T. O. B B B
0.05
SECTION
4.50
4.50
WF1
WF1
4.50
4.50
RB1
RB1
RB1
0.80 METERS
0.28 0.25 0.28
WF1 WF1
C1-F1 C1-F1 C1-F1
A A A A
RB2 RB2
1.20
1.20
0.28
1.45
1.45
CONCRETE PAVEMENT ( T=100mm )
CB
CB
0.80 METERS 0.25
5-12mmØ BED BARS
FOUNDATION PLAN ROOF BEAM LAYOUT
SP. EQUALY O.C. B.W.
SCALE 1 : 100 METERS SCALE 1 : 100 METERS
0.28
PLAN
C1F1 DETAIL
SCALE 1 : 20 METERS
CONTRACTOR: PROJECT TITLE: PREPARED BY: REVIEWED: RECOMMENDING APPROVAL: APPROVED: SHEET NO.
REY MICHAEL F. GURREA JHOREN PATRICK M. PAGADUAN
CONSTRUCTION OF SCIENCE & COMPUTER PROPRIETOR PROJECT/AREA ENGINEER - SOUTH
LABORATORY BUILDING CHECKED: SUBMITTED:
EDGAR E. CARREDO HECTOR P. JAMORA
AS - BUILT PLAN MARLON B. BALITA-AN JOANNE TEODORA E. LAO OIC - CONSTRUCTION & MAINTENANCE DIVISION PROVINCIAL ENGINEER
QUANTITY ENGINEER - SOUTH SECTION HEAD, CONSTRUCTION DIVISION