ST 3B+G+18 ST Final-00-12

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

ST 3B+G+18 ST Final-00-12

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT : 3B+G+18 MIXED USE BUILDING - All dimensions are in mm

- This drawing should be read


in conjunction with architectural
CLIENT : ATO ALEMAYEHU MELESSE drawing

1 Along a free
GENERAL STRUCTURAL NOTES (unsupported)edge

1. ALL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ARCHITECTURAL h


AND SERVICE DRAWINGS. ANY DESCREPANCY BETWEEN DRAWINGS 4. READY-MIXED CONCRETE SHALL BE DISCHARGED WITHIN 90 MINUTES FROM THE
SHALL BE NOTIFIED TO THE ENGINEER PRIOR TO COMMENCEMENT TIME OF BATCHING. _
>2h
OF WORKS. 5. READY MIX FOR RAFT FOUNDATION SHALL HAVE MIN. INITIAL SETTING TIME OF
5 HOURS WITH OR WITHOUT RETARDER AND MAX. SETTING TIME SHALL BE NOT MORE THAN 10 HOURS. 2 Anchor length for
2. DRAWINGS SHALL NOT BE SCALED . ONLY WRITTEN DIMENSIONS free end slab
SHALL BE FOLLOWED. 6. RETAINING WALLS SHALL NOT BE CAST IN EXCESS OF 8.0M IN LENGTHS.
MINIMUM TIME GAP BETWEEN CASTINGS OF TWO ADJACENT PANELS
3. THE FOUNDATION HAS BEEN DESIGNED BASED ON THE SOIL INVESTIGATION REPORT SHALL BE NOT LESS THAN 3 DAYS. r _ Ø5 / Ø12
>
4. FOR FURTHER INFORMATION, PLEASE REFER TO EACH DRAWING. 7. COLUMNS, BEAMS, AND WALLS INCLUDING RETAINING WALLS ETC. SHALL BE CAST USING BUCKET WITH
FLEXIBLE PVC CHUTE. THESE ITEMS SHALL BE CAST IN CONTINUOUS OPERATION IN LAYERS OF 450 MM. _
r=>Ø
5. DO ALL FOUNDATION WORK IN ACCORDANCE WITH EBCS-7 EN 1997 2015 THE NEXT LAYER SHALL BE POURED ONLY AFTER THE PREVIOUS LAYER IS VIBRATED AND COMPACTED FULLY. longitudinal bars structural of frame
column stirrup spacing
6. FOUNDATIONS SHOULD ALWAYS BE PLACED ON STABLE GROUND. 8. IF THERE ARE DECRENPANCIES PLEAS CONSULT THE ENGINEER BEFORE CONSTRUCT Storey level

- IF WEAK SOIL IS ENCOUNTERED, IT SHOUD BE REPLACED WITH COMPACTED SELECTED MATERIAL FILL.

h/3
- IF ROCK IS ENCOUNTERED, IT SHOUD BE LEVELED

h/3
h
7. THE SET OF DRAWINGS FOR THIS PROJECT SHOWS THE COMPLETE STRUCTURE THE CONTRACTOR Storey

h/3
SHALL BE RESPONSIBLE FOR THE DESIGN OF ALL TEMPORARY BRACING SHORING AND FORM WORK THAT COVER :- level

MAY BE NECESSARY DURING CONSTRUCTION 1. CLEAR COVER TO REINFORCEMENT INCLUDING LINKS WILL BE AS FOLLOWS:- longitudinal bars structural of frame
beam over lap & stirrup spacing
FOUNDATIONS:- L
8. FOR SETTING OUT
- COLUMN LAYOUT DRAWING WITH ARCHITECTURAL DRAWINGS. SURFACES FACING EARTH.....................................................75 MM
L/3 L/3 L/3

OTHER SURFACES................................................................... 50 MM 50 50
9. USE Ø8/200 DISTRIBUTION BARS ON NEGATIVE BARS OF SLABS AND Ø16/110 ON MAT SLAB. 50Ø

COLUMNS,BEAMS:- Lapping structural of longitudinal


bars of frame columns
IN CONTACT WITH SOIL............................................................ 50 MM
REINFORCEMENT :-

hc/2
hc=Clear hight

50d/2 50d/2

50Ø
NOT IN CONTACT WITH SOI..................................................... 30 MM

H=Hight

hc/2
1. REINFORCEMENT FOR CONCRETE SHALL BE HIGH YIELD DEFORMED BARS TYPE II
WITH A MINIMUM YIELD STRESS OF 400 N/mm² for diameter < 10 & 2. BEAMS, SLABS AT G.F. Storey level

500 N/mm² for Ø10 and above . (FOR MORE DETAILS REFERE SPECIFICATION.) BOTTOM SURFACE & SIDE SURFACE...................................... 25 MM MIN. OR DIA OF BAR.

hc/2
hc=Clear hight
H=Hight

50d/2 50d/2
TOP SURFACE............................................................................. 25 MM MINIMUM OR DIA OF BAR

50Ø
2. MAXIMUM DOWN SIDE TOLERANCE ON AREA OF CROSS SECTION SHALL BE (-) 3%.

hc/2
3. FOR OTHER LEVELS :-
CONCRETE :- (fck /fck, cube): BEAMS....................................................................................... 25 MM MINIMUM OR DIA OF BAR
- LEAN CONCRETE.....................C-5 SLABS........................................................................................ 20 MM MINIMUM OR DIA OF BAR
- FOUNDATION............................C-30/37
RET. WALLS (EARTH FACE).................................................... 50 MM
- RETAINING WALL.....................C-25/30
RET. WALLS (OTHER FACE)....................................................30 MM
- SLAB..........................................C-25/30
- STAIR.........................................C-25/30 R.C.C. WALL ABOVE GR. LVL...................................................30 MM
- BEAMS.......................................C-25/30 4. FORMWORK SHALL BE OF STEEL, TIMBER OR OTHER APPROVED MATERIAL
- COLUMNS..................................C-30/37
AND SHALL BE SUFFICIENTLY WATERTIGHT TO PREVENT LOSS OF LIQUID/SLURRY/GROUT
- SHEAR WALL.............................C-30/37
FROM CONCRETE. GROUT LOSS TAPES SHALL BE USED AT VERTICAL
CONSTRUCTION JOINTS.
1. FOR ALL CONCRETE, MAXIMUM AGGREGATE SIZE SHALL BE 20 mm.
FOR OTHER INFORMATION AND MAXIMUM WATER CEMENT RATIO REFER TO SPECIFICATIONS.
CONCRETE SHALL HAVE A MAXIMUM WATER ABSORPTION OF 2%.
LOCATIONS OF LAPS:-
1. RAFT OR STRIP FOOTING:-
2. REFER SPECIFICATIONS FOR DURABILITY TESTS ON CONCRETE.
TOP BARS SHALL BE LAPPED AT COLUMNS / WALLS.
3. SLUMP AT SITE SHALL BE 75mm. MIN. AND 100mm MAXIMUM. BOTTOM BARS SHALL BE LAPPED AT MID SPAN .
MAXIMUM TEMPERATURE OF CONCRETE SHALL BE 30 DEGREES CENTIGRADE. 2. BEAMS AND SLABS
CHILLED WATER OR ICE SHALL BE USED TO COMPLY WITH THIS LIMIT.
TOP BARS SHALL BE LAPPED AT MIDSPAN. Yirga-lem Zegeye
Consulting Architects & Engineers

BOTTOM SHALL BE LAPPED AT SUPPORT. irga- lem


Architect & Planner
Tel. 251-011-6633963, 251-011-6633232, 251-0930-014282 [Link] CAE/ 198
Po. Box- Megenagna Leme MIXED USE BUILDING Matyas Builg.
3rd floor. E- mail :gyirgalemz@[Link]
C O N T E M P O R A R Y

D E S I G N

MIXED USE BULDING


ALEMAYEHU MELESSE
city - BOLE
Title Deed number -AA000060300390

ST
New Wereda-04
Block No-03

SINTAYEHU ABERA

SINTAYEHU ABERA
PPST/1140

PPST/1140
00/26