QUOTATION FOR CONSTRUCTION OF 75.50 MTRS X 12.
00 M
Sr.
Particular Unit
No.
1 Site Installation: (facilities, tools, plant, equipment etc)
1.1 site installation/mobalization Lump sum
1.2 Flight ticket & VISA Lump sum
all necessary safety measures and efforts to avoid accidents and
1.3 damages to the property. Lump sum
remove from the site all tools and plants, surplus materials,
rubbish, garbage, temporary constructions, and temporary work of
1.4 every kind and leave the whole site clean Lump sum
2 Earth work
ExcaExcavation in ordinary/hard rock for foundations of abutments and Lump sum
2.1 intermediate piers.
Backfilling around and behind the foundations, abutments & return
2.2 walls. Handling, loading, offloading, transportation, watering and Lump sum
all necessary works (in layers not more than 300mm thick and
compacted well with earth rammer or compactor) & Box pipe require as
per site conditions
2.3 Stone pitching (considered because of slope stability) Lump sum
3 Pilling, Reinforced Concrete, Plain Cement Concrete, Formworks and
Other Involved Works
3.1 Pilling
Main Pile Liner :- Welding & Driving MS cylindrical liners of thickness 8
mm for 900 mm Dia Piles up to non collapsible strata including welding
3.1.1 additional stiffener plates in all joints, 300mm to 500 mm width bottom MT
shoe, including gas cutting equipment , tools, welding machines,, fuel
etc., complete .Rate also including , unloading liner at site , shifting to
working location , driving of liners in true plumb &position on pile
location , in situ welding & Cutting etc all complete
Labour Cost (Fabrication And Errection)
3.1.2 Pile Drilling By Rig machine No.s
3.1.3 Marine Piles :- 900 mm Dia Concreting CUM
3.1.4 Marine Pile rebar MT
3.1.5 Labor Charges lump sum
3.2 Pile Cap
3.2.1 M15 PCC
3.2.2 M40 Concrete
3.2.3 Reinforcement
3.2.4 Shuttering
Labour Cost
3.3 Pier
3.3.1 Concrete
3.3.2 Reinforcement
3.3.3 Shuttering & scfolding
Labour Charges
3.4 Pier Cap
3.4.1 Concrete
3.4.2 Reinforcement
3.4.3 Shuttering & scfolding
Labour Charges
3.5 Girder
3.5.1 Steel Main Girder
3.5.2 Secondary Girder
3.5.3 Strut Bolt
3.5.4 Bracing
Bearing Plate
Labour (Fabrication, Errection, Rigging, Scaffholing, support system etc)
3.6 Deck Slab
3.6.1 Concrete
3.6.2 screed concrete or wearing coat
3.6.3 Drainage System
3.6.4 Reinforcement
3.6.5 Shuttering
labour (Fabrication, Errection, and placing concrete etc etc)
3.7 Railing
3.7.1 Concrete
3.7.2 Reinforcement
3.7.3 Shuttering
labour charges
3.9 Abutment Wall Pile Cap
3.9.1 PCC Abutment Wall Pile Cap
3.9.2 Concrete
3.9.3 Reinforcement
3.9.4 Shuttering
Labour
3.10 Abutment Wall
3.10.1 Concrete
3.10.2 Reinforcement
3.10.3 Shuttering
Labour
3.11 Precast Yard M30
3.12 Machinaries
2 CRANES OF 200 TONS CAPACITY
Other Machine Like Loader, Dumper, Excavator, Breaker, Dozer, RMC plant,
Transit Mixures
3.13 FUEL
3.14 MIS
3.15 CONTINGENCY
TMT 263.72
CONCRETE M40 1,230.51
CEMENT 553.73
SAND 380.59
AGGREGATE 277.39
STEEL MAIN GIRDER 168.00
SECONDARY GIRDER 63.84
BAERING PLATE 16
50 MTRS X 12.00 MTRS BRIDGE FOR ASHAPURA
By Using BY Conventional piling with bailor
BASED ON NEW
&Chisel Method
Qty Amount In Qty
Rate Amount In RS Rate
DOLLAR
1 8,300,000 8,300,000 100,000 1 8,300,000
20.00 960,000 19,200,000 231,325 20.00 960,000
1,000,000 1,000,000 12,048 1 1,000,000
1
500,000 500,000 6,024 1 500,000
1
1 1,700,000 1,700,000 20,482 1 1,700,000
1 2,850,000 2,850,000 34,337 1 8,246,880
1 3,212,698
22.53 201,641 4,542,653 54,731 28.16 201,641
454,265 16,419
16.00 800,000 12,800,000 154,217 28.00 800,000
81.39 34,943 2,843,969 34,265 130.02 34,943
23.45 136,950 3,211,562 38,694 88.86 136,950
1.00 605,553 605,553 7,296 1.00 1,671,220
33.60 18,343 616,325 7,426 6.51 18,343
403.20 34,943 14,089,018 169,747 78.62 34,943
34.14 136,950 4,675,372 56,330 6.89 136,950
128.00 10,000 1,280,000 15,422 74.24 10,000
2,066,071 24,892
75.36 34,943 2,633,304 31,727 28.85 34,943
14.90 136,950 2,040,134 24,580 11.07 136,950
150.72 10,000 1,507,200 18,159 57.70 10,000
618,064 7,447
115.20 34,943 4,025,434 48,499 57.16 34,943
29.00 136,950 3,970,887 47,842 17.15 136,950
160.00 5,000 800,000 9,639 160.00 5,000
879,632 10,598
168.00 264,000 44,352,000 534,361 168.00 264,000
63.84 227,000 14,491,680 174,599 63.84 227,000
1.68 193,600 325,248 3,919 1.68 193,600
10.08 193,600 1,951,488 23,512 10.08 193,600
16.00 130,000 2,080,000 25,060 16.00 130,000
12,224,083 147,278
252 34,943 8,805,636 106,092 226.50 34,943
70 18,343 1,284,010 15,470 49.08 18,343
100 2,500 250,000 3,012 100.00 2,500
75.6 136,950 10,353,420 124,740 45.30 136,950
70 1,000 70,000 843 70.00 1,000
2,076,307 25,016
33.60 34,943 1,174,085 14,146 33.60 34,943
5.71 136,950 781,412 9,415 6.72 136,950
336.00 1,500 504,000 6,072 336.00 1,500
245,950 2,963
11.28 18,343 206,909 2,493 11.81 18,343
135.36 34,943 4,729,884 56,987 189.00 34,943
40.61 136,950 5,561,266 67,003 16.09 136,950
80.16 5,000 400,800 4,829 129.60 5,000
1,089,886 13,131
134.40 34,943 4,696,339 56,582 169.47 34,943
40.32 136,950 5,521,824 66,528 50.84 136,950
672.00 5,000 3,360,000 40,482 672.00 5,000
1,357,816 16,359
250.00 26,643 6,660,750 80,250 500.00 26,643
1.00 9,960,000 9,960,000 120,000 1.00 9,960,000
1.00 19,920,000 19,920,000 240,000 1.00 19,920,000
1.00 2,500,000 2,500,000 30,120 1.00 2,500,000
1.00 5,000,000 5,000,000 60,241 1.00 5,000,000
1.00 5,000,000 5,000,000 60,241 1.00 5,000,000
274,144,236 3,302,943
As per new drawing
MT TMT 242.92 MT
CUM CONCRETE M40 913.22 CUM
TON CEMENT 410.95 TON
CUM SAND 282.46 CUM
CUM AGGREGATE 205.87 CUM
MT STEEL MAIN GIRDER 168.00 MT
MT SECONDARY GIRDER 63.84 MT
No's BAERING PLATE 16 No's
BASED ON NEW DRAWING
Amount In
Amount In RS
DOLLAR
8,300,000 100,000
19,200,000 231,325
1,000,000 12,048
500,000 6,024
1,700,000 20,482
8,246,880 99,360
1 5.5 30 13
3,212,698 38,707 2 2.75 5.5 30
5,678,316 68,413
567,832 20,524
22,400,000 269,880
4,543,240 54,738
12,168,961 146,614
1,671,220 20,135
119,450 1,439
2,747,358 33,101
944,131 11,375
742,400 8,945
455,334 5,486
1,008,056 12,145
1,515,982 18,265
576,972 6,951
310,101 3,736
1,997,412 24,065
2,348,501 28,295
800,000 9,639
514,591 6,200
44,352,000 534,361
14,491,680 174,599
325,248 3,919
1,951,488 23,512
2,080,000 25,060
12,224,083 147,278
7,914,590 95,357
900,183 10,846
250,000 3,012
6,203,835 74,745
70,000 843
1,533,861 18,480
1,174,085 14,146
920,304 11,088
504,000 6,072
259,839 3,131
216,594 2,610
6,604,227 79,569
2,203,899 26,553
648,000 7,807
967,272 11,654
5,921,790 71,347
6,962,675 83,888
3,360,000 40,482
1,624,447 19,572
13,321,500 160,500
9,960,000 120,000
19,920,000 240,000
2,500,000 30,120
5,000,000 60,241
5,000,000 60,241
282,635,035 3,405,241
9
2145 1 9 60 14 7560
907.5 2 4.5 9 60 4860
3052.5 12420 99360
0.4 2 60 12.6 604.8 3212698
5312
8,246,880.00
1 Site Installation: (facilities, tools, plant, equipment etc) No's
1.1 site installation -(mobalization of manpower & flight ticket Visa & all)
1.2 access roads
1.3 construction site
1.4 laborers camp
all necessary safety measures and efforts to avoid accidents and
1.5 damages to the property.
sufficient labour camp with properly maintained sanitary
1.6 facilities, drinking water and supply of electricity
1.7 a temporary drainage system at the site.
remove from the site all tools and plants, surplus materials,
rubbish, garbage, temporary constructions, and temporary work of
1.8 every kind and leave the whole site clean
2 Earth work
ExcaExcavation in ordinary/hard rock for foundations of abutments and
2.1 intermediate piers.
Backfilling around and behind the foundations, abutments & return
walls. Handling, loading, offloading, transportation, watering and
all necessary works (in layers not more than 300mm thick and
2.2 compacted well with earth rammer or compactor)
Providing and laying coarse gravel (filter layer) behind the
Abutments and return walls
3 Pilling, Reinforced Concrete, Plain Cement Concrete, Formworks and
Other Involved Works
3.1 Pilling
Main Pile Liner :- Welding & Driving MS cylindrical liners of thickness 8
mm for 900 mm Dia Piles up to non collapsible strata including welding
3.1.1 additional stiffener plates in all joints, 300mm to 500 mm width bottom
shoe, including gas cutting equipment , tools, welding machines,, fuel
etc., complete .Rate also including , unloading liner at site , shifting to
working location , driving of liners in true plumb &position on pile
location , in situ welding & Cutting etc all complete 16
3.1.2 Pile Drilling By Rig machine 16
3.1.3 Marine Piles :- 900 mm Dia Concreting 16
3.1.4 Marine Pile rebar
3.1.5 Labor Charges
3.2 Pile Cap
3.2.1 M15 PCC 4
3.2.2 M25 Concrete 4
3.2.3 Reinforcement
3.2.4 Shuttering
4
4
3.3 Pier
3.3.1 Concrete 4
3.3.2 Reinforcement
3.3.3 Shuttering 4
3.4 Pier Cap
3.4.1 Concrete 2
3.4.2 Reinforcement
3.4.3 Shuttering
6
4
3.5 Girder
3.5.1 Steel Main Girder 4
3.5.2 Secondary Girder
3.5.3 Strut Bolt
3.5.4 Bracing
3.6 Deck Slab
3.6.1 Concrete 1
3.6.2 screed concrete or wearing coat 1
3.6.3 Drainage System PVC
3.6.4 Reinforcement
3.6.5 Shuttering 2
3.7 Railing
3.7.1 Concrete 2
3.7.2 Reinforcement
3.7.3 Shuttering 4
3.8 Labour charges
3.9 Abutment Wall Pile Cap
3.9.1 PCC 2
3.9.2 Concrete 2
3.9.3 Reinforcement
3.9.4 Shuttering
4
4
3.10 Abutment Wall
3.10.1 Concrete 4
3.10.2 Reinforcement
3.10.3 Shuttering 8
3.11 Precast Yard M30 & Girder Fabrication Yard 2
3.12 Machinaries
Crane For 1 crane 6 months, seond crane 3 months
Other Machine
3.13 FUEL
3.14 MIS
3.15 CONTINGENCY
length bredth Height Total Remarks
3.14 0.45 8 22.52841984
16
3.14 0.45 8 81.3888 length numbr
23.450617092 8.5 30
2.826 95.2
2.826 16
14 6 0.1 33.6
14 6 1.2 403.2
34.14
128 legth number
14 1.6 89.6 8.4 117
6 1.6 38.4 16.4 50.0
40 4
3.14 1 6 75.36 4 56
14.896924444
3.14 1 6 150.72
length number
6 73
12 2.4 2 115.2 6.28 48.0
29.00 6.28 12
160
12 2 144
2 2 16
70 168 0.6
63.84 38% of Main girder
1.68 1% of Main girder
10.08 6% of Main girder
length number
75.5 12 0.25 226.5 75 68.57143
75.5 10 0.05 37.75 12.5 428.6
100 75 68.57143
36.60 12.5 428.6
70 0.5 70
70 0.2 1.2 33.6 length number
5.7058201058 75 26.66667
70 1.2 336 3 428.6
12 6.3 0.1 15.12
12 6.3 1.2 181.44
54.432
87.84
12 1.2 57.6
6.3 1.2 30.24
12 0.4 7 134.4
40.32
12 7 672
50 50 0.1 500
No's kg/m total weighoverall
16 3.858025 15740.74
16 0.617284 2658.201
16 1.580247 1143.239
19542.18
No's kg/m total weighoverall
4 3.858025 15123.46
4 3.858025 12654.32
4 0.617284 395.0617
2 0.617284 276.5432
28449.38
No's kg/m total weighoverall length number No's kg/m
4 6.320988 11074.37 14 13 1 6.320988
4 0.888889 1071.787 14 13 5 1.580247
4 0.888889 267.9467 13 13 5 0.888889
12414.1 14 13 1 3.858025
2.8 67 2 6.320988
2.4 67 5 1.580247
2.4 67 5 0.888889
14 67 1 3.858025
No's kg/m total weighoverall
1 2.469136 12698.41
1 1.580247 8465.608
1 0.888889 4571.429
1 0.888889 4761.905
30497.35
No's kg/m total weighoverall
2 0.617284 2469.136
2 0.888889 2285.714
4754.85
total weighoverall
1179.918
1474.897
770.3704
720.1646
2359.835
1264.198
711.1111
3600.823
12081.32 24162.63
1 Site Installation: (facilities, tools, plant, equipment etc) No's
1.1 site installation -(mobalization of manpower & flight ticket Visa & all)
1.2 access roads
1.3 construction site
1.4 laborers camp
all necessary safety measures and efforts to avoid accidents and
1.5 damages to the property.
sufficient labour camp with properly maintained sanitary
1.6 facilities, drinking water and supply of electricity
1.7 a temporary drainage system at the site.
remove from the site all tools and plants, surplus materials,
rubbish, garbage, temporary constructions, and temporary work of
1.8 every kind and leave the whole site clean
2 Earth work
ExcaExcavation in ordinary/hard rock for foundations of abutments and
2.1 intermediate piers.
Backfilling around and behind the foundations, abutments & return
walls. Handling, loading, offloading, transportation, watering and
all necessary works (in layers not more than 300mm thick and
2.2 compacted well with earth rammer or compactor)
1
2
Providing and laying coarse gravel (filter layer) behind the
Abutments and return walls
3 Pilling, Reinforced Concrete, Plain Cement Concrete, Formworks and
Other Involved Works
3.1 Pilling
Main Pile Liner :- Welding & Driving MS cylindrical liners of thickness 8
mm for 900 mm Dia Piles up to non collapsible strata including welding
3.1.1 additional stiffener plates in all joints, 300mm to 500 mm width bottom
shoe, including gas cutting equipment , tools, welding machines,, fuel
etc., complete .Rate also including , unloading liner at site , shifting to
working location , driving of liners in true plumb &position on pile
location , in situ welding & Cutting etc all complete
12
16
3.1.2 Pile Drilling By Rig machine 28
3.1.3 Marine Piles :- 900 mm Dia Concreting
12
16
3.1.4 Marine Pile rebar
3.1.5 Labor Charges
3.2 Pile Cap
3.2.1 M15 PCC 2
3.2.2 M25 Concrete 2
3.2.3 Reinforcement
3.2.4 Shuttering
4
4
3.3 Pier
3.3.1 Concrete 2
3.3.2 Reinforcement
3.3.3 Shuttering 2
3.4 Pier Cap
3.4.1 Concrete 2
3.4.2 Reinforcement
3.4.3 Shuttering
6
4
3.5 Girder
3.5.1 Steel Main Girder 4
3.5.2 Secondary Girder
3.5.3 Strut Bolt
3.5.4 Bracing
3.6 Deck Slab
3.6.1 Concrete 1
3.6.2 screed concrete or wearing coat 1
3.6.3 Drainage System PVC
3.6.4 Reinforcement
3.6.5 Shuttering 2
3.7 Railing
3.7.1 Concrete 2
3.7.2 Reinforcement
3.7.3 Shuttering 4
3.8 Labour charges
3.9 Abutment Wall Pile Cap
3.9.1 PCC 2
3.9.2 Concrete 2
3.9.3 Reinforcement
3.9.4 Shuttering
4
4
3.10 Abutment Wall
3.10.1 Concrete
3.10.2 Reinforcement
3.10.3 Shuttering 8
3.11 Precast Yard M30 & Girder Fabrication Yard 2
3.12 Machinaries
Crane For 1 crane 6 months, seond crane 3 months
Other Machine
3.13 FUEL
3.14 MIS
3.15 CONTINGENCY
length bredth Height Total Remarks
12420 8246880
9 60 14 7560
4.5 9 60 4860
28.1605248
3.14 0.45 6 12.67223616 PC-2,3
3.14 0.45 5.5 15.48828864 PC-1,4
28 length numbr
130.018608 6 64
3.14 0.45 6.2 47.30724 PC-2,3
3.14 0.45 8.13 82.711368 PC-1,4
88.856961593 2.826 40.0
2.826 12
4.4 7.4 0.1 6.512 PC-2,3 legth number
4.2 7.2 1.3 78.624 PC-2,3 9.6 14
6.8939851852 9.6 14.0
74.24 6.6 57.6
4.4 1.6 28.16 22.8 10.4
7.2 1.6 46.08
3.14 0.95 5.09 28.848593 length number
11.069603081 6 32
3.14 0.95 5.09 57.697186 5.966 40.0
5.966 18
area
13.61 2.1 0 57.162
17.1486
160
12 2 144
2 2 16
70 168
63.84 38% of Main girder
1.68 1% of Main girder
10.08 6% of Main girder
75.5 12 0.25 226.5
75.5 10 0.065 49.075
100
45.3
70 0.5 70
70 0.2 1.2 33.6
6.72
70 1.2 336
legth number
12.3 4.8 0.1 11.808 4.2 32
12 4.5 1.75 189 12 32.0
16.092728889 8.1 80
129.6 15.6 28
12 2 96
4.2 2 33.6
169.47
50.841 0.4 1.4
12 7 672 1 3.5
50 50 0.1 500
3.95
3.555 1.58
No's kg/m total weight overall length numbr No's kg/m total weigh
12 3.858025 17777.7778 8.13 64 16 6.320988 52622.98
12 0.617284 837.333333 2.826 54.2 16 0.617284 1512.782
12 1.580247 643.072 2.826 16.26 16 0.888889 653.5219
19258.1831 74047.47 54789.28
No's kg/m total weight overall
2 6.320988 1699.08148
2 2.469136 663.703704
4 1.580247 2402.98667
2 1.580247 749.416296
5515.18815
No's kg/m total weight overall
2 6.320988 2427.25926
28 0.617284 4124.64198
28 0.888889 2672.768
9224.66923
0.6
% of Main girder
% of Main girder
% of Main girder
No's kg/m total weight overall
2 6.320988 1699.08148
2 6.320988 4854.51852
4 1.580247 4096
4 1.580247 2761.00741
13410.6074
7.37 12 88.44 7.37 12 88.44
5 2 5.6 0.4 1.4 5 2 5.6
0.4 2 2.8 1 3.5 0.4 2 2.8
96.84 169.47
0.8
5.135
overall