Dewjaan Substation Test Schedule

Uploaded by

mdtazuddin882
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

Dewjaan Substation Test Schedule

Uploaded by

mdtazuddin882
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

ANNEX I

Pre-commissioning Test Schedule


Name of the Substation: Dewjaan 33/11kV Substation, BPDB.
Month November
Sl Test Test
Test Items 1 2 2 Witness By
No. Day/ Date 12 13 14 15 16 18 19 20 21 22 23 24 Equipment Team
7 5 6
2 Power Transformer (TR-1, TR-2) Test Multimeter,
Detailed Specification & Installation Completion Clip on
2.1 Meter
Check
Insulation
2.2 Test as per Form 2 Tester
CPC-100
3 CT and PT Test (33 kV & 11 kV) Insulation Team 1
Detailed Specification & Installation Completion Tester
3.1 Check CPC 100
3.2 Test as per Form 2 CT Analyzer

4 DC System and Earthing System Test


Detailed Specification & Installation Completion Multimeter
4.1 Check Earth
[Link]
4.2 Test as per Form 2
Busbar, Cable, Conductor, LA, Insulator Contact Resis. Team 3
5 Tester
Test (33 kV & 11 kV)
Insulation
Detailed Specification & Installation Completion
5.1 Check
Tester
Hipot
5.2 Test as per Form 2 Tester
Isolator and Earth Switch Test (33 kV & 11 Contact Resis.
6 Tester
kV)
Detailed Specification & Installation Completion Insulation Team1
6.1 Check Tester
Hipot
6.2 Test as per Form 2 Team3
Tester
8 Protection Relay Test (33 kV & 11 kV) Team2
8.1 Detailed Specification & Installation Completion CMC 356
Month November
Sl Test Test
Test Items 1 2 2 Witness By
No. Day/ Date 12 13 14 15 16 18 19 20 21 22 23 24 Equipment Team
7 5 6
Check
8.2 Test as per Form 2
PCM Panel and Switchgear Panel Test (33 Team2
9
kV & 11 kV)
Insulation
Detailed Specification & Installation Completion
9.1 Check
Tester
Multimeter
9.2 Test as per Form 2
All Pre-commissioning Test Completion
11
Check
12 Pre-commissioning Test Report Submission

Team-1 Primary testing (all equipment test)


Team-2 Secondary Test ( Relay, Control & Protection
Team-3 Hi-Pot Test
Team-4 Operation check and co-ordination