Abstract of Cost for Pipe Drain Works
Abstract of Cost for Pipe Drain Works
Contract Identification No :
BH No :
Nature of the work :
Name of Road :
Collection rate of 'Aggregate 13.2 mm' is taken as default for all types of AGGREGATE
Collection rate of 'Collection, quarrying and sieving sand in local river' is taken as default for all types of SAND
For Loading and Unloading:
Manual Loading is taken as default for AGGREGATES, SANDS, RUBBLES and WOODS
Abstract of Cost Page 1 of 19
Government of Nepal
Ministry of Physical Infrastructure & Transport
Department of Roads
[Branch/Directorate/FHSMO]
[Division/Project Office]
Abstract Of Cost
Contract Identification No :
BH No :
Nature of the work :
Name of Road :
Rate Amount
S.N. Description of Works Unit Quantity Remarks
(NRs) (NRs)
1 General
Providing, jointing and laying HDPE pipes with or without collar etc. complete
1.1 in place as per Drawing and Technical Specifications., a) 110 mm/125 mm outer meter 0 299.32 0
dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.2 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 0 469.73 0
Specifications., 300 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.3 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 0 546.93 0
Specifications., 450 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.4 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 0 6413.62 0
Specifications., 600 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.5 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 0 702.23 0
Specifications., 900 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.6 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 0 873.68 0
Specifications., 1000 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.7 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 0 1093.86 0
Specifications., 1200 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.8 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 0 469.73 0
Technical Specifications., 300 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.9 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 0 546.93 0
Technical Specifications., 450 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.10 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 0 7375.66 0
Technical Specifications., 600 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.11 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 0 702.23 0
Technical Specifications., 900 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.12 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 0 873.68 0
Technical Specifications., 1000 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.13 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 0 1093.86 0
Technical Specifications., 1200 mm internal dia.
Providing and laying concrete channeling as per Drawing and Technical
1.14 0 0 0
Specifications., Cast in situ
Providing and laying concrete channeling as per Drawing and Technical
1.15 0 0 0
Specifications., Pre cast
1.16 Laying (Joining) of Precast concrete panel meter 0 276.24 0
Quantity Sheet
Contract Identification No :
BH No :
Nature of the work :
Name of Road :
Length Breadth Height
S.N. Description of Works Unit No. Quantity Remarks
(m) (m) (m)
1 General
Providing, jointing and laying HDPE pipes with or without collar etc. complete
1.1 in place as per Drawing and Technical Specifications., a) 110 mm/125 mm outer meter
dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.2 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter
Specifications., 300 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.3 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter
Specifications., 450 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.4 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter
Specifications., 600 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.5 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter
Specifications., 900 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.6 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter
Specifications., 1000 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
1.7 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter
Specifications., 1200 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.8 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter
Technical Specifications., 300 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.9 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter
Technical Specifications., 450 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.10 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter
Technical Specifications., 600 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.11 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter
Technical Specifications., 900 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.12 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter
Technical Specifications., 1000 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
1.13 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter
Technical Specifications., 1200 mm internal dia.
Providing and laying concrete channeling as per Drawing and Technical
1.14
Specifications., Cast in situ
Providing and laying concrete channeling as per Drawing and Technical
1.15
Specifications., Pre cast
1.16 Laying (Joining) of Precast concrete panel meter
Total : 0
Specificati
Norms
S.N. on Clause Description Unit Rate (NRs)
No
No.
Providing, jointing and laying HDPE pipes with or without collar etc. complete
1 7.1.A 701 in place as per Drawing and Technical Specifications., a) 110 mm/125 mm outer meter 299.32
dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
2 7.2.A 701 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 469.73
Specifications., 300 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
3 7.2.B 701 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 546.93
Specifications., 450 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
4 7.2.C 701 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 6413.62
Specifications., 600 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
5 7.2.D 701 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 702.23
Specifications., 900 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
6 7.2.E 701 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 873.68
Specifications., 1000 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for
7 7.2.F 701 culverts including fixing with cement mortar 1:2 as per Drawing and Technical meter 1093.86
Specifications., 1200 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
8 7.3.A 701 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 469.73
Technical Specifications., 300 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
9 7.3.B 701 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 546.93
Technical Specifications., 450 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
10 7.3.C 701 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 7375.66
Technical Specifications., 600 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
11 7.3.D 701 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 702.23
Technical Specifications., 900 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
12 7.3.E 701 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 873.68
Technical Specifications., 1000 mm internal dia.
Providing and Laying Reinforced cement concrete NP3 Collar jointed pipe for
13 7.3.F 701 culverts including fixing collar with cement mortar 1:2 as per Drawing and meter 1093.86
Technical Specifications., 1200 mm internal dia.
Providing and laying concrete channeling as per Drawing and Technical
14 7.4.A 702 0
Specifications., Cast in situ
Providing and laying concrete channeling as per Drawing and Technical
15 7.4.B 702 0
Specifications., Pre cast
16 7.4.C 702 Laying (Joining) of Precast concrete panel meter 276.24
Loading/Unloading Mechanical
S.N. Description Unit Loader Tipper Total
1 Gravel cum 0.060 0.060 283.9
2 Sand cum 0.060 0.060 283.9
3 Rubble cum 0.140 0.140 662.5
4 Aggregate cum 0.140 0.140 662.5
Loading/Unloading Manual
Unskille
S.N. Description Unit Skilled Truck Tipper Total
d
1 Cement tonne 0.200 0.000 0.200 0.000 571.0
1000
2 Bricks 0.000 0.000 0.000 0.000 1.0
Nos.
3 Bitumen Drums tonne 0.150 0.000 0.150 0.000 428.3
4 Timber tonne 0.270 0.003 0.200 0.000 618.1
5 C.C. Blocks, Kerb, etc. cum 0.400 0.050 0.300 0.000 955.0
6 Steel tonne 0.200 0.000 0.200 0.000 571.0
7 Gravel cum 0.136 0.000 0.000 0.136 305.5
8 Sand cum 0.136 0.000 0.000 0.136 305.5
9 Rubble cum 0.136 0.000 0.000 0.136 305.5
10 Aggregate cum 0.136 0.000 0.000 0.136 305.5
d 750 mm dia RCC Hume pipe meter 0.080 0.020 0.040 0.040 286.1
e 600 mm dia RCC Hume pipe meter 0.080 0.020 0.040 0.040 286.1
f 450 mm dia RCC Hume pipe meter 0.080 0.020 0.040 0.040 286.1
h 300 mm dia RCC Hume pipe meter 0.053 0.013 0.027 0.027 190.7
d 750 mm dia RCC Hume pipe meter 0.040 0.020 0.020 0.020 150.0
e 600 mm dia RCC Hume pipe meter 0.040 0.020 0.020 0.020 150.0
f 450 mm dia RCC Hume pipe meter 0.040 0.020 0.020 0.020 150.0
h 300 mm dia RCC Hume pipe meter 0.027 0.003 0.013 0.013 92.6
d 750 mm dia RCC Hume pipe meter 0.165 0.012 0.160 468.4
e 600 mm dia RCC Hume pipe meter 0.165 0.012 0.160 468.4
f 450 mm dia RCC Hume pipe meter 0.137 0.008 0.107 329.9
g 300 mm dia RCC Hume pipe meter 0.137 0.008 0.107 329.9
Collectio
S.N. Description Unit Washing Amount Remarks Washing
n
Gravel
a 5 mm - 70 mm cum 1318.4 0 1318.4 Without Washing
b 40 mm cum 1977.6 0 1977.6 Without Washing
c 20 mm cum 2636.8 0 2636.8 Without Washing
d 8 mm cum 3955.2 0 3955.2 Without Washing
e 40 mm - 70 mm cum 2636.8 0 2636.8 Without Washing
f 70 mm - 100 mm cum 1977.6 0 1977.6 Without Washing
Sand
a Quarry output less than 33% cum 2636.8 0 2636.8 Without Washing
b Quarry output 33 - 66% cum 1977.6 0 1977.6 Without Washing
c Quarry output more than 66% cum 988.8 0 988.8 Without Washing
Collection, quarrying and sieving
d cum 988.8 0 988.8 Without Washing
sand in local river
3 Rubble cum 922.88 0 922.9 Without Washing
4 Aggregate cum 922.9 0 922.9 Without Washing
a 70 mm - 100 mm cum 922.9 0 922.9 Without Washing
b 40 mm - 70 mm cum 922.9 0 922.9 Without Washing
c 20 mm - 40 mm cum 922.9 0 922.9 Without Washing
d 10 mm - 20 mm cum 922.9 0 922.9 Without Washing
e 10 mm cum 922.9 0 922.9 Without Washing
Mechanical
a 13.2 mm cum 1429.91 0 1429.9 Without Washing
b 20 mm cum 1283.272 0 1283.3 Without Washing
c 40 mm cum 1142.547 0 1142.5 Without Washing
Collection
Unskille
S.N. Description Unit Rate Amount
d
Gravel
a 5 mm - 70 mm cum 2.060 640 1318.4
b 40 mm cum 3.090 640 1977.6
c 20 mm cum 4.120 640 2636.8
d 8 mm cum 6.180 640 3955.2
e 40 mm - 70 mm cum 4.120 640 2636.8
f 70 mm - 100 mm cum 3.090 640 1977.6
Sand
a Quarry output less than 33% cum 4.120 640 2636.8
b Quarry output 33 - 66% cum 3.090 640 1977.6
c Quarry output more than 66% cum 1.545 640 988.8
Collection, quarrying and sieving
d cum 1.545 640 988.8
sand in local river
Washing
Unskille
S.N. Description Unit Rate Amount
d
1 Gravel cum 0.515 640 329.600
2 Sand cum 0.515 640 329.600
3 Rubble cum 0.206 640 131.840
4 Aggregate cum 0.210 640 134.400
Tipper
ER GR BT ER GR BT 1600
rate:
Coefficient/Distance(km) 0.09 0.06 0.045 0.18 0.12 0.09
Sub-Total :
VAT 13% :
Grand Total with VAT:
The numbers in parenthesis [ ] represent the respective Specification number. Address and Telephone No:
Seal :
Date :
PPMO Bill of Quantities Page 1 of 19
Provisional Sum
P.S. 1.0 1.0
#[XXX0001]
Providing, jointing and laying HDPE pipes with or without collar etc.
General complete in place as per Drawing and Technical Specifications., a) meter 0.0 299.3
110 mm/125 mm outer dia.