0% found this document useful (0 votes)
1K views2 pages

NHAI Circular 06.01.2020

Uploaded by

billing.ho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views2 pages

NHAI Circular 06.01.2020

Uploaded by

billing.ho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

J1

�l<ffill <l�lli {i&i'"lllf � ¥'qflf /Phone: 91-11-25074100/25074200


� qftchH afu: � �) $ffl I Fax: 91-11-25093507 / 25093514
National Highways Authority of India
(Ministry of Road Transport and Highways)
�-5 � 6, WITT-10, �. � �-110015
G-5 & 6, Sector-10, Dwarka, New Delhi-110075

TOP PRIORITY
NHAI/IT/29/2020/, 06 January 2020
To

All CGMs/GMs/ROs/PIUs

SUB: EOT DRIVE: EPC Projects - Worksheet for Delay in Handing Over of Land

Chairman-NHAI has directed to clear all pending Extension of Time cases by


15 th January 2020. As such the drive has been launched for clearance all the
Extension of Time cases where scheduled completion date has been lapsed or last,
project mile stone has lapsed as on 3pt December 2019.

2. An excel worksheet for capturing the delay in handing over of land is enclosed
herewith for EPC project. All ROs/Project Directors are requested to complete the
worksheet and submit it to HQ immediately.

3. A web portal for capturing the above field of worksheet is also being
prepared, you can submit the details required as per Excel worksheet on the above
portal directly. The portal can be accessed through NHAI website using hyper link
EOT PROFORMA ICON on Home Desk of NHAI website [Link].

..
.........--=1 esh Srivastava)
CGM (IT)

Encl: An excel worksheet for capturing the delay in handing over of Land.

Copy to:

1. PPS to Chairman
2. PPS to Member (Fin./Admn.)
3. PPS to Member (P)
4. Web Admn.

You might also like