Aniq Building Project Report.

Sample project report

Uploaded by

daniel akomolafe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views9 pages

Aniq Building Project Report.

Sample project report

Uploaded by

daniel akomolafe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

CONSTRUCTION PROGRESS REPORT NO.

5 EMMANUEL OKOTETE CLOSE


IROKO AWE ORILE ILASAN LEKKI
Date Issued: 20th July, 2024

Project No. 1

Prepared For:
MR DAMILOLA AKINWUMI
CEO DAPPER’S GROUP

July 21, 2024


RE: ANIQ BUILDING 5 EMMANUEL OKOTETE CLOSE, IROKO AWE
ILASAN LEKKI LAGOS.

ENGINEER Project No. 001

Dear Mr. Damilola

Submitted herewith is one electronic copy of our current Construction Progress


Report for the above referenced project for the last 3 weeks.

If you have any questions or should you require any additional information,
please contact this office.

Very truly yours,


Engineer.
Akomolafe Daniel.
GENERAL INFORMATION

Report By: Engineer Daniel Akomolafe

Date: July 21, 2024

Project Name: ANIQ BUILDING

Project Address.: 5 Emmanuel Okotete close.


Iroko Awe Ilasan Lekki Lagos
Report Number: 2

Observation Date: July 20, 2024

Site Work

The site conditions are predominately dry; however, access in and around the
site and productivity appears relatively unaffected.
The main entrance proposed gate closer to the last house end of the close is still
blocked with the refuse bin of the last compound of the close.
The screed has began from the Grand floor upward .

Finish Carpentry

No work has been done to date.

Subframe

Subframe installation is complete at all floors. Doors can be installed when tiles
are done
Construction Progress Report 2 Client
Project No. 1134 Summer Place Phase 1
Terrace roof partition

The Partitioning is 100% complete except otherwise requested..


The Plastering is at a mid stage on the terrace.

Doors and Hardware


Not yet done… subframe done

Windows and Window Coverings

All windows fabricated and installed up to 80%

Finishes and Sheetrock

Screeding Started

Finishes and Paint

Screeding started

Finishes Flooring

No work has been done, We are waiting for tiles to come

Fire/Sprinkler Alarm

Installation in progress

Specialty

Smoke extractor pipes installed

Equipment

No work has been done to date.

Cabinets and Countertops

Construction Progress Report 3 Client


Project No. 1134 Summer Place Phase 1
No work has been done to date.

Mechanical Plumbing

Plumbing waste and vent lines are mostly complete in the building. Water lines
are complete on the first floor and in progress on the second floors. Corrections
has been done on necessary places but still not completed. But all plumbing
work is at 85% completion

Electrical
Rough electrical is in progress and in various stages of completion at Building
Work includes box mounting, wiring, and service panel installation is at top
stage

CONSTRUCTION STATUS

Quality of Construction:

a. Status: Appears adequate and within industry


standards
b. Construction Defects: None observed

Site Protection Methods:

a. The site has a new security now. And partial sink/wooden gate is
erected to secure the compound.

Permits: Non of the building documents is sighted by me. So I can’t write


about the permits issue.

Certificate of Occupancy Status: not Sited

Comments: the progress is at good pace but not as proposed earlier due to late
funding but we move at a very good and fast pace when funding surfaces

Material Testing: Not applicable this period. That will be next week.(pressure
test)

Construction Progress Report 4 Client


Project No. 1134 Summer Place Phase 1
TABLE A

DESCRIPTION NEXT WEEK 22nd LAST WEEK 15th TW


to 27th. July 2024 to 20th July 2024 AG
Jul
TEMPORARY 1. POP 14.Scarfold
WORK, continue extension
CONCRETE and will be for the roof
WORK AND completed. terrace
MANSORY 2. Wiring will parapet in
WORK . continue progress.
CARPENTERY and will be 15.Brick
WORKS, completed setting
MECHANICAL 3. Sanitary completed
AND wares 16.Correction
ELECTRICAL installation continue on
WORKS. will necessary
continue sections
and will be 17.The gate
GENERAL completed house
WORKS. 4. All parapet
plastering done
will be 18.Internal
completed Plastering at
except the 95%
right completion
elevation due to the
5. Screeding corrections
will on the 3rd
continue floor.
6. Painting 19.Rooftop
will Partitioning
commence completed
7. All 20.Subframe
glassware Completed.
will be 21.Plumbing
installed work on the
except the corrected
staircase section in
8. CCTV, Directors
Construction Progress Report 5 Client
Project No. 1134 Summer Place Phase 1
Intercom office
Cable completed
installation 22.Windows
will be installed.
completed 23.Improvising
9. Fittings may of surface
likely pump for
commenced pumping of
if the water.
financial 24.General
implication cleaning of
are met. the building
10.Dressing starts
and
corrections
continued
11.Bio digest
likely to
start work .
12.Gate
fabrication
needed to
start if the
fund on
ground can
meet up.
13.Compound
landscaping
can start if
funding
meets the
demand.
SAFETY All safety
STATUS precautions
observed.

Overall 80 % will be met 40% 15%


percentage done if all tasks here
goes as planned
Construction Progress Report 6 Client
Project No. 1134 Summer Place Phase 1
Percentage plan 80% 90%

Construction Progress Report 7 Client


Project No. 1134 Summer Place Phase 1
SCHEDULE SUMMARY

Contract Completion Date:


Engineer’s Estimated Completion Date: July-August 2024
Developer ‘s Estimated Completion Date: July 2024
Total Overall % of Work including this
60%
Application:
Scheduled Overall % of Work for this
80%
Application:
Reason for Delay: N/A
Comments:
a. Weather was favorable
b. A Progress table is provided that represents the percentage of completion as it
relates to the required, scheduled and actual completion dates. See table
c. Some materials needed where not available due to fund. I.e.TILES, iron for
the spiral staircase and gate house
d. Based on the progress observed, it appears that the project will be complete
later than originally represented. According to the site developer and client, a
projected completion date of July is what we target
Manpower Adequacy by Trade:
Adequate work was observed on site. Trades present during the time of inspection
include concrete, mechanical, electrical, plumbing and carpentry
CONSULTANT CERTIFICATION

This report is addressed to CLIENT only. This report has no other purpose and
may not be relied upon by any other person or entity without the written consent of
Engineer.

Engineer

Akomolafe Idowu Daniel


_____________________

Construction Progress Report 8 Client


Project No. 1134 Summer Place Phase 1
Resident Engineer

Construction Progress Report 9 Client


Project No. 1134 Summer Place Phase 1