Document Review Respose Form
RSG-DC-FRM-0002
RED_SEA_PROJECT
General Information
Program Name Lo5 Project Code R03-C10C01
Project Name Construction of Tutle bay canteens Report No. 1
Contractor Al-Masar Al-Hadeeth Report Date 9-Jan-2024
Contract No. R03-C10C01
DRF Ref. No.: DRF Rev. : C1 Project Stage: Construction
Engineer in Charge: RSG DRF Date: 9-Jan-2024 Discipline: Civil
Doc or Dwg Title:
The document(s) reviewed under this DRF, were issued "For Review and Comments" under Transmittal Ref- , dated on 30-Nov-2024, and are hereby return to the issuer with
the following return code and actions request.
(Overall return code will be worst among individual assessment code below)
Assessment Code
A= Accepted B= Accepted with Comments C = Revise and Resubmit D = Rejected
Supervision Consultant / RSG (Red Sea Global) Contractor Supervison Consultant
Identification of Reference Number
Reviewer's
S/N comment's source: Observations / Comments Discipline of Doc. or Drwg. Returned Code Response Sign-Off (Open/Closed)
Name/Oragnization
(title /page /clause) (include Revision)
Refer to the comments on the
ITP. Method statement is not
approved. Precast Specialist
contractor detail shall be
R03-C1 0C01-MHD- Revise and
1 RSG mentioned in the submittal and Civil Complied
ITPCl-0009 resubmit
specialist contractor shall follow
the same ITP presented in this
submission.
Lifting and rigging analysis to R03-C1 0C01-MHD- Revise and
2 RSG Civil Complied
be attached ITPCl-0010 resubmit
Document Review Response (RSG-DC-FRM-0002) R07-M03C20-GET-MAT-EN-0001_DRF Page 1 of 1
Rev. 00, 01-Oct -2022